Guzzetta Construction
- Based in
- San Jose
- On San Francisco permits
- Nov 2014 to Feb 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 23, 2015 | Completed final sign-off Jul 2015 | 562 Noriega St | upper floor: retile bathroom, bring up electrical to code, repalce existing tub, like to like. replace existing pedestal sink, light sconces. bathroom remodel.Details
upper floor: retile bathroom, bring up electrical to code, repalce existing tub, like to like. replace existing pedestal sink, light sconces. bathroom remodel. | $4,500 |
| Nov 21, 2014 | Never finaled issued Jan 2015, no final | 562 Noriega St | remodel kitchen within of extg kitchen and breakfast nook. remodel bathrooms within space of exgt bathroom. enlarge shower area.Details
remodel kitchen within of extg kitchen and breakfast nook. remodel bathrooms within space of exgt bathroom. enlarge shower area. | $55,000 |