Greenstar Builders Inc
- Based in
- Danville
- On San Francisco permits
- Apr 2016 to Jun 2026
- Last 24 months
- 4 permits filed
37 permits since 2000: 24 completed, 4 in progress, 5 never finaled, 4 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Jun 2026 | 455 Vallejo St | unit #310 (aka 110) revision to pa #202605060808 to specify in plans, that existing walls remain the same.Details
unit #310 (aka 110) revision to pa #202605060808 to specify in plans, that existing walls remain the same. | |
| May 6, 2026 | In progress issued May 2026 | 455 Vallejo St | comply with nov 202547408. unit 310 (aka 110) removal of non bearing walls at kitchen area to improve the functionality of the space. no work in other area of unitDetails
comply with nov 202547408. unit 310 (aka 110) removal of non bearing walls at kitchen area to improve the functionality of the space. no work in other area of unit | |
| Apr 24, 2026 | In progress issued May 2026 | 428 Monterey Bl | kitchen alterations. interior demolition to include portions of floors,ceiling,walls, and wall finishesDetails
kitchen alterations. interior demolition to include portions of floors,ceiling,walls, and wall finishes | $40,000 |
| Mar 25, 2025 | Completed final sign-off Jul 2025 | 576 Dewey Bl | bathroom remodel. remove all plumbing and electrical fixtures. replace all fixtures. redo walk in shower, new tile on shower pan and shower walls. paintDetails
bathroom remodel. remove all plumbing and electrical fixtures. replace all fixtures. redo walk in shower, new tile on shower pan and shower walls. paint | $15,000 |
| Oct 1, 2024 | Completed final sign-off Oct 2024 | 576 Dewey Bl | one bathroom remodel. all work in-kind like for like, replace tub, toilet, fixtures, paint.Details
one bathroom remodel. all work in-kind like for like, replace tub, toilet, fixtures, paint. | $10,000 |
| Mar 8, 2024 | Completed final sign-off Jul 2024 | 455 Vallejo St | one bathroom & one kitchen remodel. add recessed lights new cabinets, counters & new fixtures. non structural remodelDetails
one bathroom & one kitchen remodel. add recessed lights new cabinets, counters & new fixtures. non structural remodel | $30,000 |
| Mar 7, 2024 | In progress issued Mar 2024 | 66 Marston Av | like for like kitchen remodeling. install new cabinets, countertops, and backsplash.Details
like for like kitchen remodeling. install new cabinets, countertops, and backsplash. | $15,000 |
| Dec 19, 2022 | Never finaled issued Dec 2022, no final | 621 Noriega St | one bathroom remodel non structural: demo replacement of all fixtures, tile, replace light fixtures.Details
one bathroom remodel non structural: demo replacement of all fixtures, tile, replace light fixtures. | $15,000 |
| Oct 25, 2022 | Completed final sign-off Apr 2023 | 621 Noriega St | one bathroom remodel. non structural. no floor plan changes.Details
one bathroom remodel. non structural. no floor plan changes. | $12,000 |
| Sep 14, 2022 | Expired or cancelled expired Feb 2025 | 2209 Webster St | like to like kitchen remodel, replace cabinets, counters, back splash, new recessed + pendant lights, new gfci outlets.Details
like to like kitchen remodel, replace cabinets, counters, back splash, new recessed + pendant lights, new gfci outlets. | $20,000 |
| Jun 29, 2022 | Completed final sign-off Oct 2022 | 2209 Webster St | an existing sfh to document the change of use from office which is not permitable back to its original use as a single family residence. there is no expansion and no structural work.Details
an existing sfh to document the change of use from office which is not permitable back to its original use as a single family residence. there is no expansion and no structural work. | |
| Jun 16, 2022 | Completed final sign-off Aug 2022 | 17 Hill St | kitchen remodel for 17 hill st. & relocate laundry roomDetails
kitchen remodel for 17 hill st. & relocate laundry room | $30,000 |
| Mar 9, 2022 | Expired or cancelled withdrawn Jul 2024 | 336 Gold Mine Dr | new construction of 3 windows, non street facing. convert closet into bathroom addition. g/f: creating wet bar/sink.Details
