150 permits since 2000: 129 completed, 4 in progress, 15 never finaled, 2 expired or cancelled.
Of the 15 never-finaled permits, 6 are 3 to 5 years old, 6 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 150.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2025 | In progress issued Jan 2025 | 4160 25th St | unit 4160a - 2nd fl. floor: kitchen remodel no structural workDetails
unit 4160a - 2nd fl. floor: kitchen remodel no structural work | $15,000 |
| Sep 17, 2024 | In progress issued Sep 2024 | 3015 Octavia St | master bathroom remodel, like for like, no wall demolition or construction, no change in plumbing fixture count.Details
master bathroom remodel, like for like, no wall demolition or construction, no change in plumbing fixture count. | $15,000 |
| Jul 30, 2024 | Completed final sign-off Oct 2024 | 915 Garfield St | revision to pa 202407015605 to obtain plans for adding non-structural wall in 2 bathrooms per building inspectorDetails
revision to pa 202407015605 to obtain plans for adding non-structural wall in 2 bathrooms per building inspector | |
| Jul 26, 2024 | Completed final sign-off Oct 2024 | 915 Garfield St | replace new dry-wall for all bedrooms living room and dinning room, insulated walls. use 5/8 type xDetails
replace new dry-wall for all bedrooms living room and dinning room, insulated walls. use 5/8 type x | $4,000 |
| Jul 26, 2024 | Completed final sign-off Aug 2024 | 1483 37th Av | to obtain final inspection for work approved 201907307400. all work is complete.Details
to obtain final inspection for work approved 201907307400. all work is complete. | |
| Jul 9, 2024 | Completed final sign-off Oct 2024 | 92 Country Club Dr | kitchen remodeling. no structural change.Details
kitchen remodeling. no structural change. | $18,000 |
| Jul 1, 2024 | Completed final sign-off Nov 2024 | 200 Carl St | unit 102: hall bathroom remodel (no structural change)Details
unit 102: hall bathroom remodel (no structural change) | $15,000 |
| Jul 1, 2024 | Completed final sign-off Oct 2024 | 915 Garfield St | remodeling kitchen, 2 bathrooms, no structural change on upstair. comply with nov#202287441 (#1, #2), nov#202177152 (#1 to #13), nov#202179521 (#1 to #4), nov#202181902 (#1 to #4)Details
remodeling kitchen, 2 bathrooms, no structural change on upstair. comply with nov#202287441 (#1, #2), nov#202177152 (#1 to #13), nov#202179521 (#1 to #4), nov#202181902 (#1 to #4) | $45,000 |
| May 15, 2024 | Completed final sign-off Sep 2024 | 138 Grand View Av | upstairs kitchen and bathroom remodel. no structural change. no moving walls.Details
upstairs kitchen and bathroom remodel. no structural change. no moving walls. | $40,000 |
| May 10, 2024 | In progress issued Jul 2024 | 4156 20th St | replace partial deteriorated foundation for approx 15 ln ft along the west side. reinforce (e) footing for approx 35 ln ft along east side.Details
replace partial deteriorated foundation for approx 15 ln ft along the west side. reinforce (e) footing for approx 35 ln ft along east side. | $20,000 |
| Apr 11, 2024 | In progress issued Apr 2024 | 4156 20th St | replace back and side on the rear windows. replace the siding on the back and rear sides. approx 1200 sq. ft. 16 windows.Details
replace back and side on the rear windows. replace the siding on the back and rear sides. approx 1200 sq. ft. 16 windows. | $20,000 |
| Apr 11, 2024 | Completed final sign-off May 2025 | 2201 Pine St | replace right side of building windows or replace siding with vinyl or fiber glass windows. hardie board 3200 sqft approx.Details
replace right side of building windows or replace siding with vinyl or fiber glass windows. hardie board 3200 sqft approx. | $50,000 |
| Apr 5, 2024 | Completed final sign-off Sep 2024 | 136 Grand View Av | interior remodel 2nd fl: relocate (e) kitchen add (n) bath & (n) bedroom and remodel (e) bath 1st fl: relocate (e) kitchen and (e) bedroom and remodel (e) bathDetails
interior remodel 2nd fl: relocate (e) kitchen add (n) bath & (n) bedroom and remodel (e) bath 1st fl: relocate (e) kitchen and (e) bedroom and remodel (e) bath | $80,000 |
| Mar 12, 2024 | Completed final sign-off Nov 2024 | 76 Getz St | remove stone fire place at 1st floor. replace 1st floor rear facade window and door, remodel 1st floor bath, expand into garage, convert closet to coffee bar. install 1 new side window not visable from street. install skylight at 2nd floor roof over stairs.Details
remove stone fire place at 1st floor. replace 1st floor rear facade window and door, remodel 1st floor bath, expand into garage, convert closet to coffee bar. install 1 new side window not visable from street. install skylight at 2nd floor roof over stairs. | $120,000 |
