Greene Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Aug 2018
- Last 24 months
- 0 permits filed
40 permits since 2000: 36 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 24, 2018 | Never finaled issued Aug 2018, no final | 44 Montgomery St | suite 4210: permit revision to pa #201806151973, includes double glass swing doors to conference room in lieu of bi-fold doors.Details
suite 4210: permit revision to pa #201806151973, includes double glass swing doors to conference room in lieu of bi-fold doors. | |
| Jun 15, 2018 | Never finaled issued Jul 2018, no final | 44 Montgomery St | arch ti suite 4210, approx 2100 sq ft selective demo of existing partitions and associated power/data floor finishes and lighting. new apartitons, doors, power, tele data, lighting, finish patching, mep, life safety, sprinkler modifications sep permitDetails
arch ti suite 4210, approx 2100 sq ft selective demo of existing partitions and associated power/data floor finishes and lighting. new apartitons, doors, power, tele data, lighting, finish patching, mep, life safety, sprinkler modifications sep permit | $260,760 |
| May 25, 2018 | Completed final sign-off Jun 2018 | 44 Montgomery St | 34th floor: revision to app#201804247201. new scope includes addition of partial height wall at open office. electrical under deferred submittal.Details
34th floor: revision to app#201804247201. new scope includes addition of partial height wall at open office. electrical under deferred submittal. | |
| May 22, 2018 | Completed final sign-off Dec 2018 | 44 Montgomery St | 37th fl ti includes demo on struct partitions and build new non str partitions. all n or revised meps, life safety or sprinklers will be design build and submitted separately. bldg fully sprinklered maher not reqDetails
37th fl ti includes demo on struct partitions and build new non str partitions. all n or revised meps, life safety or sprinklers will be design build and submitted separately. bldg fully sprinklered maher not req | $850,000 |
| May 14, 2018 | Completed final sign-off Jun 2018 | 44 Montgomery St | 37th fl suite 3700, ti includes demo of non structural paritions, (e) ceiling and fire sprinklers to remain. ab 017. n/a for maher.Details
37th fl suite 3700, ti includes demo of non structural paritions, (e) ceiling and fire sprinklers to remain. ab 017. n/a for maher. | $45,000 |
| Apr 24, 2018 | Completed final sign-off Jun 2018 | 44 Montgomery St | 34th floor: selective demolition of extg partitions and associated power/data, floor finishes & lighting. construction of nw partitions, doors, power & tele/data, relocation of lighting & new finish patching. mep, life safety, & sprinkler system modifications are under seperate permits. n/a maherDetails
34th floor: selective demolition of extg partitions and associated power/data, floor finishes & lighting. construction of nw partitions, doors, power & tele/data, relocation of lighting & new finish patching. mep, life safety, & sprinkler system modifications are under seperate permits. n/a maher | $85,000 |
| Feb 16, 2018 | Completed final sign-off Jun 2018 | 44 Montgomery St | suite 1110 & 1150: existing single tenant suite demo of (e) partitions & power/data, floor finishes & lighting. construction of two tenant suites including (n) partitions, doors, power & tele/data, lighting, millwork & finishes. mep/life safety & sprinkler system modifications under sep. permit.Details
suite 1110 & 1150: existing single tenant suite demo of (e) partitions & power/data, floor finishes & lighting. construction of two tenant suites including (n) partitions, doors, power & tele/data, lighting, millwork & finishes. mep/life safety & sprinkler system modifications under sep. permit. | $391,132 |
| Jan 18, 2018 | Never finaled issued Feb 2018, no final | 44 Montgomery St | #600 - demo of (e) partitions & finishes. construction of new millwork, walls and glazing. suite currently vacant. mep/fire/life safety under sep permit maher naDetails
#600 - demo of (e) partitions & finishes. construction of new millwork, walls and glazing. suite currently vacant. mep/fire/life safety under sep permit maher na | $80,000 |
| Feb 7, 2017 | Completed final sign-off Apr 2017 | 44 Montgomery St | 13th floor mech & electrical for 2016-1215-5066 suite 1310. partial floor. no new fsd; n/a maherDetails
13th floor mech & electrical for 2016-1215-5066 suite 1310. partial floor. no new fsd; n/a maher | $1,000 |
| Dec 16, 2016 | Completed final sign-off Jun 2017 | 44 Montgomery St | ti includes demo new non structural partitons. mep include life safety under separate permit.Details
ti includes demo new non structural partitons. mep include life safety under separate permit. | $115,000 |
| Dec 16, 2016 | Completed final sign-off Jan 2019 | 44 Montgomery St | 11th fl a/mep partial ti (1500 sq ft) includes demo of millwork, new non structural partitions to create offices. fire alarms and sprinklers under sep permit maher not reqDetails
11th fl a/mep partial ti (1500 sq ft) includes demo of millwork, new non structural partitions to create offices. fire alarms and sprinklers under sep permit maher not req | $145,000 |
