Grupe Bros Heating & Air
- Based in
- Petaluma
- On San Francisco permits
- Jul 2015 to Jan 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2016 | Completed final sign-off Jan 2017 | 156 Grattan St | replacing 2 furnaces, 7 duct runs- second, 8 duct runs- third floor; units under 400 lbs.; exposed duct work within a garage area to be 26 ga. rigid & insulated.Details
replacing 2 furnaces, 7 duct runs- second, 8 duct runs- third floor; units under 400 lbs.; exposed duct work within a garage area to be 26 ga. rigid & insulated. | $17,480 |
| Jul 17, 2015 | Completed final sign-off Jun 2016 | 43 Toledo Wy | replace furnace & duct works, les 40'-0" long 80000 btu 96% variable speed furnace unit less than 400 lbs; maher n/aDetails
replace furnace & duct works, les 40'-0" long 80000 btu 96% variable speed furnace unit less than 400 lbs; maher n/a | $10,486 |