Hawken Construction
- Based in
- San Anselmo
- On San Francisco permits
- Mar 2018 to Mar 2018
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2018 | Completed final sign-off May 2018 | 2034 Great Hy | open up walls extend gas line to fireplace insert thru crawlspace 4 electrical plug added. 1 switch moved, dimmer new dishwasher, range, washer/dryer (no alteration of (e) walls)Details
open up walls extend gas line to fireplace insert thru crawlspace 4 electrical plug added. 1 switch moved, dimmer new dishwasher, range, washer/dryer (no alteration of (e) walls) | $22,000 |