H And B Construction Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2015 to Jun 2026
- Last 24 months
- 5 permits filed
23 permits since 2000: 17 completed, 3 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 22, 2026 | In progress issued Jun 2026 | 792 32nd Av | kitchen and laundry room remodel in kind. replace existing washer and dryer with new appliances.Details
kitchen and laundry room remodel in kind. replace existing washer and dryer with new appliances. | $18,000 |
| Sep 23, 2025 | Completed final sign-off May 2026 | 5115 Anza St | to obtain final inspection for work approved under pa 201709087457 and 201905171035. all work is complete.Details
to obtain final inspection for work approved under pa 201709087457 and 201905171035. all work is complete. | |
| Aug 4, 2025 | In progress issued Aug 2025 | 1916 Lake St | apply non-shrink grout in bottom of the footing of the deck. ref pa# 2022-1102-5698 & ref pa# 2022-0329-1107Details
apply non-shrink grout in bottom of the footing of the deck. ref pa# 2022-1102-5698 & ref pa# 2022-0329-1107 | $10,000 |
| Aug 4, 2025 | Completed final sign-off Dec 2025 | 586 35th Av | replace front stucco and replace four new windows for vinyl window street visible.Details
replace front stucco and replace four new windows for vinyl window street visible. | $9,800 |
| Oct 15, 2024 | Completed final sign-off Feb 2025 | 826 46th Av | replace siding in back of property, not street visible.Details
replace siding in back of property, not street visible. | $8,000 |
| Aug 8, 2024 | Completed final sign-off Sep 2025 | 1547 Revere Av | to comply with nov# 202057513. convert 1st floor habitable space into a new residential unit with new kitchen.Details
to comply with nov# 202057513. convert 1st floor habitable space into a new residential unit with new kitchen. | $30,000 |
| Jun 17, 2024 | Completed final sign-off Mar 2025 | 5115 Anza St | fix dryrot 1x wood boards under stucco and around windows. replace 30 wood windows on 2nd and 3rd floor. wood for wood windows. upper sash to contain 8 lites.Details
fix dryrot 1x wood boards under stucco and around windows. replace 30 wood windows on 2nd and 3rd floor. wood for wood windows. upper sash to contain 8 lites. | $3,000 |
| Mar 7, 2024 | Completed final sign-off Dec 2025 | 5115 Anza St | replace (e) stucco (n) stucco. all four sides.Details
replace (e) stucco (n) stucco. all four sides. | $35,000 |
| Oct 16, 2023 | Expired or cancelled withdrawn Aug 2025 | 5115 Anza St | revision to pa# 202310068204, change concrete to 2500 .psiDetails
revision to pa# 202310068204, change concrete to 2500 .psi | |
| Oct 6, 2023 | Completed final sign-off Aug 2024 | 5115 Anza St | reviison to pa# 201709087457. add 4 post footings.Details
reviison to pa# 201709087457. add 4 post footings. | $2,000 |
| Aug 14, 2023 | Completed final sign-off Sep 2026 | 2601 Mcallister St | full t.i at cafe. approvx 740 sq. ft. change of use fron laundry to limited cafe remodel (e) non-ada restroom.Details
full t.i at cafe. approvx 740 sq. ft. change of use fron laundry to limited cafe remodel (e) non-ada restroom. | $50,000 |
| Mar 29, 2022 | In progress issued Jun 2024 | 1918 Lake St | 1st fl: horizontal enlargement. add family room & bathroom. 2nd fl: replace existing deck. add stair well and stairs to the first floor. no bldg height increase. no change on front of the building.Details
1st fl: horizontal enlargement. add family room & bathroom. 2nd fl: replace existing deck. add stair well and stairs to the first floor. no bldg height increase. no change on front of the building. | $125,000 |
| May 17, 2019 | Completed final sign-off Dec 2025 | 5115 Anza St | replace and reinforce extg building foundationDetails
replace and reinforce extg building foundation | $20,000 |
