Harvin Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2017
- Last 24 months
- 0 permits filed
32 permits since 2000: 25 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 751 31st Av | add rear deck at 2nd floorDetails
add rear deck at 2nd floor | $3,900 |
| Jul 11, 2017 | Completed final sign-off Aug 2017 | 1739 33rd Av | install bathroom tiles on second floor. replace new tile for bathtub and floorDetails
install bathroom tiles on second floor. replace new tile for bathtub and floor | $4,000 |
| Mar 17, 2017 | Completed final sign-off Feb 2018 | 2186 14th Av | 1st floor - new bedroom, new bathroom, new family room, new internal stairs, new aluminum clad windows to match existingDetails
1st floor - new bedroom, new bathroom, new family room, new internal stairs, new aluminum clad windows to match existing | $80,000 |
| Apr 6, 2012 | Completed final sign-off Dec 2012 | 831 28th Av | legalize 1st floor layout. add study room, family room, and a bathroom. voluntary seismic retrofit.Details
legalize 1st floor layout. add study room, family room, and a bathroom. voluntary seismic retrofit. | $50,000 |
| Apr 2, 2012 | Completed final sign-off Jul 2012 | 363 Wilde Av | add one bedroom, entertainment room, full bathroom, storage and laundry room and wet bar per plan. add bthroom and remodel kitchen and bathroom remodel on 2nd floor per plan.Details
add one bedroom, entertainment room, full bathroom, storage and laundry room and wet bar per plan. add bthroom and remodel kitchen and bathroom remodel on 2nd floor per plan. | $50,000 |
| Oct 20, 2011 | Completed final sign-off Nov 2011 | 276 Waterville St | replace kitchen cabinet, countertop & floors to comply with complaint #201164069. all (n) lighting must comply with cec150(k)Details
replace kitchen cabinet, countertop & floors to comply with complaint #201164069. all (n) lighting must comply with cec150(k) | $7,500 |
| Jun 14, 2011 | Completed final sign-off Oct 2011 | 3950 23rd St | garage roof, railings & deck (dryrot) repair < 50% total deck per plan.Details
garage roof, railings & deck (dryrot) repair < 50% total deck per plan. | $6,000 |
| Dec 2, 2010 | Completed final sign-off Jan 2011 | 1235 33rd Av | legalize habitable rooms at ground floor per plan.Details
legalize habitable rooms at ground floor per plan. | $15,000 |
| Aug 16, 2010 | Completed final sign-off Sep 2010 | 5853 Mission St | deck permit unit #7. replace 2x6 flooring as nessesary. repair 2x10 floor joist less than 50%Details
deck permit unit #7. replace 2x6 flooring as nessesary. repair 2x10 floor joist less than 50% | $500 |
| Jun 28, 2010 | Completed final sign-off Mar 2011 | 119 Clearfield Dr | revision to bpa#201004200548 per plan. sheet a-3: enlarge west & south windows to 5ft. & reduce north window to 3ft. sheet a5: reduce kitchen window to 4ft. 6in. & repair & insulate walls & clgs.Details
revision to bpa#201004200548 per plan. sheet a-3: enlarge west & south windows to 5ft. & reduce north window to 3ft. sheet a5: reduce kitchen window to 4ft. 6in. & repair & insulate walls & clgs. | $2,500 |
| Apr 20, 2010 | Completed final sign-off Mar 2011 | 119 Clearfield Dr | garage floor remodeling: install 1 bedroom, 1 bathroom, 1 laundry room & new windows. remove porch & rear fireplace. 2nd floor remodeling: remodel 1 (e) kitchen, 1 (e) bathroom, replace 1 window in (e) bathroom. install 1 new bathroom & new windowDetails
garage floor remodeling: install 1 bedroom, 1 bathroom, 1 laundry room & new windows. remove porch & rear fireplace. 2nd floor remodeling: remodel 1 (e) kitchen, 1 (e) bathroom, replace 1 window in (e) bathroom. install 1 new bathroom & new window | $35,000 |
| Jan 27, 2010 | Completed final sign-off Apr 2010 | 1347 32nd Av | comply with nov# 201031724-bathroom & kitchen remodel, add bay window in kitchen, close other window in kitchen, add skylight & solar tube, insulation.Details
comply with nov# 201031724-bathroom & kitchen remodel, add bay window in kitchen, close other window in kitchen, add skylight & solar tube, insulation. | $15,000 |
| Jul 1, 2009 | Completed final sign-off Aug 2009 | 171 Langton St | repair dry rot on deck less than 50%. to comply with nov 200910165 dated 06/05/2009.Details
repair dry rot on deck less than 50%. to comply with nov 200910165 dated 06/05/2009. | $500 |
| Jun 4, 2009 | Completed final sign-off Sep 2009 | 199 Boutwell St | new bedroom, playroom, bathroom at the garage level and relocate the required parking space from interior garage to exterior covered space.Details
new bedroom, playroom, bathroom at the garage level and relocate the required parking space from interior garage to exterior covered space. | $35,000 |
