Hao Qiang Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Oct 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 28 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2025 | Completed final sign-off Mar 2026 | 721 Plymouth Av | permit is for work to be performed in general comformance w/the california existing bldg code (cebc) appendix chapter a3 (sfbc ab-108). for earthquake place + bolt program.Details
permit is for work to be performed in general comformance w/the california existing bldg code (cebc) appendix chapter a3 (sfbc ab-108). for earthquake place + bolt program. | $9,800 |
| Jun 21, 2022 | Completed final sign-off Oct 2023 | 2230 41st Av | renovation of (e) bath at 2nd level. upgrade street facade windows (2), replace (e) window ornamentation. no change to foorprint.Details
renovation of (e) bath at 2nd level. upgrade street facade windows (2), replace (e) window ornamentation. no change to foorprint. | $25,000 |
| Jan 24, 2019 | Completed final sign-off Mar 2020 | 2230 41st Av | renovation of laundry area, new bath. renovation of e doors to new frenchdoors. no change in habitable area. e 1 study, 1 storage remainDetails
renovation of laundry area, new bath. renovation of e doors to new frenchdoors. no change in habitable area. e 1 study, 1 storage remain | $40,000 |
| Sep 26, 2018 | Completed final sign-off Nov 2018 | 665 San Jose Av | recommencement and completion of work approved under pa201505216937. maher n/a.Details
recommencement and completion of work approved under pa201505216937. maher n/a. | $6,000 |
| May 10, 2018 | Completed final sign-off Feb 2019 | 833 Edinburgh St | g/f: add 2 bedrooms, 1 full bathroom, 1 study, 1 family room on (e) g/f.Details
g/f: add 2 bedrooms, 1 full bathroom, 1 study, 1 family room on (e) g/f. | $90,000 |
| Apr 24, 2017 | Completed final sign-off Jul 2017 | 1170 04th St | install 6 new head under new drop ceiling per nfpa#13. ref t.i. # 201611152686 n/a for maherDetails
install 6 new head under new drop ceiling per nfpa#13. ref t.i. # 201611152686 n/a for maher | $3,950 |
| Apr 24, 2017 | Completed final sign-off May 2017 | 88 Robinson Dr | structural strengtheing retrofit is for work to be performed in genersl conformance with cebc, appendix cahapter a3 (sfbc ab-108) & 5/8" diameter x 10" anchor bolt at 4'-0" o.c. with epoxy, and simpson strong tie ufp10, & 15/32" thick sheathing with 8d nail.Details
structural strengtheing retrofit is for work to be performed in genersl conformance with cebc, appendix cahapter a3 (sfbc ab-108) & 5/8" diameter x 10" anchor bolt at 4'-0" o.c. with epoxy, and simpson strong tie ufp10, & 15/32" thick sheathing with 8d nail. | $4,500 |
| Mar 17, 2017 | Completed final sign-off Sep 2017 | 1435 Silver Av | re-tile exterior stairs, 12 steps, 1 platform. not to exceed 50%Details
re-tile exterior stairs, 12 steps, 1 platform. not to exceed 50% | $1,300 |
| Nov 3, 2016 | Completed final sign-off Dec 2016 | 1516 Powell St | to comply with nov#201640081. repair rear exterior wood stairs item #3 of nov; repair is less than 50% of stairs.Details
to comply with nov#201640081. repair rear exterior wood stairs item #3 of nov; repair is less than 50% of stairs. | $8,000 |
| Nov 3, 2016 | Completed final sign-off May 2017 | 171 Cook St | install 9 sprinklers on the 4th fl only per nfpa 13r ti 201609238668Details
install 9 sprinklers on the 4th fl only per nfpa 13r ti 201609238668 | $3,500 |
| Aug 3, 2015 | Completed final sign-off Oct 2016 | 827 Sacramento St | nonstructural interior t.i. to an extg retail space including modification of bathroom and addition of power door operators pushplates, no change to existing storefront configuration.Details
nonstructural interior t.i. to an extg retail space including modification of bathroom and addition of power door operators pushplates, no change to existing storefront configuration. | $40,000 |
| Aug 6, 2014 | Completed final sign-off Dec 2014 | 1626 40th Av | basement remodel. add and legalize 2 (n) bedrooms and (n) bathroom on 1st flrDetails
basement remodel. add and legalize 2 (n) bedrooms and (n) bathroom on 1st flr | $25,000 |
| Jul 11, 2014 | Completed final sign-off Jun 2025 | 78 John St | legalize 1 bath room, play room, add 1 bedroom and half-bath at 1st fl per planDetails
legalize 1 bath room, play room, add 1 bedroom and half-bath at 1st fl per plan | $29,700 |
| Jun 25, 2013 | Completed final sign-off Aug 2013 | 35 Waverly Pl | remodel kitchen for units a & b. install ada handle bar for bathroom, units a&b. to comply with his nov#201392641 dated 3/18/2013 to comply with ordinance 029-33 only. installation of grab bars at the following locations: bathrooms @ 2nd & 3rd floors.Details
remodel kitchen for units a & b. install ada handle bar for bathroom, units a&b. to comply with his nov#201392641 dated 3/18/2013 to comply with ordinance 029-33 only. installation of grab bars at the following locations: bathrooms @ 2nd & 3rd floors. | $7,500 |