| Jan 24, 2019 | Completed final sign-off Aug 2019 | 1519 Palou Av | remodel kitchen (10'x10') and replace drywall 1500 sq ft 5/8" type "x" with 5d cooler nails.Details
remodel kitchen (10'x10') and replace drywall 1500 sq ft 5/8" type "x" with 5d cooler nails. | $200 |
| Nov 30, 2018 | Completed final sign-off Feb 2019 | 686 Hayes St | work on 1st floor. kitchen area = 160 sqft. kitchen remodel. flooring, cabinets, ceiling (partial), adding led overhead lights. all work within one unit. no work in common areas. no impact to egress. no increase in square footage. no change to occupancy.Details
work on 1st floor. kitchen area = 160 sqft. kitchen remodel. flooring, cabinets, ceiling (partial), adding led overhead lights. all work within one unit. no work in common areas. no impact to egress. no increase in square footage. no change to occupancy. | $10,000 |
| Jul 30, 2018 | Completed final sign-off Oct 2018 | 1515 Van Dyke Av | to obtain final inspection for work approved under pa #201504284763. all work is complete.Details
to obtain final inspection for work approved under pa #201504284763. all work is complete. | |
| Jun 4, 2018 | Completed final sign-off Jul 2024 | 4 Card Al | 2nd floor - kitchen remodel, add new 3-fixture full bath, remodel 1 bathroom, remove (e) powder room. 3rd floor - add 3-fiixture full bath, remodel 1 bathroom, kitchen remodel, convert (e) office into bedroomDetails
2nd floor - kitchen remodel, add new 3-fixture full bath, remodel 1 bathroom, remove (e) powder room. 3rd floor - add 3-fiixture full bath, remodel 1 bathroom, kitchen remodel, convert (e) office into bedroom | $40,000 |
| Feb 7, 2018 | Completed final sign-off Aug 2019 | 1519 Palou Av | convert (e) study and sunroom to new bedrooms; reconfigure interior layout on 2nd floor per plan. foundation repair on 2nd floor per plan. replace exsterior wood siding in-kind per planDetails
convert (e) study and sunroom to new bedrooms; reconfigure interior layout on 2nd floor per plan. foundation repair on 2nd floor per plan. replace exsterior wood siding in-kind per plan | $25,000 |
| Sep 18, 2017 | Completed final sign-off Jul 2021 | 632 03rd Av | renovate lower unit to add additional bedroom suite with tv room at (e) space behind garage at g/f with new interior stair. total net increase of conditioned space =653 sq.ft. replace sidings windows at back, repair guardrail wall at l3, repair (e) stair at back.Details
renovate lower unit to add additional bedroom suite with tv room at (e) space behind garage at g/f with new interior stair. total net increase of conditioned space =653 sq.ft. replace sidings windows at back, repair guardrail wall at l3, repair (e) stair at back. | $112,000 |
| Sep 8, 2017 | Expired or cancelled expired May 2026 | 5115 Anza St | per ordinance# 162-16. convert basement garage to additional dwelling unit, two new bathrooms, 3 new bedrooms, 1 kitchen.Details
per ordinance# 162-16. convert basement garage to additional dwelling unit, two new bathrooms, 3 new bedrooms, 1 kitchen. | $72,000 |
| Mar 22, 2017 | Completed final sign-off Sep 2017 | 611 03rd Av | remodel kitchen and 2 baths, upgrade elec. install new furnaceDetails
remodel kitchen and 2 baths, upgrade elec. install new furnace | $30,000 |
| Mar 21, 2017 | Expired or cancelled cancelled Jul 2017 | 611 03rd Av | replace front windows in-kind with wood windows.Details
replace front windows in-kind with wood windows. | $2,000 |
| Dec 3, 2015 | Completed final sign-off Jan 2022 | 225 Madison St | vertical & horizontal addition @ rear. add laundry room & convert bathroom to half bathroof @ 1st fl. remove bedroom & closet on 1st fl. (n) (3) bedroom & (3) bathroom @ 2nd fl.Details
vertical & horizontal addition @ rear. add laundry room & convert bathroom to half bathroof @ 1st fl. remove bedroom & closet on 1st fl. (n) (3) bedroom & (3) bathroom @ 2nd fl. | $125,000 |