| Dec 15, 2016 | Completed final sign-off Apr 2017 | 44 Montgomery St | 13th flr: ti demo of non structural partitiona & build new non-structural partitiona, maher na. life safety deferred. mep deferred.Details
13th flr: ti demo of non structural partitiona & build new non-structural partitiona, maher na. life safety deferred. mep deferred. | $128,073 |
| Dec 2, 2016 | Completed final sign-off Feb 2017 | 44 Montgomery St | 6th flr, ste 650: t.i. include the demo of non-structural partitions,building(n) non structural partitions.all new or revised, mep included,l/s & sprinklers will be design built & submitted separately (bldg fully sprinklered);maher n/aDetails
6th flr, ste 650: t.i. include the demo of non-structural partitions,building(n) non structural partitions.all new or revised, mep included,l/s & sprinklers will be design built & submitted separately (bldg fully sprinklered);maher n/a | $179,834 |
| Mar 29, 2016 | Completed final sign-off Jun 2016 | 44 Montgomery St | 38th fl ti includes demo of non structural partitons and building new non structural partitions. mech/elec, life safety and sprinklers under sep permit maher not reqDetails
38th fl ti includes demo of non structural partitons and building new non structural partitions. mech/elec, life safety and sprinklers under sep permit maher not req | $91,436 |
| May 8, 2015 | Completed final sign-off Aug 2015 | 44 Montgomery St | 19th flr - unit 1950: soft demo of one office/room & remove electrical feed for workstations. maher na. vacant office space use ab-17.Details
19th flr - unit 1950: soft demo of one office/room & remove electrical feed for workstations. maher na. vacant office space use ab-17. | $15,000 |
| May 1, 2015 | Completed final sign-off Oct 2015 | 44 Montgomery St | mechanical & electrical for pa#201504274676. n/a ordinance #155-13Details
mechanical & electrical for pa#201504274676. n/a ordinance #155-13 | |
| Apr 27, 2015 | Completed final sign-off Oct 2015 | 44 Montgomery St | 32nd fl ti includes the demo of non structural partitions and building new non strctural partitions. all new or revised. hvac ele, plumb, ls will be engineered. mep under separate permit ;maher not reqDetails
32nd fl ti includes the demo of non structural partitions and building new non strctural partitions. all new or revised. hvac ele, plumb, ls will be engineered. mep under separate permit ;maher not req | $800,000 |
| Mar 20, 2015 | Completed final sign-off Nov 2015 | 44 Montgomery St | t.i. includes demo of non-structural partitions and build new non structural partitions. all new or revised hvac, electrical, plumbing and fire alarm. work will be design build and submitted seperately. bldg is fully sprinklered. n/a ordinance #155-13Details
t.i. includes demo of non-structural partitions and build new non structural partitions. all new or revised hvac, electrical, plumbing and fire alarm. work will be design build and submitted seperately. bldg is fully sprinklered. n/a ordinance #155-13 | $155,500 |
| Feb 18, 2015 | Completed final sign-off Apr 2015 | 44 Montgomery St | (2nd flr) - t.i includes demo of non-structural partitions & building new non structural partitions. all new or revised. hvac, ele, plm work is engineered and included within this permit. sprinklers, life safety if needed will be under separate permit. bld is fully sprinklered currently.Details
(2nd flr) - t.i includes demo of non-structural partitions & building new non structural partitions. all new or revised. hvac, ele, plm work is engineered and included within this permit. sprinklers, life safety if needed will be under separate permit. bld is fully sprinklered currently. | $275,000 |
| Jan 15, 2015 | Never finaled issued Feb 2015, no final | 44 Montgomery St | demo & non structural partitions and staircase between floors 31 & 32. floor infill with structural slab on 32nd floor, demo per ab-017, no disabled access needed, floor unoccupied. n/a ordinance #155-13Details
demo & non structural partitions and staircase between floors 31 & 32. floor infill with structural slab on 32nd floor, demo per ab-017, no disabled access needed, floor unoccupied. n/a ordinance #155-13 | $50,000 |
| Sep 9, 2014 | Completed final sign-off Dec 2014 | 44 Montgomery St | 7th flr: tenant improvement includes the demo of non-structural partitions & building back new non-struct. partitions. all new or revised hvac electrical & plumbing included. l/s work under separate permit (bldg fully sprinklered); maher n/aDetails
7th flr: tenant improvement includes the demo of non-structural partitions & building back new non-struct. partitions. all new or revised hvac electrical & plumbing included. l/s work under separate permit (bldg fully sprinklered); maher n/a | $174,770 |
| Sep 3, 2014 | Completed final sign-off Dec 2014 | 44 Montgomery St | 10th flr: t.i. includes the demo of non structural partitions & building new non-struc partitions. all new or revised hvac, elec & plumbing (life safety under sep permit if needed) bldg fully sprinklered; maher n/aDetails
