Harry Jc Zhang Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Jun 2022
- Last 24 months
- 0 permits filed
8 permits since 2000: 7 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 2, 2022 | Never finaled issued Jun 2022, no final | 1378 Revere Av | remodel existing bathroom in kindDetails
remodel existing bathroom in kind | $7,000 |
| Mar 7, 2019 | Completed final sign-off Mar 2020 | 2401 Taraval St | change of use and occupancy conversion of extg toilet stall into ada unisex toilet. removal of extg garage door and replacement new wall and windows. replacement of extg exeterior door with new rated door. fire alarm and sprinkler work on separarte permits.Details
change of use and occupancy conversion of extg toilet stall into ada unisex toilet. removal of extg garage door and replacement new wall and windows. replacement of extg exeterior door with new rated door. fire alarm and sprinkler work on separarte permits. | $45,700 |
| Aug 13, 2018 | Completed final sign-off Sep 2018 | 1454 22nd Av | replace existing front three windows. wood picture windows. no change in window size.Details
replace existing front three windows. wood picture windows. no change in window size. | $3,000 |
| Jul 12, 2018 | Completed final sign-off Jan 2019 | 1844 Sacramento St | both units - remodel kitchen, bath & 1/2 bath. upgrade electrical service, 200ampsDetails
both units - remodel kitchen, bath & 1/2 bath. upgrade electrical service, 200amps | $50,000 |
| Sep 20, 2017 | Completed final sign-off Feb 2018 | 214 Lake Merced Hill No Bl | install elevator within residentail unit. no extra workDetails
install elevator within residentail unit. no extra work | $45,000 |
| Aug 25, 2017 | Completed final sign-off Mar 2018 | 167 Riverton Dr | convert (e) bathroom to one full bathroom & half bathroom, open one 2'x4' window in half bathroom at 2/f. no visable from street, construct 25'x8' deck at rear of building. legalize exercise room & bathroom at g/f. 2 new bathroom at ground floor.Details
convert (e) bathroom to one full bathroom & half bathroom, open one 2'x4' window in half bathroom at 2/f. no visable from street, construct 25'x8' deck at rear of building. legalize exercise room & bathroom at g/f. 2 new bathroom at ground floor. | $28,000 |
| Feb 24, 2017 | Completed final sign-off Mar 2018 | 924 Dwight St | convert portion of garage on 1/f into habitable space: new bedroom & bath.Details
convert portion of garage on 1/f into habitable space: new bedroom & bath. | $40,000 |
| Sep 12, 2016 | Completed final sign-off Oct 2016 | 130 Inverness Dr | change sewer pipe from gargage door to sidewalk, add sewer pipe to side house hallway, (floor drain) change lighting, cement drivewayDetails
change sewer pipe from gargage door to sidewalk, add sewer pipe to side house hallway, (floor drain) change lighting, cement driveway | $5,000 |