Hal Pierce Electric Co
- Based in
- Vallejo
- On San Francisco permits
- Jun 2006 to Jul 2006
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2006 | Never finaled issued Jul 2006, no final | 268 Dore St | equivalency to providing required 7' headroom in studios #18, 20, 23, 25, provide 36" high open guardrail at line of 7' headroom. rev. to (e) permits #2005/04/12/9789s1/r11 & 2006/06/05/3198 currently under constructionDetails
equivalency to providing required 7' headroom in studios #18, 20, 23, 25, provide 36" high open guardrail at line of 7' headroom. rev. to (e) permits #2005/04/12/9789s1/r11 & 2006/06/05/3198 currently under construction | |
| Jun 5, 2006 | Never finaled issued Jun 2006, no final | 268 Dore St | minor revisions / clarifications to pa# 2005/04/12/9789 s1 r11. currently under construction including: re-location of 2nd floor studios # 19, 21, 22, 24; lower ceiling height in front of building (bathrooms, entry lobby & studios # 12 & # 17) ; provide alternate construction detail for (1 hour /Details
minor revisions / clarifications to pa# 2005/04/12/9789 s1 r11. currently under construction including: re-location of 2nd floor studios # 19, 21, 22, 24; lower ceiling height in front of building (bathrooms, entry lobby & studios # 12 & # 17) ; provide alternate construction detail for (1 hour / |