10th flr: t.i. includes the demo of non structural partitions & building new non-struc partitions. all new or revised hvac, elec & plumbing (life safety under sep permit if needed) bldg fully sprinklered; maher n/a | $125,000 |
| Jul 9, 2014 | Completed final sign-off Jan 2015 | 44 Montgomery St | #2410- t.i. include demo of non-structural partitions and building new non structural partitios. all new or revised hvac, electrical, plumbing and life safety work will be design build and submitted seperately. bldg. is fully sprinklered. n/a ordinance #155-13.Details
#2410- t.i. include demo of non-structural partitions and building new non structural partitios. all new or revised hvac, electrical, plumbing and life safety work will be design build and submitted seperately. bldg. is fully sprinklered. n/a ordinance #155-13. | $19,000 |
| Jun 27, 2014 | Completed final sign-off Aug 2014 | 111 Sutter St | suite #350: add new demising partition to divide office into 2 suites. add new door to hall from suite 2. mep work to be submitted seperately. n/a for the maher ordinance #155-13Details
suite #350: add new demising partition to divide office into 2 suites. add new door to hall from suite 2. mep work to be submitted seperately. n/a for the maher ordinance #155-13 | $16,800 |
| Jun 6, 2014 | Completed final sign-off Aug 2014 | 44 Montgomery St | 20th flr, ste 2040: tenant improvement includes the demo of non-structural partitions and build new non-structural partitions, all new or revised, hvac, elec, plumbing and life safety work will be designed build & submmitted separately (bldg is fully sprinklered); maher not requiredDetails
20th flr, ste 2040: tenant improvement includes the demo of non-structural partitions and build new non-structural partitions, all new or revised, hvac, elec, plumbing and life safety work will be designed build & submmitted separately (bldg is fully sprinklered); maher not required | $57,000 |
| May 22, 2014 | Completed final sign-off Aug 2014 | 44 Montgomery St | 9th floor t.i. includes the demo of non-structural partitions & building of new non-structural partitions. all new or revised. hvac, electrical, plumbing, & life safety work will be design build & submitted separately. (bldg fully sprinklered)Details
9th floor t.i. includes the demo of non-structural partitions & building of new non-structural partitions. all new or revised. hvac, electrical, plumbing, & life safety work will be design build & submitted separately. (bldg fully sprinklered) | $198,000 |
| Oct 7, 2013 | Completed final sign-off Nov 2013 | 44 Montgomery St | as part of arch'l permit appl #2013-0501-5907, modify (e) air distribution for (n) wall configuration. add 3 exhaust fans, add one 2-tons split a/c unit at room 4130, add one motorized fire damper at room 4130 for make-up air.Details
as part of arch'l permit appl #2013-0501-5907, modify (e) air distribution for (n) wall configuration. add 3 exhaust fans, add one 2-tons split a/c unit at room 4130, add one motorized fire damper at room 4130 for make-up air. | |
| Jul 22, 2013 | Completed final sign-off Nov 2013 | 44 Montgomery St | modification of ground floor hallway. includes demo and construction of new light fixtures, suspended ceiling and new finishesDetails
modification of ground floor hallway. includes demo and construction of new light fixtures, suspended ceiling and new finishes | $40,000 |
| Jun 25, 2013 | Completed final sign-off Aug 2014 | 44 Montgomery St | suite 4150:t.i. includes the demolition of non structural partition and bldg. new non structural partitions. all new or revised hvac, electrical plmg and life safety work will be design build and submitted for permit seperately. bldg is fully sprinklered. remodel bathroom.Details
suite 4150:t.i. includes the demolition of non structural partition and bldg. new non structural partitions. all new or revised hvac, electrical plmg and life safety work will be design build and submitted for permit seperately. bldg is fully sprinklered. remodel bathroom. | $120,000 |
| May 1, 2013 | Completed final sign-off Nov 2013 | 44 Montgomery St | suite # 4100/ 41st floor. t.i. include the demolition of non structural partitions and building new non stuctural partitions. all new or revised hvac, electrical, plbg and life safety work will be design build and submitted for permit seperately. bldg is fully sprinkleredDetails
suite # 4100/ 41st floor. t.i. include the demolition of non structural partitions and building new non stuctural partitions. all new or revised hvac, electrical, plbg and life safety work will be design build and submitted for permit seperately. bldg is fully sprinklered | $196,000 |
| Oct 11, 2012 | Completed final sign-off Nov 2012 | 33 New Montgomery St | non-structrual demo of walls as shown, flooring & partial ceiling, minor new drywall, one new door assembly, patch ceiling. elec & life safety & minor re-work of hvac ducts, paint & carpet.Details
non-structrual demo of walls as shown, flooring & partial ceiling, minor new drywall, one new door assembly, patch ceiling. elec & life safety & minor re-work of hvac ducts, paint & carpet. | $45,000 |