| Nov 7, 2023 | Completed final sign-off Aug 2024 | 1564 Green St | 4th floor, front and back change stucco to siding. change metal roofing to shingles on roof revision to permit #202203150056Details
4th floor, front and back change stucco to siding. change metal roofing to shingles on roof revision to permit #202203150056 | |
| Oct 23, 2023 | Completed final sign-off Dec 2023 | 1983 California St | laundry room remodeling @same loction, replace in-kindDetails
laundry room remodeling @same loction, replace in-kind | $6,000 |
| Sep 26, 2023 | Completed final sign-off Apr 2024 | 1206 33rd Av | replace whole house windows @ same location. all windows, same size, same locations, max u-factor 0.30.Details
replace whole house windows @ same location. all windows, same size, same locations, max u-factor 0.30. | $10,000 |
| Sep 21, 2023 | Completed final sign-off Nov 2024 | 2116 Thomas Av | recommencement and completion of work approved under permit 201910164675Details
recommencement and completion of work approved under permit 201910164675 | |
| Sep 11, 2023 | Completed final sign-off Jan 2026 | 4156 20th St | unit 1: convert storage to office space at basement. 4158b: new interior stair from first floor to basement. remove chimney. remodel downstair bath. unit 2: remove chimney and provide electric fire place.Details
unit 1: convert storage to office space at basement. 4158b: new interior stair from first floor to basement. remove chimney. remodel downstair bath. unit 2: remove chimney and provide electric fire place. | $40,000 |
| Jul 25, 2023 | Completed final sign-off Apr 2024 | 1206 33rd Av | remodeling 2 bathrooms and 1 kitchen. updated electric to 200amp. sam size and same location.Details
remodeling 2 bathrooms and 1 kitchen. updated electric to 200amp. sam size and same location. | $40,000 |
| Jun 23, 2023 | Never finaled issued Jun 2023, no final | 4156 20th St | (1) kitchen and (1) bathroom remodeling in kind. no structural work. no floor layout changes. no wall layout changes.Details
(1) kitchen and (1) bathroom remodeling in kind. no structural work. no floor layout changes. no wall layout changes. | $35,000 |
| May 31, 2023 | Completed final sign-off Jan 2024 | 19 Prosper St | kitchen and bathroom remodeling @ same locationDetails
kitchen and bathroom remodeling @ same location | $35,000 |
| May 2, 2023 | Never finaled issued May 2023, no final | 4160 25th St | remodel bathroom and kitchen on 2nd fl; structural strengthening with plywood sheathing, floor strengthening where needed; remove two windows and relocate door on 1st fl; window replacement; no increase in square footage of existing space. amend to pa202302031394 for additional work.Details
remodel bathroom and kitchen on 2nd fl; structural strengthening with plywood sheathing, floor strengthening where needed; remove two windows and relocate door on 1st fl; window replacement; no increase in square footage of existing space. amend to pa202302031394 for additional work. | $85,000 |
| Mar 17, 2023 | Completed final sign-off May 2024 | 706 25th Av | revision to permit 202212097966. replace lath and plaster with sheet rock on 2/f. revise beam and step on 1/f plan, and existing window at rear to remain.Details
revision to permit 202212097966. replace lath and plaster with sheet rock on 2/f. revise beam and step on 1/f plan, and existing window at rear to remain. | |
| Feb 22, 2023 | Completed final sign-off Jan 2024 | 325 Harvard St | replace front house 2 new aluminum clad wood windows at same location. rear windows 6 retrofit windows at same loction. 1 sliding door at same location. replace up stair bedrooms sheet rock and living room sheet rock on 2nd floor.Details
replace front house 2 new aluminum clad wood windows at same location. rear windows 6 retrofit windows at same loction. 1 sliding door at same location. replace up stair bedrooms sheet rock and living room sheet rock on 2nd floor. | $25,000 |
| Feb 3, 2023 | Never finaled issued Feb 2023, no final | 4160 25th St | (1) kitchen remodel, no structural changeDetails
(1) kitchen remodel, no structural change | $15,000 |
| Feb 2, 2023 | Completed final sign-off Oct 2023 | 1220 Pine St | (1) kitchen (1) bathroom remodel, no structural workDetails
(1) kitchen (1) bathroom remodel, no structural work | $35,000 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 4162 25th St | (1) kitchen (1) bathroom remodel, no structural change replace side & back windows at same locationDetails
