H. Galan Construction
- Based in
- San Mateo
- On San Francisco permits
- Feb 2004 to Nov 2025
- Last 24 months
- 1 permit filed
3 permits since 2000: 1 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2025 | Completed final sign-off Dec 2025 | 366 Alemany Bl | repair/replace existing exterior cedar siding. approx 800 sq ft. street visible.Details
repair/replace existing exterior cedar siding. approx 800 sq ft. street visible. | $15,000 |
| Mar 30, 2009 | Never finaled issued Sep 2009, no final | 1296 Shotwell St | installation of spray booth and remodel/enlarge (e) office. re-tile bathrooms, replace bathroom fixtures. fix only the ramp and modify doorwayDetails
installation of spray booth and remodel/enlarge (e) office. re-tile bathrooms, replace bathroom fixtures. fix only the ramp and modify doorway | $8,000 |
| Feb 10, 2004 | Expired or cancelled withdrawn Sep 2004 | 4726 Mission St | implement new electrical system (include new lighting change of use for future coffee shop new plumbDetails
implement new electrical system (include new lighting change of use for future coffee shop new plumb | $80,000 |