H P Construction
- Based in
- Pacifica
- On San Francisco permits
- Jun 2009 to Jan 2014
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2014 | Completed final sign-off Mar 2014 | 721 Rockdale Dr | remodel kitchen, replace cabinets, couners, new finish plumbing, electrical no rough in wire finish only, kitchen lighting min 50% wattage in high efficacy lightingDetails
remodel kitchen, replace cabinets, couners, new finish plumbing, electrical no rough in wire finish only, kitchen lighting min 50% wattage in high efficacy lighting | $15,000 |
| Aug 1, 2012 | Completed final sign-off Oct 2012 | 786 Myra Wy | kitchen remodel - new electrical, plumbing, replace 1 existing window, max u factor is 0.40. switches recessed lights & flourecent under cab lights. upgrade existing 100amp electrical service, create new openings for new window in ktichen, new header.Details
kitchen remodel - new electrical, plumbing, replace 1 existing window, max u factor is 0.40. switches recessed lights & flourecent under cab lights. upgrade existing 100amp electrical service, create new openings for new window in ktichen, new header. | $35,000 |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 786 Myra Wy | remodel bathroom, layout to remain the same @ 2/f, new fixtures, electrical, plumbing, tiling. no structural work, new lighting comply with cec 150(k)Details
remodel bathroom, layout to remain the same @ 2/f, new fixtures, electrical, plumbing, tiling. no structural work, new lighting comply with cec 150(k) | $12,600 |
| Jun 19, 2009 | Completed final sign-off Sep 2009 | 786 Myra Wy | legalize/convert workroom to bedroom on garage level. demo complete (e) bathroom & concrete slab on garage level bedroom side. re-construct bath & concrete slab. add new deck at 2nd floorDetails
legalize/convert workroom to bedroom on garage level. demo complete (e) bathroom & concrete slab on garage level bedroom side. re-construct bath & concrete slab. add new deck at 2nd floor | $39,000 |