(1) kitchen (1) bathroom remodel, no structural change replace side & back windows at same location | $35,000 |
| Dec 9, 2022 | Completed final sign-off Apr 2024 | 706 25th Av | add two bedrooms and laundry on the 1st fl. add sliding door on 2nd fl. decay reapir rear deck and stairs in kindDetails
add two bedrooms and laundry on the 1st fl. add sliding door on 2nd fl. decay reapir rear deck and stairs in kind | $85,000 |
| Oct 14, 2022 | Never finaled issued Oct 2022, no final | 706 25th Av | remodel upstairs hallway master bath. kitchen remodel.- in kind no structural change. replace (14) retrofit windows (front, back, and lightwell)- in kindDetails
remodel upstairs hallway master bath. kitchen remodel.- in kind no structural change. replace (14) retrofit windows (front, back, and lightwell)- in kind | $45,000 |
| Sep 23, 2022 | Completed final sign-off May 2023 | 1591 43rd Av | decay repair and replacement front entry stair in kind. replace terazzo w/slip resistant tile.Details
decay repair and replacement front entry stair in kind. replace terazzo w/slip resistant tile. | $7,500 |
| Jun 6, 2022 | Completed final sign-off Aug 2024 | 1564 Green St | replace existing siding with new siding (in kind) on the back & lightwell area. approx 1300 sqft.Details
replace existing siding with new siding (in kind) on the back & lightwell area. approx 1300 sqft. | $8,000 |
| Jun 6, 2022 | Completed final sign-off Nov 2022 | 2847 Turk St | hall bath room 1.5 bathroom. remodeling no structural change.Details
hall bath room 1.5 bathroom. remodeling no structural change. | $15,000 |
| May 19, 2022 | Completed final sign-off Jan 2024 | 325 Harvard St | add bathroom on 1st fl. add sink and electric top & refrigerator and family room @ 1st fl. remove stairs on 2nd fl, and reconfigure room & add one 20Details
add bathroom on 1st fl. add sink and electric top & refrigerator and family room @ 1st fl. remove stairs on 2nd fl, and reconfigure room & add one 20 | $80,000 |
| May 10, 2022 | Completed final sign-off May 2022 | 1135 Monterey Bl | replace rear patio door & side entry door. no structural change. same size and loc.Details
replace rear patio door & side entry door. no structural change. same size and loc. | $7,500 |
| Apr 26, 2022 | Completed final sign-off Aug 2024 | 1591 43rd Av | one story rear deck decay and replace structural elements and material in-kind.Details
one story rear deck decay and replace structural elements and material in-kind. | $5,000 |
| Apr 26, 2022 | Completed final sign-off Nov 2022 | 1040 De Haro St | structural revision to bpa#201706270490Details
structural revision to bpa#201706270490 | $1,500 |
| Mar 22, 2022 | Completed final sign-off Aug 2024 | 1591 43rd Av | repair front stair, repair back deck. less than 50% remodel hall bathroom, no structural changes. & no wall movedDetails
repair front stair, repair back deck. less than 50% remodel hall bathroom, no structural changes. & no wall moved | $25,000 |
| Mar 16, 2022 | Completed final sign-off Aug 2022 | 2750 Market St | replace master and hall bathroom shower only, tile, and fixtures.Details
replace master and hall bathroom shower only, tile, and fixtures. | $15,000 |
| Mar 15, 2022 | Completed final sign-off Aug 2024 | 1564 Green St | residential addition on to existing second floor of upper unit #1564.Details
residential addition on to existing second floor of upper unit #1564. | $35,000 |
| Mar 7, 2022 | Completed final sign-off Aug 2022 | 2231 Sutter St | correction of violation 202175959 and nov202286368 #1-4 and 6-9. plans required for stair repair.Details
correction of violation 202175959 and nov202286368 #1-4 and 6-9. plans required for stair repair. | $15,000 |
| Feb 28, 2022 | Completed final sign-off Mar 2023 | 117 Hartford St | unit 3: demolition of interior finish materials, structural. interior alterations of bathrooms & kitchen, add (2) new skylights.Details
unit 3: demolition of interior finish materials, structural. interior alterations of bathrooms & kitchen, add (2) new skylights. | $23,000 |
| Feb 28, 2022 | Completed final sign-off May 2022 | 742 Hayes St | kitchen remodel. no structural change. replace cabinets, countertops, appliances, lighting and sink in unit 742 only.Details
kitchen remodel. no structural change. replace cabinets, countertops, appliances, lighting and sink in unit 742 only. | $18,000 |
| Feb 17, 2022 | Completed final sign-off Mar 2022 | 145 Waverly Pl | ref pa 202102023831 for dph review only. no change from previously issued dwgs.Details
ref pa 202102023831 for dph review only. no change from previously issued dwgs. | |
