Gust Enterprises
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Apr 2000
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2000 | Completed final sign-off Jan 2001 | 3221 Washington St | demo of int. finishes to uncover enough of the struct. membersDetails
demo of int. finishes to uncover enough of the struct. members | $5,000 |
| Apr 21, 2000 | Completed final sign-off May 2000 | 1447 Jones St | replace a portion of treads, risers on outside striner, back wood stairwayDetails
replace a portion of treads, risers on outside striner, back wood stairway | $2,800 |
| Apr 13, 2000 | Completed final sign-off Apr 2000 | 34 West Clay St | refer to bldg. pa 200003023344, additional work to 2x6 studs & top plateDetails
refer to bldg. pa 200003023344, additional work to 2x6 studs & top plate | $10,000 |
| Mar 2, 2000 | Completed final sign-off Apr 2000 | 34 West Clay St | replace dcek surface of top of garage,remove tile/montar & replace w/elastomeric,install drainDetails
replace dcek surface of top of garage,remove tile/montar & replace w/elastomeric,install drain | |
| Mar 2, 2000 | Completed final sign-off Aug 2000 | 530 47th Av | remodel kitchen in same space as existing, new cabinets,appliances,elec,plbgDetails
remodel kitchen in same space as existing, new cabinets,appliances,elec,plbg | |
| Jan 26, 2000 | Completed final sign-off Mar 2000 | 2844 Polk St | correct items listed on dbi report-corlettDetails
correct items listed on dbi report-corlett | $19,000 |
| Jan 19, 2000 | Completed final sign-off Oct 2000 | 601 Sanchez St | bathroom remodeling on 2nd floorDetails
bathroom remodeling on 2nd floor | $14,000 |