Hargrove Construction
- Based in
- San Rafael
- On San Francisco permits
- Aug 2022 to Aug 2022
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2022 | Completed final sign-off Dec 2022 | 373 Lombard St | unit #501: bathroom remodel. replace shower tile and shower pan with new tile. replace vanity, sink, and counter. replace mirror, shower doors, and tile floors. replace toilet.Details
unit #501: bathroom remodel. replace shower tile and shower pan with new tile. replace vanity, sink, and counter. replace mirror, shower doors, and tile floors. replace toilet. | $33,000 |