Green Metro Inc
- Based in
- Burlingame
- On San Francisco permits
- Dec 2005 to Dec 2023
- Last 24 months
- 0 permits filed
55 permits since 2000: 49 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2023 | Completed final sign-off Oct 2024 | 1830 20th Av | at 1st fl, (n) bedrooms, (n) bathroom and wet bar. at 2nd fl, remodel (e) bathroom into 2 (n) bathrooms. no exterior work.Details
at 1st fl, (n) bedrooms, (n) bathroom and wet bar. at 2nd fl, remodel (e) bathroom into 2 (n) bathrooms. no exterior work. | $138,600 |
| Aug 30, 2021 | Completed final sign-off Jan 2022 | 61 Junior Tr | rev to pa202104148553: (e) rear windows locations to remain. adjust shear wall location and length. remove rear porch roof.Details
rev to pa202104148553: (e) rear windows locations to remain. adjust shear wall location and length. remove rear porch roof. | $100 |
| Apr 14, 2021 | Completed final sign-off Jan 2022 | 61 Junior Tr | 1st fl: remodel (e) space to 2 new bedrooms, new media room, new full bathroom and new home office.Details
1st fl: remodel (e) space to 2 new bedrooms, new media room, new full bathroom and new home office. | $80,000 |
| Jan 6, 2021 | Completed final sign-off Feb 2021 | 1677 Dolores St | repair front stair & railing. less than 50%.Details
repair front stair & railing. less than 50%. | $10,000 |
| Aug 22, 2020 | Completed final sign-off Mar 2021 | 1529 Dolores St | revision to pa #2019-0924-2506: grd floor - relocate laundry units. add water heater for radiant heating system. new 8' fence at rear yard. 2nd flr: rearrange powder room layout. 3rd floor: rearrange master bedroom layout.Details
revision to pa #2019-0924-2506: grd floor - relocate laundry units. add water heater for radiant heating system. new 8' fence at rear yard. 2nd flr: rearrange powder room layout. 3rd floor: rearrange master bedroom layout. | $20,000 |
| Sep 24, 2019 | Completed final sign-off Sep 2023 | 1529 Dolores St | revision to app#201712015277 ground floor 1)relocate interior staircase 2)swap family and bedroom location. 3)relocate 3 fixtures bathroom. 2nd floor: 4)swap dining and kitchen location. 3rd floor: 5) reconfigure interior layout per plan.Details
revision to app#201712015277 ground floor 1)relocate interior staircase 2)swap family and bedroom location. 3)relocate 3 fixtures bathroom. 2nd floor: 4)swap dining and kitchen location. 3rd floor: 5) reconfigure interior layout per plan. | $30,000 |
| Jun 18, 2018 | Completed final sign-off Aug 2018 | 1135 18th St | replace & repair (e) door motor. repair faucet for sink. repair some dry rot under (e) door.Details
replace & repair (e) door motor. repair faucet for sink. repair some dry rot under (e) door. | $3,000 |
| Jan 31, 2018 | Completed final sign-off May 2018 | 1995 Turk St | demo non load bearing wall btw kitchen/dining. modifu load bearing wall at kitchen, new kitchen cabinets. elec outlets for kit., living rm, bedrooms. (sep ele permit) close (e) dooreway to turn (e) living tn to bedroom 2. close (e) doorway btw bath & closet- bldg has no fire alarms orDetails
demo non load bearing wall btw kitchen/dining. modifu load bearing wall at kitchen, new kitchen cabinets. elec outlets for kit., living rm, bedrooms. (sep ele permit) close (e) dooreway to turn (e) living tn to bedroom 2. close (e) doorway btw bath & closet- bldg has no fire alarms or | $50,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2021 | 1529 Dolores St | add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor.Details
add 1 family room, bedroom, mudroom, bathroom, laundry at ground floor.remove(e) deck add (n) deck and patio at rear. new interior stair from ground to 2nd floor. remodel kitchen & powder at 2nd floor. add 1 master bathroom, remodel (e) bathroom at 3rd floor. | $250,000 |
| Feb 9, 2015 | Completed final sign-off Jun 2015 | 559 Mangels Av | remodel upstairs bathroom including replace new bathtub, shower door, vanity, toilet lights, remove existing small closet next to door, install 3 recessed light above bathtub and toilet, install 1 vanity light above new vanity, install tile on bathtub wall.Details