new construction of 3 windows, non street facing. convert closet into bathroom addition. g/f: creating wet bar/sink. | $50,000 |
| Oct 19, 2021 | Never finaled issued Oct 2022, no final | 625 Central Av | legalize existing ground floor unit 627a per ordinance 43-14. install 1-hour separation between ground floor and upper floors per eg-05. install sprinklers at entire ground floor per fs-05 requirements; under separate permit.Details
legalize existing ground floor unit 627a per ordinance 43-14. install 1-hour separation between ground floor and upper floors per eg-05. install sprinklers at entire ground floor per fs-05 requirements; under separate permit. | $100,000 |
| Jun 25, 2021 | Completed final sign-off Oct 2021 | 745 39th Av | 2/f: convert (e) closet into full bathroom (shower, lav,sink, toilet). bathroom addition in (e) 2001Details
2/f: convert (e) closet into full bathroom (shower, lav,sink, toilet). bathroom addition in (e) 2001 | $21,000 |
| Dec 11, 2020 | Expired or cancelled expired Jun 2025 | 841 Geneva Av | replacing extg wood siding with new stucco on all 4 sides of the house. and apply stucco on the de-attached garage/shed.Details
replacing extg wood siding with new stucco on all 4 sides of the house. and apply stucco on the de-attached garage/shed. | $39,000 |
| Oct 7, 2020 | Never finaled issued Dec 2020, no final | 68 Rosemont Pl | remodel master bathroom and add guest bathroom at 3rd fl, replace 1 rear window if needed.Details
remodel master bathroom and add guest bathroom at 3rd fl, replace 1 rear window if needed. | $30,000 |
| Jun 12, 2020 | Never finaled issued Jun 2020, no final | 425 14th St | unit 1: like to like kitchen remodel. update/upgrade electrical and plumbing to current codes. new floors new cabinets and new appliancesDetails
unit 1: like to like kitchen remodel. update/upgrade electrical and plumbing to current codes. new floors new cabinets and new appliances | $17,000 |
| Mar 5, 2020 | Expired or cancelled withdrawn Jan 2022 | 841 Geneva Av | replace siding on house wood/stucco.Details
replace siding on house wood/stucco. | $30,000 |
| Jan 15, 2020 | Completed final sign-off Mar 2020 | 158 Missouri St | turn 1/2 bath to full bath at 2nd fl unit. relocate toilet and sink, add tub/shower. update elec,plumbing, mech.Details
turn 1/2 bath to full bath at 2nd fl unit. relocate toilet and sink, add tub/shower. update elec,plumbing, mech. | $13,000 |
| Sep 25, 2019 | Completed final sign-off Jun 2021 | 237 Arguello Bl | like for like kitchen remodeling; upgrading electrical panel. changing one window; same size same locationDetails
like for like kitchen remodeling; upgrading electrical panel. changing one window; same size same location | $20,000 |
| Jul 23, 2019 | Completed final sign-off Jan 2024 | 191 Sussex St | 1 adu per ord. #95-17. new adu created @ new lower level.add kitchen,guest room,bathroom&bedroom@new level. add porch in rear@new lower level.interior renovation. garage gets smaller. no excavation. new permeable driveway per pc sec. 132.Details
1 adu per ord. #95-17. new adu created @ new lower level.add kitchen,guest room,bathroom&bedroom@new level. add porch in rear@new lower level.interior renovation. garage gets smaller. no excavation. new permeable driveway per pc sec. 132. | $150,000 |
| Jul 22, 2019 | Completed final sign-off Oct 2019 | 444 Prentiss St | kitchen remodel inkind & elec. upgrade. no removal of walls.Details
kitchen remodel inkind & elec. upgrade. no removal of walls. | $25,000 |
| Jun 6, 2019 | Completed final sign-off Aug 2019 | 237 Arguello Bl | removel kitchen and bring electrical and plumbing up to code. relocating d/w.Details
removel kitchen and bring electrical and plumbing up to code. relocating d/w. | $20,000 |
| May 20, 2019 | Completed final sign-off Jul 2019 | 4339 California St | unit 1: remodel bathroom in-kind, 1/f, 10'x8'Details
unit 1: remodel bathroom in-kind, 1/f, 10'x8' | $17,000 |
| Apr 24, 2019 | Completed final sign-off Sep 2021 | 2063 20th Av | legalize room/electrical create bedroom and office on ground floorDetails