| Dec 22, 2008 | Completed final sign-off May 2009 | 77 Guttenberg St | to add an exercise room, a family room, a guest room and a full bath for single family use only in 1st floorDetails
to add an exercise room, a family room, a guest room and a full bath for single family use only in 1st floor | $28,000 |
| Sep 2, 2008 | Completed final sign-off Mar 2009 | 1686 26th Av | alteration to existing 2nd floor. convert existing breakfast room to new bedroom. remodel existing kitchen and 2 baths per planDetails
alteration to existing 2nd floor. convert existing breakfast room to new bedroom. remodel existing kitchen and 2 baths per plan | $26,000 |
| May 29, 2008 | Never finaled issued May 2008, no final | 229 Lobos St | repalce bathroom wall tile and floor tile. all non-structural.Details
repalce bathroom wall tile and floor tile. all non-structural. | $3,800 |
| Oct 16, 2007 | Completed final sign-off Jun 2008 | 106 Cayuga Av | to renew expired application to renew expried application #200408091013 for final inspection onlyDetails
to renew expired application to renew expried application #200408091013 for final inspection only | |
| Jul 13, 2007 | Completed final sign-off Jan 2008 | 30 Holyoke St | add new bathroom, family room, 2 bedrooms at ground floor. no structural work.Details
add new bathroom, family room, 2 bedrooms at ground floor. no structural work. | $20,000 |
| Mar 23, 2007 | Completed final sign-off Dec 2007 | 87 Delta St | to respond complaint # 200788215(dated feb 23, 07) to remove ground floor stove, cabinet, counter, convert extg illigal kchn to laundry use and convert extg dining room to play room use. legalize extg bed room and full bath room on extg ground floor per plansDetails
to respond complaint # 200788215(dated feb 23, 07) to remove ground floor stove, cabinet, counter, convert extg illigal kchn to laundry use and convert extg dining room to play room use. legalize extg bed room and full bath room on extg ground floor per plans | $35,000 |
| Jul 13, 2006 | Completed final sign-off Feb 2013 | 14 Costa St | erect: one type 5 3-story single family dwellingDetails
erect: one type 5 3-story single family dwelling | $300,000 |
| Jul 13, 2006 | Completed final sign-off Sep 2013 | 14 Costa St | to demolish 2 story, single family dwelling.Details
to demolish 2 story, single family dwelling. | $10,000 |
| Oct 18, 2005 | Expired or cancelled expired Feb 2008 | 3643 25th St | replace 7 windows 2 on street side- refer to submitted photoDetails
replace 7 windows 2 on street side- refer to submitted photo | $2,000 |
| Aug 30, 2005 | Expired or cancelled expired Jan 2008 | 3645 25th St | remodel bathrm & kitchen to comply w/correction nov rev pa 200508110097Details
remodel bathrm & kitchen to comply w/correction nov rev pa 200508110097 | $10,000 |
| Aug 11, 2005 | Completed final sign-off Oct 2005 | 3645 25th St | to comply w/his nov 200452661 & 200558859-sheetrock removal shall be less than 2/3 of entire bldng.Details
to comply w/his nov 200452661 & 200558859-sheetrock removal shall be less than 2/3 of entire bldng. | $6,000 |
| Jun 22, 2004 | Expired or cancelled expired Feb 2005 | 2832 26th St | non-structural remodel bathroom & kitchen, install new 5/8 sheetrock 2 rms, hallwayDetails
non-structural remodel bathroom & kitchen, install new 5/8 sheetrock 2 rms, hallway | $18,000 |
| Jul 24, 2003 | Never finaled issued Jul 2003, no final | 440 Bartlett St | re-sheetrock living room,remodel bathrm & kitchen unit#3(sheetrock w/ 5/8 type"x"g.b.maintain 1 hrDetails
re-sheetrock living room,remodel bathrm & kitchen unit#3(sheetrock w/ 5/8 type"x"g.b.maintain 1 hr | $15,000 |
| Jul 15, 2003 | Completed final sign-off Dec 2003 | 1051 Cayuga Av | to comply with nov 200341325, remove sleeping rms and kitchen & bath at g/fDetails
to comply with nov 200341325, remove sleeping rms and kitchen & bath at g/f | $10,000 |
| Oct 11, 2002 | Completed final sign-off Nov 2002 | 1611 45th Av | rev. to appl#200209196963Details
rev. to appl#200209196963 | $500 |
| Sep 19, 2002 | Completed final sign-off Nov 2002 | 1611 45th Av | legalized bedroom & family room & retile bathroom & legalized bathroom per plan.Details
legalized bedroom & family room & retile bathroom & legalized bathroom per plan. | $15,000 |
| Sep 1, 2000 | Completed final sign-off May 2002 | 132 Apollo St | erect one 3-story , single family type-v building.Details
erect one 3-story , single family type-v building. | $285,000 |
| Apr 3, 2000 | Expired or cancelled expired Dec 2000 | 48 Porter St | renewal of p1 9417442 & 9417443Details
renewal of p1 9417442 & 9417443 |