Grey Water Landscape Design
- Based in
- Encinitas
- On San Francisco permits
- Mar 2023 to Mar 2023
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2023 | Never finaled issued Mar 2023, no final | 1470 Portola Dr | installation of a pump driven grey water system from the master shower to the single family residence, shower water will flow into the surge tank and will be pumped to 20 mulch basins in the lanscape, diverter valve and back flow preventer will be installedDetails
installation of a pump driven grey water system from the master shower to the single family residence, shower water will flow into the surge tank and will be pumped to 20 mulch basins in the lanscape, diverter valve and back flow preventer will be installed | $6,000 |