legalize room/electrical create bedroom and office on ground floor | $20,000 |
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 135 Valencia St | unit a-307: bathroom remodel. add shower to half bath. relocate vanity/sink. no walls to be altered or removedDetails
unit a-307: bathroom remodel. add shower to half bath. relocate vanity/sink. no walls to be altered or removed | $15,000 |
| Mar 27, 2019 | Completed final sign-off Aug 2019 | 517 Vermont St | master bathroom remodel. add drain for new shower/ relocate toilet, sink. add (2) can lights. no structural work. no wall modification.Details
master bathroom remodel. add drain for new shower/ relocate toilet, sink. add (2) can lights. no structural work. no wall modification. | $20,000 |
| Dec 4, 2018 | Completed final sign-off Mar 2019 | 1718 24th Av | kitchen and bath remodel change layout, remove wallDetails
kitchen and bath remodel change layout, remove wall | $30,000 |
| Sep 18, 2018 | Completed final sign-off Dec 2018 | 111 Chestnut St | bathroom romdel. replacing fixtures, tile, painting.Details
bathroom romdel. replacing fixtures, tile, painting. | $16,000 |
| Aug 8, 2018 | Completed final sign-off Jan 2019 | 39 Dashiell Hammett St | unit 101: remodel master bathroom, create double vanity from existing single vanity. remove non-load bearing wall to extend the vanity. install "stand alone tub" instead of tub/shower. update existing shower. create a concrete shower pan instead of pre fab shower.Details
unit 101: remodel master bathroom, create double vanity from existing single vanity. remove non-load bearing wall to extend the vanity. install "stand alone tub" instead of tub/shower. update existing shower. create a concrete shower pan instead of pre fab shower. | $19,000 |
| Jun 7, 2018 | Completed final sign-off Jun 2018 | 111 Chestnut St | unit #901: bathroom remodel, like to like. shower pan, tiles, paint.Details
unit #901: bathroom remodel, like to like. shower pan, tiles, paint. | $10,000 |
| May 4, 2018 | Completed final sign-off Jul 2018 | 39 Dashiell Hammett St | full bathroom remodel, add a pocket door, add and replace recessed light, frame a small closet, remove small non-load bearing wall, move light and fan switchesDetails
full bathroom remodel, add a pocket door, add and replace recessed light, frame a small closet, remove small non-load bearing wall, move light and fan switches | $13,000 |
| Apr 3, 2018 | Completed final sign-off Jul 2018 | 935 Filbert St | two bathrooms remodel, both tubs, like to like. no work on the vanities in both bathrooms. replacing fans, existing vanities' outlets to gfcis, both tubs fixtures and adding two recessed lights in the master bathroomDetails
two bathrooms remodel, both tubs, like to like. no work on the vanities in both bathrooms. replacing fans, existing vanities' outlets to gfcis, both tubs fixtures and adding two recessed lights in the master bathroom | $20,000 |
| Mar 22, 2018 | Completed final sign-off Jun 2018 | 161 Chilton Av | like to like bahtroom remodel chnage vanity tile, shower fixtures, 9x5Details
like to like bahtroom remodel chnage vanity tile, shower fixtures, 9x5 | $12,000 |
| Mar 22, 2018 | Completed final sign-off Jul 2018 | 4339 California St | like to like remodel change shower fixtures change tile 10'x 8Details
like to like remodel change shower fixtures change tile 10'x 8 | $12,000 |
| Apr 5, 2016 | Completed final sign-off Jun 2018 | 919 Fulton St | convert walk in closet into full bath including low flow shower toilet and vanity. tie in potable water to (e) water supplies waste tie in at (e) stack. new electrical for gfci and lighting. finsihes include tile, paint, glass. replace (e) dbl hung window with new vinyl dual glaze. not visible fromDetails
convert walk in closet into full bath including low flow shower toilet and vanity. tie in potable water to (e) water supplies waste tie in at (e) stack. new electrical for gfci and lighting. finsihes include tile, paint, glass. replace (e) dbl hung window with new vinyl dual glaze. not visible from | $10,000 |