Grundy Construction Co
- Based in
- San Rafael
- On San Francisco permits
- Jun 2001 to Sep 2013
- Last 24 months
- 0 permits filed
12 permits since 2000: 12 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 3, 2013 | Completed final sign-off Sep 2013 | 1925 Wawona St | remove existing compostion shingles & replace with new 40 uyear compostion shingles.Details
remove existing compostion shingles & replace with new 40 uyear compostion shingles. | $14,000 |
| Dec 17, 2012 | Completed final sign-off Dec 2012 | 66 Sotelo Av | to obtain final inspection for work approved under pa# 200509152965. all work is completeDetails
to obtain final inspection for work approved under pa# 200509152965. all work is complete | |
| Dec 17, 2012 | Completed final sign-off Feb 2013 | 66 Sotelo Av | remove existing wood sash one in downstairs room & 1 in upstairs dining room. replace with marvin ultimate double insulated low e glass. woor primed inside 36" x 48" & aluminum white clad outside. awming windows install in existing frames size to remain the same. u factor =.4 maxDetails
remove existing wood sash one in downstairs room & 1 in upstairs dining room. replace with marvin ultimate double insulated low e glass. woor primed inside 36" x 48" & aluminum white clad outside. awming windows install in existing frames size to remain the same. u factor =.4 max | $5,200 |
| Nov 5, 2012 | Completed final sign-off Jan 2013 | 66 Sotelo Av | remove & replace stripon left side of drive way. 4 steps to back yard, 3x5 retaining wall & small walk way at bottom of steps.Details
remove & replace stripon left side of drive way. 4 steps to back yard, 3x5 retaining wall & small walk way at bottom of steps. | $5,000 |
| Sep 4, 2012 | Completed final sign-off Nov 2012 | 66 Sotelo Av | do all permeation and sulurry grouting at outlined in rollo and rioley geotechnical report dated 12/30/09 job 1092.1. plans by divij consulting inc dated 8/22/12 job 12-220801 & cd of report by rolo & rioley geotechnical in engieer & scientistDetails
do all permeation and sulurry grouting at outlined in rollo and rioley geotechnical report dated 12/30/09 job 1092.1. plans by divij consulting inc dated 8/22/12 job 12-220801 & cd of report by rolo & rioley geotechnical in engieer & scientist | $79,000 |
| Aug 25, 2011 | Completed final sign-off Mar 2012 | 66 Sotelo Av | remove (26) existing vinyle windows installed improperly & replacw with new windows to match existing. all windows in front will be marvin wood clad, windows or wood fiber glass windows.Details
remove (26) existing vinyle windows installed improperly & replacw with new windows to match existing. all windows in front will be marvin wood clad, windows or wood fiber glass windows. | $19,500 |
| Mar 28, 2011 | Completed final sign-off May 2011 | 1925 Wawona St | demolition of existing retaining wall 52' long and build back as per drawing and install drainage per drawing, height of retaining wall 4' to 5' tall above grade frm east to west. wall to be built in exact same location & height.Details
demolition of existing retaining wall 52' long and build back as per drawing and install drainage per drawing, height of retaining wall 4' to 5' tall above grade frm east to west. wall to be built in exact same location & height. | $40,300 |
| Sep 16, 2008 | Completed final sign-off Apr 2009 | 751 47th Av | remove t-11 siding on uppger portion of left side of house. replace all galvinized flashing & install copper flashing. reinstall 1" x 8" v-groove clear redwood rustil siding. painting to be done by others.Details
remove t-11 siding on uppger portion of left side of house. replace all galvinized flashing & install copper flashing. reinstall 1" x 8" v-groove clear redwood rustil siding. painting to be done by others. | $11,000 |
| Feb 10, 2003 | Completed final sign-off Jul 2003 | 30 Balceta Av | remove front + brick staire to remove & repair dry rott & termite damage. install new hotmop meribanDetails
remove front + brick staire to remove & repair dry rott & termite damage. install new hotmop meriban | $15,000 |
| Sep 13, 2002 | Completed final sign-off May 2003 | 30 Balceta Av | remove stucco where necessary.remove & replace all day rotted members on rear & sides of house.restuDetails
remove stucco where necessary.remove & replace all day rotted members on rear & sides of house.restu | $50,000 |
| Sep 10, 2001 | Completed final sign-off Sep 2001 | 1381 20th Av | remove & replace dryrot members at rear of building clarify 2001/06/28/2619.Details
remove & replace dryrot members at rear of building clarify 2001/06/28/2619. | $7,000 |
| Jun 28, 2001 | Completed final sign-off Sep 2001 | 1381 20th Av | remove & replace v-groove rustic where necessary at side of bldng visible siding from streetDetails
remove & replace v-groove rustic where necessary at side of bldng visible siding from street | $10,000 |