| Jun 15, 2012 | Completed final sign-off Jul 2012 | 44 Montgomery St | 15th fl. ti: demolish non structural partitoins, build back new non structural partitions. new or revised hvac, elec, plumbing and life safety will be design build and submitted separately. building is fully sprinklered.Details
15th fl. ti: demolish non structural partitoins, build back new non structural partitions. new or revised hvac, elec, plumbing and life safety will be design build and submitted separately. building is fully sprinklered. | $69,000 |
| Jun 15, 2012 | Completed final sign-off Sep 2012 | 44 Montgomery St | 8th fl, suite 800 ti: demolish non structural partitions, new non structural partiions. all new or revised hvac, elec, plumbing and life safety work design build on separate permit. building fully sprinkleredDetails
8th fl, suite 800 ti: demolish non structural partitions, new non structural partiions. all new or revised hvac, elec, plumbing and life safety work design build on separate permit. building fully sprinklered | $55,000 |
| Aug 31, 2011 | Completed final sign-off Nov 2011 | 44 Montgomery St | 20th fl: ti includes demolition of non structural partitions and building new non structural partitions. all new or revised hvac, elec, plumbing, life safety work will be design-build and submitted separately. building not fully sprinklered. structural plans will be submitted separatelyDetails
20th fl: ti includes demolition of non structural partitions and building new non structural partitions. all new or revised hvac, elec, plumbing, life safety work will be design-build and submitted separately. building not fully sprinklered. structural plans will be submitted separately | $130,000 |
| Jul 23, 2010 | Completed final sign-off Sep 2010 | 44 Montgomery St | office ti on the 8th floor suite 820 including demo of non struc partitions. building non struc partitions. all new or revise hvac elec, plbg and ls work will be under separate permit, design build. bldg is fully sprinkleredDetails
office ti on the 8th floor suite 820 including demo of non struc partitions. building non struc partitions. all new or revise hvac elec, plbg and ls work will be under separate permit, design build. bldg is fully sprinklered | $23,000 |
| Jul 23, 2010 | Completed final sign-off Sep 2010 | 44 Montgomery St | office ti on the 8th floor- suite# 850 includes demo. of non structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plbg and ls will be design build and submitted under separate permit. bldg is fully sprinkleredDetails
office ti on the 8th floor- suite# 850 includes demo. of non structural partitions and building new non-structural partitions. all new or revised hvac, electrical, plbg and ls will be design build and submitted under separate permit. bldg is fully sprinklered | $95,000 |
| May 17, 2010 | Completed final sign-off Jul 2010 | 44 Montgomery St | suit 2400, 24th. flr.) t.i. includes demolition of non-structural partitions & building (n) non-structural partitions. all (n) or revised hvac. electrical, plumbing & life safety work will be design build & submitted for permit separately, fully sprinklered.Details
suit 2400, 24th. flr.) t.i. includes demolition of non-structural partitions & building (n) non-structural partitions. all (n) or revised hvac. electrical, plumbing & life safety work will be design build & submitted for permit separately, fully sprinklered. | $98,000 |
| Sep 15, 2009 | Completed final sign-off Jan 2010 | 44 Montgomery St | modifications to existing tenant improvements on 24th floor, soft demo, drywall partitions, paint, carpet, doors and millwork. mep and life saftey inder separate permit. no fire sprinkler work required. ref. pa# 2004.04.26.2244 to show path of travel through hallDetails
modifications to existing tenant improvements on 24th floor, soft demo, drywall partitions, paint, carpet, doors and millwork. mep and life saftey inder separate permit. no fire sprinkler work required. ref. pa# 2004.04.26.2244 to show path of travel through hall | $50,000 |
| Aug 11, 2009 | Completed final sign-off Sep 2009 | 44 Montgomery St | office ti on 24th floor. sodt int. demo of 3 rms and finishes. construct new offices, drs,sidelights, carpet, paint and one new sink. mep, fire alarm and fire sprinklers under separate permit.Details
office ti on 24th floor. sodt int. demo of 3 rms and finishes. construct new offices, drs,sidelights, carpet, paint and one new sink. mep, fire alarm and fire sprinklers under separate permit. | $62,960 |
| Mar 16, 2009 | Completed final sign-off Jul 2009 | 44 Montgomery St | modifications to (e) t.i. at suite 770. minor wall removal, 2 new drywall partitions, relcoation of suite entry doors, mechanical, electrical & life safety modifications under separate permit.Details
modifications to (e) t.i. at suite 770. minor wall removal, 2 new drywall partitions, relcoation of suite entry doors, mechanical, electrical & life safety modifications under separate permit. | $35,000 |