remodel upstairs bathroom including replace new bathtub, shower door, vanity, toilet lights, remove existing small closet next to door, install 3 recessed light above bathtub and toilet, install 1 vanity light above new vanity, install tile on bathtub wall. | $8,000 |
| Aug 27, 2014 | Completed final sign-off Nov 2014 | 110 Santa Clara Av | revision to structural and calcs for basement plan and 1st floor framing plan. revise a connection for beam detail. rererence: pa# 2013-1230-5175 & pa# 2014-0723-2006.Details
revision to structural and calcs for basement plan and 1st floor framing plan. revise a connection for beam detail. rererence: pa# 2013-1230-5175 & pa# 2014-0723-2006. | |
| Aug 6, 2014 | Completed final sign-off Dec 2015 | 110 Santa Clara Av | repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacementDetails
repair the rear stair and upper bedroom balcony. in includes wood dryrot and tile and railing - less than 50% replacement | $1,000 |
| Jul 23, 2014 | Completed final sign-off Apr 2016 | 110 Santa Clara Av | revision to pa #2013/1230/5275. reconfigure entertainment room, half bathroom and laundry room at basement level. reconfigure existing bathrooms and master bathroom at first and second level.Details
revision to pa #2013/1230/5275. reconfigure entertainment room, half bathroom and laundry room at basement level. reconfigure existing bathrooms and master bathroom at first and second level. | |
| Jun 24, 2014 | Completed final sign-off Aug 2014 | 158 Beverly St | full remodel kitchen, install lighting/without changing wall and fixture locations. dryrot replace the window casing, exterior siding; repair the dryrot around sliding door in light well, not street visible. repair rear wall in kind.Details
full remodel kitchen, install lighting/without changing wall and fixture locations. dryrot replace the window casing, exterior siding; repair the dryrot around sliding door in light well, not street visible. repair rear wall in kind. | $14,240 |
| May 20, 2014 | Completed final sign-off Sep 2014 | 559 Mangels Av | revision to app#201312305213. bedroom change to studio office. add a new 4'x4' window in the studio office. add 2 new 3'x4' window in the studio office. no door for the media room.Details
revision to app#201312305213. bedroom change to studio office. add a new 4'x4' window in the studio office. add 2 new 3'x4' window in the studio office. no door for the media room. | $5,000 |
| May 20, 2014 | Completed final sign-off Jun 2014 | 2245 Beach St | unit #6:hall bath: replace tub faucet, tub tile, reinstall pedestal and toilet, replace vanity light. no change to tub and walls. master bath:replace pedestal at same location. new vanity light. no change to shower.Details
unit #6:hall bath: replace tub faucet, tub tile, reinstall pedestal and toilet, replace vanity light. no change to tub and walls. master bath:replace pedestal at same location. new vanity light. no change to shower. | $15,000 |
| Mar 24, 2014 | Completed final sign-off Sep 2014 | 559 Mangels Av | revision to app#201312305213 for foundation underpiningDetails
revision to app#201312305213 for foundation underpining | $3,000 |
| Dec 30, 2013 | Completed final sign-off Sep 2014 | 559 Mangels Av | convert 535 sq ft into habitable space with a full bathroom on ground foor. relocate laundry, water heater and furnace on ground floor.Details
convert 535 sq ft into habitable space with a full bathroom on ground foor. relocate laundry, water heater and furnace on ground floor. | $55,000 |
| Dec 30, 2013 | Completed final sign-off Apr 2016 | 110 Santa Clara Av | 1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows.Details
1)add a entertainment area, a half bathroom with laundry area and wet bar at basement level. 2)remodel extg bathrooms and kitchen area at 1st , 2nd level. 3) replace all the windows in kind with wood frame material windows. | $70,000 |
| May 21, 2013 | Completed final sign-off Jun 2013 | 1520 Florida St | to repair dry-rot under sub-floor in the basement (around rear door) plumbing work (to repair the broken sewer pipe above ground at the left front corner around rear room)Details