| Jun 18, 2013 | Completed final sign-off Oct 2013 | 30 Auburn St | remodel kitchen, 1-1/2 bath, rewire whole flat, upgrade service to 200 amp.Details
remodel kitchen, 1-1/2 bath, rewire whole flat, upgrade service to 200 amp. | $25,000 |
| Jul 18, 2012 | Never finaled issued Jul 2012, no final | 1242 Athens St | repair 5'x7' of siding on right side of house in kind.Details
repair 5'x7' of siding on right side of house in kind. | $1,050 |
| Jul 9, 2012 | Completed final sign-off Aug 2012 | 2168 17th Av | sheetrock 1100 sq ft on ground floor, relocate subpanel & rewire bedroom, study room, laundry room.Details
sheetrock 1100 sq ft on ground floor, relocate subpanel & rewire bedroom, study room, laundry room. | $5,500 |
| Mar 14, 2012 | Completed final sign-off May 2012 | 168 Langton St | revisions to app#201009271685. relocate extg furnace and water heater back to garage area per plan.Details
revisions to app#201009271685. relocate extg furnace and water heater back to garage area per plan. | |
| Feb 2, 2012 | Completed final sign-off Apr 2012 | 2127 Irving St | install 2 shampoo units with proper drainage connect to existing sewer lateral per plan.Details
install 2 shampoo units with proper drainage connect to existing sewer lateral per plan. | $1,500 |
| Jul 22, 2011 | Completed final sign-off Jan 2012 | 1852 08th Av | replace damaged siding.Details
replace damaged siding. | $5,500 |
| Aug 17, 2010 | Completed final sign-off Sep 2010 | 517 Minna St | rebuild e rear stairs in same confirguration of existing stairs without having to comply with current code. comply with his nov 200924851 dated 10-21-09Details
rebuild e rear stairs in same confirguration of existing stairs without having to comply with current code. comply with his nov 200924851 dated 10-21-09 | $8,000 |
| May 4, 2009 | Completed final sign-off May 2009 | 235 Molimo Dr | replace back side siding. work is not visible from the public way. remove & replace with new material. replace as like-kind.Details
replace back side siding. work is not visible from the public way. remove & replace with new material. replace as like-kind. | $5,000 |
| Mar 10, 2009 | Completed final sign-off Oct 2009 | 28 Hemway Tr | remodel kitchen, 1 & 1/2 bath, living room, (3 sides & ceiling) remove plaster resheetrock garage: removed plaster, replace with sheetrock (3 sides & ceiling) total 2084 sqft. sheetrock (30'x20'=600 ft) provide min 50% of light watts in kitchen in fluorescent lights. fluorescent light or occupanyDetails
remodel kitchen, 1 & 1/2 bath, living room, (3 sides & ceiling) remove plaster resheetrock garage: removed plaster, replace with sheetrock (3 sides & ceiling) total 2084 sqft. sheetrock (30'x20'=600 ft) provide min 50% of light watts in kitchen in fluorescent lights. fluorescent light or occupany | $34,000 |
| Jan 5, 2009 | Completed final sign-off Jun 2009 | 1658 38th Av | to continue work approved under pa 200701232326.Details
to continue work approved under pa 200701232326. | $20,000 |
| Apr 24, 2008 | Completed final sign-off Aug 2008 | 1382 38th Av | convert a portion of ex. garage to add 1 family rm, 1 bedroom and 1 full bath.Details
convert a portion of ex. garage to add 1 family rm, 1 bedroom and 1 full bath. | $25,000 |
| Mar 13, 2008 | Completed final sign-off Jul 2008 | 63 Ledyard St | 1 new bedroom, 1 office, 1 storage & 2 toilet rooms to be constructed at ground floor.Details
1 new bedroom, 1 office, 1 storage & 2 toilet rooms to be constructed at ground floor. | $30,000 |
| Mar 10, 2008 | Completed final sign-off May 2008 | 1422 24th Av | repair stucco, install proper ventilation at front of building. area around 3'x6'.Details
repair stucco, install proper ventilation at front of building. area around 3'x6'. | $1,500 |
| Jun 14, 2007 | Never finaled issued Jun 2007, no final | 1024 Randolph St | furnace heat & replace water heater ground floor replacedDetails
furnace heat & replace water heater ground floor replaced | $5,000 |
| May 16, 2007 | Completed final sign-off Apr 2009 | 2026 34th Av | to add one bedroom. one playroom/laundry room and one full bathroom on (e) groundfloor per groundfloor plan. and also to divide (e) one full bath to new two full bathroom and remodel (e) kitchen on existing 2nd floor per 2nd floor plan.Details
to add one bedroom. one playroom/laundry room and one full bathroom on (e) groundfloor per groundfloor plan. and also to divide (e) one full bath to new two full bathroom and remodel (e) kitchen on existing 2nd floor per 2nd floor plan. | $42,000 |
| Apr 11, 2007 | Completed final sign-off Sep 2007 | 1024 Randolph St | remodel first floor space. construct (n) partition walls for bedroom, family room and bathroom & new laundry.Details
remodel first floor space. construct (n) partition walls for bedroom, family room and bathroom & new laundry. | $15,000 |