H O S Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2009 to Jul 2010
- Last 24 months
- 0 permits filed
5 permits since 2000: 3 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2010 | Expired or cancelled expired Feb 2011 | 278 Topaz Wy | interior renovation of ktichen - two bathrooms & one power room. add lights, replace (e) hot water heater & furnace. repair (e) fireplace, install (n) master bedroom gas fireplace & laundry sink. replace flooring, (n) trim throughout.Details
interior renovation of ktichen - two bathrooms & one power room. add lights, replace (e) hot water heater & furnace. repair (e) fireplace, install (n) master bedroom gas fireplace & laundry sink. replace flooring, (n) trim throughout. | $78,000 |
| Jun 9, 2010 | Completed final sign-off Oct 2010 | 45 Cervantes Bl | construction of a rear 2nd floor deck at exterior. the deck accessible from new doors. exterior will receive new siding & windows. deck structure will be constructed of wood & steel seismic connections with materials designed by a licensed engineer.Details
construction of a rear 2nd floor deck at exterior. the deck accessible from new doors. exterior will receive new siding & windows. deck structure will be constructed of wood & steel seismic connections with materials designed by a licensed engineer. | $8,000 |
| May 28, 2010 | Completed final sign-off Jun 2010 | 545 Sanchez St | eliminate a proposed window downstairs @ bathrm. 3/4 hr. firerated closer than 3'-0" to prop. line. bathrm. already artificially lit & mechanically ventilated. inspector will final pending this revision (ref. appl. #200907303816).Details
eliminate a proposed window downstairs @ bathrm. 3/4 hr. firerated closer than 3'-0" to prop. line. bathrm. already artificially lit & mechanically ventilated. inspector will final pending this revision (ref. appl. #200907303816). | |
| Feb 4, 2010 | Completed final sign-off Nov 2010 | 2027 Jefferson St | infill (e) east lightwell 2 stories high, replace & enlarge (e) windows & doors at facade, west, rear w/new insul units interior remodel on all floors, 1st-expand (e) garage, remodel (e)bath & laudnry, 2nd- expand kitchen, remdoel m. bed & relocate m. bath, 3rd - remodel (e)bedrm, relcoate (e) bath.Details
infill (e) east lightwell 2 stories high, replace & enlarge (e) windows & doors at facade, west, rear w/new insul units interior remodel on all floors, 1st-expand (e) garage, remodel (e)bath & laudnry, 2nd- expand kitchen, remdoel m. bed & relocate m. bath, 3rd - remodel (e)bedrm, relcoate (e) bath. | $193,000 |
| Dec 21, 2009 | Never finaled issued Dec 2009, no final | 4381 17th St | three stories vill be sided, visible from stret, replce in kind.Details
three stories vill be sided, visible from stret, replce in kind. | $20,000 |