to repair dry-rot under sub-floor in the basement (around rear door) plumbing work (to repair the broken sewer pipe above ground at the left front corner around rear room) | $700 |
| May 7, 2013 | Completed final sign-off Aug 2013 | 42 Tucker Av | repair/replace existing rear cmu retaining wall. (details in structural design)Details
repair/replace existing rear cmu retaining wall. (details in structural design) | $6,500 |
| Jan 3, 2013 | Completed final sign-off Feb 2013 | 2245 Beach St | kitchen-full remodel, no wall hanges (replace in-kind, same location), half bath - replace wall tile, vanity, toilet, faucets, vanity lights and exhaust fan, aster bath: replace vanity light & exhaust fan, dry rot repair, repair dry rot in iving room windows 9around windows)Details
kitchen-full remodel, no wall hanges (replace in-kind, same location), half bath - replace wall tile, vanity, toilet, faucets, vanity lights and exhaust fan, aster bath: replace vanity light & exhaust fan, dry rot repair, repair dry rot in iving room windows 9around windows) | $18,000 |
| Aug 29, 2012 | Completed final sign-off Oct 2012 | 2225 15th St | partial kitchen remodel, full bath remodel at lower level. install kitchen lights. no change in partitionsDetails
partial kitchen remodel, full bath remodel at lower level. install kitchen lights. no change in partitions | $25,000 |
| May 22, 2012 | Completed final sign-off May 2012 | 33 Sadowa St | to add and revise a scope of work for permit # 201202154186. to replace central furnace in garage. to relocate water heater from right garage to the middle garage. (right of utility sink). provide seismic straps. raise equipments in garage - 18".Details
to add and revise a scope of work for permit # 201202154186. to replace central furnace in garage. to relocate water heater from right garage to the middle garage. (right of utility sink). provide seismic straps. raise equipments in garage - 18". | $3,000 |
| Feb 15, 2012 | Completed final sign-off May 2012 | 33 Sadowa St | full kitchen remodel, partial bath update, update outlets and lights, no wall change, laundry plumbing @ ground level garage, lighting to comply with cec150(k)Details
full kitchen remodel, partial bath update, update outlets and lights, no wall change, laundry plumbing @ ground level garage, lighting to comply with cec150(k) | $40,000 |
| Jan 30, 2012 | Completed final sign-off Mar 2012 | 2245 Beach St | unit #2: full kitchen remodel, partial bath update, update outlets and lights, new laundry plumbing;no wall changeDetails
unit #2: full kitchen remodel, partial bath update, update outlets and lights, new laundry plumbing;no wall change | $35,000 |
| Dec 23, 2011 | Completed final sign-off Feb 2012 | 615 Burnett Av | remove illegal kitchen at first floor to comply w/ nov#201152128.Details
remove illegal kitchen at first floor to comply w/ nov#201152128. | $12,000 |
| Dec 20, 2011 | Completed final sign-off Jan 2012 | 1118 Naples St | repair deck & stair in the rear, less than 50% in-kind. repair section of the rotted posts and repair some threads and risers. replace existing railing with same style at 4" o.c.Details
repair deck & stair in the rear, less than 50% in-kind. repair section of the rotted posts and repair some threads and risers. replace existing railing with same style at 4" o.c. | $3,000 |
| Dec 1, 2011 | Completed final sign-off Dec 2011 | 465 Panorama Dr | master bathroom full remodel, no walls change, replace two outlets in bedroom, one ceiling mounted light at bedroom, lighting to comply cec 150(k), replace window in kind at window . max. u factor .40Details
master bathroom full remodel, no walls change, replace two outlets in bedroom, one ceiling mounted light at bedroom, lighting to comply cec 150(k), replace window in kind at window . max. u factor .40 | $15,000 |
| Oct 17, 2011 | Completed final sign-off Nov 2011 | 1466 08th Av | bath: replacing tile floor, vanity top, one faucet & one toilet. remove (e) carpet w/ (n) laminant floor. install 2 (n) track lights. remove popcorn ceiling.Details
