Ground Builders Llc
- Based in
- Sacramento
- On San Francisco permits
- Jan 2026 to Jul 2026
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | In progress filed Jul 2026, not yet issued | 363 Park St | revision to 2026-01225-4300. per hrr "c" classification, new 2nd fl windows, remove and level facade crown. skylight modification. 1st and 2nd fl room reconfigurations. associated framing updates.Details
revision to 2026-01225-4300. per hrr "c" classification, new 2nd fl windows, remove and level facade crown. skylight modification. 1st and 2nd fl room reconfigurations. associated framing updates. | |
| Jan 22, 2026 | In progress issued Feb 2026 | 363 Park St | 1st fl - excavate 1.5 at rear storage for added habitable space (3 bed/2 bath); new exterior stair with firewall. relocate entry to east side.2/f: reduce massing of (e) non-comforming ne corner. (2) lightwell infills at east.Details
1st fl - excavate 1.5 at rear storage for added habitable space (3 bed/2 bath); new exterior stair with firewall. relocate entry to east side.2/f: reduce massing of (e) non-comforming ne corner. (2) lightwell infills at east. | $162,000 |