Happywood Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2026 to Aug 2026
- Last 24 months
- 4 permits filed
4 permits since 2000: 2 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | Completed final sign-off Sep 2026 | 960 Florida St | repair (e) front exterior stairs due to localized dry rot. remove/replae deteriorated wood components in-kind, including affected treatds, risers, stringers and/or framing as required. retain (e) staircase configuration dimensions and location. no change to use, dwelling or building footprint.Details
repair (e) front exterior stairs due to localized dry rot. remove/replae deteriorated wood components in-kind, including affected treatds, risers, stringers and/or framing as required. retain (e) staircase configuration dimensions and location. no change to use, dwelling or building footprint. | $10,000 |
| Jul 17, 2026 | In progress issued Sep 2026 | 420 Douglass St | remodel existing full bath in kind: replace recess led lights, replace bath door to sliding door; install electric underfloor heating, relocate light switch and heat vent. tub to shower. approximately 40 sf.Details
remodel existing full bath in kind: replace recess led lights, replace bath door to sliding door; install electric underfloor heating, relocate light switch and heat vent. tub to shower. approximately 40 sf. | $12,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 687 London St | convert(e)bonus room to(n)bedroom in garage floor by modifying exterior door and window for egress.no additional square footage to building and no work on second floor.Details
convert(e)bonus room to(n)bedroom in garage floor by modifying exterior door and window for egress.no additional square footage to building and no work on second floor. | $8,000 |
| Apr 28, 2026 | Completed final sign-off Jun 2026 | 2761 Divisadero St | stair replacement, rebuild stairs in same location at rear, dimensions, and configuration. no changes to structural laout in building. like for like.Details
stair replacement, rebuild stairs in same location at rear, dimensions, and configuration. no changes to structural laout in building. like for like. | $5,000 |