bath: replacing tile floor, vanity top, one faucet & one toilet. remove (e) carpet w/ (n) laminant floor. install 2 (n) track lights. remove popcorn ceiling. | $8,000 |
| Feb 8, 2011 | Completed final sign-off May 2011 | 57 Parker Av | kitchen remodel, replace appliances, range, microwave, hood, sink, sink faucet, garage disposal, dishwasher, replace 9 lights, replace cabinets, tiling floorDetails
kitchen remodel, replace appliances, range, microwave, hood, sink, sink faucet, garage disposal, dishwasher, replace 9 lights, replace cabinets, tiling floor | $5,000 |
| Jan 18, 2011 | Completed final sign-off Jun 2011 | 866 48th Av | remodeling of sfd; install (n) gas fireplace, remodel (e) kitchen & bath on 2nd. flr. add a (n) bedroom on 1st. flr. legalize & remodel (e) bath on 1st. flr. replace (e) furnace & w/h on 1st.flr. remove (e) plastic cover @ lightwell.Details
remodeling of sfd; install (n) gas fireplace, remodel (e) kitchen & bath on 2nd. flr. add a (n) bedroom on 1st. flr. legalize & remodel (e) bath on 1st. flr. replace (e) furnace & w/h on 1st.flr. remove (e) plastic cover @ lightwell. | $30,000 |
| Jan 7, 2011 | Completed final sign-off Feb 2011 | 20 Dorado Tr | kitchen remodel: replacing countertom and appliances only. no new cabinets. bathroom remodel: new faucet, sink, toulet, wall and floor tiling only. non structural remodel.Details
kitchen remodel: replacing countertom and appliances only. no new cabinets. bathroom remodel: new faucet, sink, toulet, wall and floor tiling only. non structural remodel. | $12,500 |
| Sep 17, 2010 | Completed final sign-off Nov 2010 | 2245 Beach St | #3 - remodel (e) kitchen, replace five ceiling light in bedroom, replace 2-pedestal in existing, 2-bath.Details
#3 - remodel (e) kitchen, replace five ceiling light in bedroom, replace 2-pedestal in existing, 2-bath. | $20,000 |
| Apr 20, 2010 | Never finaled issued Apr 2010, no final | 2731 Kirkham St | revision to application 2010-0208-6087. rearange of 2nd floor bathrooms.Details
revision to application 2010-0208-6087. rearange of 2nd floor bathrooms. | |
| Dec 15, 2009 | Completed final sign-off Aug 2010 | 2728 Kirkham St | ground floor: add 3 bedrooms, 2 full baths, add 2 windows side property line. 2nd fl, remodel kitchen, bath, add full bath.Details
ground floor: add 3 bedrooms, 2 full baths, add 2 windows side property line. 2nd fl, remodel kitchen, bath, add full bath. | $50,000 |
| May 27, 2009 | Completed final sign-off Oct 2009 | 1459 45th Av | replace rear stairs and landing in kind, modify railing spacing to comply with codeDetails
replace rear stairs and landing in kind, modify railing spacing to comply with code | $10,500 |
| Feb 27, 2009 | Completed final sign-off Apr 2009 | 3835 Scott St | remodel 1 bathrm.Details
remodel 1 bathrm. | $13,570 |
| Jul 16, 2008 | Completed final sign-off Sep 2008 | 172 Ellington Av | revision to pa #200805081602, add new storage @1st fl.Details
revision to pa #200805081602, add new storage @1st fl. | $3,000 |
| Apr 28, 2008 | Expired or cancelled expired Jul 2017 | 351 29th Av | replace two sections (rear & side( siding. replace some rotted stud behind siding approx 350 all in kind work, no work @ front of building.Details
replace two sections (rear & side( siding. replace some rotted stud behind siding approx 350 all in kind work, no work @ front of building. | $5,500 |
| Mar 27, 2008 | Expired or cancelled expired Aug 2017 | 351 29th Av | remodel (e) kitchen & baths. 50% of kitchen watt be of high efficiancy, fluorescent light or o.s. in bath. kitchen: new cabinets, countertops, sink appliances, repair floor or replace with tile. no structural. bath: replace vanity, sink, toilet, repair floor or replace with tile. repair or replaceDetails
remodel (e) kitchen & baths. 50% of kitchen watt be of high efficiancy, fluorescent light or o.s. in bath. kitchen: new cabinets, countertops, sink appliances, repair floor or replace with tile. no structural. bath: replace vanity, sink, toilet, repair floor or replace with tile. repair or replace | $40,000 |
| Feb 19, 2008 | Completed final sign-off Sep 2009 | 136 Randall St | renew app #200609273547. bathroom remodel. for placement of smoke alarmsDetails
renew app #200609273547. bathroom remodel. for placement of smoke alarms | |
| Jan 18, 2008 | Completed final sign-off Feb 2008 | 4238 23rd St | repair stairs that has beetle damages. inside stairs going from living area to ground flr. less than 50%.Details
repair stairs that has beetle damages. inside stairs going from living area to ground flr. less than 50%. | $3,000 |
| Nov 14, 2007 | Expired or cancelled cancelled Jan 2010 | 150 Highland Av | 1 kitchen remodel. replace cabinet. no sink. new appliances, sink in seperate room. not part of scope of work.Details
1 kitchen remodel. replace cabinet. no sink. new appliances, sink in seperate room. not part of scope of work. | $3,000 |
| Sep 21, 2007 | Completed final sign-off Nov 2007 | 150 Highland Av | remove illegal kitchen, legalize full bath & storage on ground floor. convert living room to bedroom on second floor per plan.Details
remove illegal kitchen, legalize full bath & storage on ground floor. convert living room to bedroom on second floor per plan. | $9,000 |
| Aug 15, 2007 | Completed final sign-off Nov 2013 | 793 Arguello Bl | major remodel ofmapt#2. kitchen, bathroom, furnace, water heater, sub-panel, window replacement.Details
major remodel ofmapt#2. kitchen, bathroom, furnace, water heater, sub-panel, window replacement. | $120,000 |
| May 22, 2007 | Completed final sign-off Jun 2007 | 2562 19th Av | extend/renew (e) pa# 200607217321 for final inspectionDetails
extend/renew (e) pa# 200607217321 for final inspection | |
| Apr 9, 2007 | Completed final sign-off Apr 2007 | 364 Winding Wy | revision per permit #200601022644 change layout of bathroomsDetails
revision per permit #200601022644 change layout of bathrooms | $500 |
| Feb 27, 2007 | Completed final sign-off Apr 2007 | 364 Winding Wy | repave existing driveway that shows sign of damage. at front of property with 10/10 wwf.Details
repave existing driveway that shows sign of damage. at front of property with 10/10 wwf. | $1,350 |
| Dec 26, 2006 | Completed final sign-off Jul 2007 | 190 Burlwood Dr | remodel e 1st floor, add n entertainment room, mremodel e bathroom, n closet, reolcate water heater and furnaceDetails
remodel e 1st floor, add n entertainment room, mremodel e bathroom, n closet, reolcate water heater and furnace | $20,000 |
| Sep 27, 2006 | Expired or cancelled expired Jun 2007 | 136 Randall St | remodeling one bathroom. @ top floor per title 24 new lighting install flourcentlyDetails
remodeling one bathroom. @ top floor per title 24 new lighting install flourcently | $7,500 |
| Sep 27, 2006 | Completed final sign-off Nov 2006 | 4420 Balboa St | remove some part of stucco (or all) to fix water leaking and dry rott issue. no change to look before and after.Details
remove some part of stucco (or all) to fix water leaking and dry rott issue. no change to look before and after. | $5,500 |
| Aug 14, 2006 | Expired or cancelled expired Jun 2007 | 126 Randall St | replace carpet with bamboo flooring. replace extg deck board with new deck board, install sheetrock in basement wall. replace a few door in its hardware. rplace foyer tile. new painting bath inside and outside. add one natural light at 126. replace fence ith new redwood fence (6' height).Details
replace carpet with bamboo flooring. replace extg deck board with new deck board, install sheetrock in basement wall. replace a few door in its hardware. rplace foyer tile. new painting bath inside and outside. add one natural light at 126. replace fence ith new redwood fence (6' height). | $25,000 |
| Jul 7, 2006 | Completed final sign-off Sep 2006 | 126 Randall St | replace existing cabinet, appliance (hood, range,Details
replace existing cabinet, appliance (hood, range, | $35,000 |
| Dec 1, 2005 | Completed final sign-off Jun 2006 | 410 45th Av | add 2 bedroom, 1 laundry room, 1 full bath on ground floor per plan. (e) rooms not permitted.Details
add 2 bedroom, 1 laundry room, 1 full bath on ground floor per plan. (e) rooms not permitted. | $30,000 |