| Feb 10, 2022 | Never finaled issued Feb 2022, no final | 326 Athens St | repair front house stucco in kind.Details
repair front house stucco in kind. | $3,500 |
| Jan 4, 2022 | Completed final sign-off Aug 2024 | 1564 Green St | revision to existing permit 2021-0930-9553 interior alterations to convert storage into habitable 1st floor. replace existing lightwell ladder(wood) with metal. new roof deck to provide private open space for third floor unit. new windows at rear facade.Details
revision to existing permit 2021-0930-9553 interior alterations to convert storage into habitable 1st floor. replace existing lightwell ladder(wood) with metal. new roof deck to provide private open space for third floor unit. new windows at rear facade. | $23,000 |
| Dec 3, 2021 | Completed final sign-off Sep 2022 | 1631 35th Av | upstairs: hall one bathroom full remodel. no structural change. same layout no wall removal. replace existing retrofit bathroom window.Details
upstairs: hall one bathroom full remodel. no structural change. same layout no wall removal. replace existing retrofit bathroom window. | $10,000 |
| Nov 12, 2021 | Completed final sign-off Mar 2022 | 145 Waverly Pl | revision to app#202102023831. new accessible entry doors. and new accessible restroom. new partition walls. repair t-bar ceiling as needed.Details
revision to app#202102023831. new accessible entry doors. and new accessible restroom. new partition walls. repair t-bar ceiling as needed. | |
| Nov 10, 2021 | Completed final sign-off Feb 2022 | 235 Lowell St | downstair hall bathroom remodel. no structural change.Details
downstair hall bathroom remodel. no structural change. | $10,000 |
| Sep 30, 2021 | Completed final sign-off Aug 2024 | 1564 Green St | revision to pa 202106071779 modification to structural sheets.Details
revision to pa 202106071779 modification to structural sheets. | |
| Sep 13, 2021 | Completed final sign-off Mar 2022 | 1040 De Haro St | 1. replace the new siding on the left side of bldg. 2. replace middle level floor front windows. replacement fenestration max. u-factor = 0.40Details
1. replace the new siding on the left side of bldg. 2. replace middle level floor front windows. replacement fenestration max. u-factor = 0.40 | $8,000 |
| Sep 13, 2021 | Completed final sign-off Feb 2022 | 625 Campbell Av | remodel the kitchen same layout as existing.Details
remodel the kitchen same layout as existing. | $15,000 |
| Jul 15, 2021 | Completed final sign-off Feb 2022 | 625 Campbell Av | one hall bath and one master bath remodeling. no structural cahnge. six front window replace same as existig windows replace new roofing.Details
one hall bath and one master bath remodeling. no structural cahnge. six front window replace same as existig windows replace new roofing. | $38,000 |
| Jul 2, 2021 | Completed final sign-off May 2022 | 1135 Monterey Bl | downstair master bathroom remodeling. no sturctual change, no layout change. replace back retrofit windows, not visible from street.Details
downstair master bathroom remodeling. no sturctual change, no layout change. replace back retrofit windows, not visible from street. | $10,000 |
| Jul 2, 2021 | Completed final sign-off Nov 2022 | 2 Fallon Pl | remodel two bath(hall and master) no structural change. & 1 laundry, no layout change.Details
remodel two bath(hall and master) no structural change. & 1 laundry, no layout change. | $30,000 |
| Jul 2, 2021 | Completed final sign-off Oct 2022 | 59 Douglass St | kitchen remodeling. no structural change. no layout change. replace new cabinets, new fixtures, new floor, new appliances, and new lights.Details
kitchen remodeling. no structural change. no layout change. replace new cabinets, new fixtures, new floor, new appliances, and new lights. | $20,000 |
| Jun 7, 2021 | Completed final sign-off Aug 2024 | 1564 Green St | interior alterations of 2 dwellings. remodel of kitchens & bathrooms. voluntary structural improvements. installation of sprinklers.Details
interior alterations of 2 dwellings. remodel of kitchens & bathrooms. voluntary structural improvements. installation of sprinklers. | $150,000 |
| May 28, 2021 | Never finaled issued May 2021, no final | 2235 Sutter St | to comply with complaint #2020175959. repair stairs & deck. repair all windows glazing seals sash cords. sash frames & latches hardware. fix the plumbing leak, less than 50% repair. repair damaged wall ceiling, repair water damge. repair floor covers. remove paint, repaint the exterior wall damagedDetails
to comply with complaint #2020175959. repair stairs & deck. repair all windows glazing seals sash cords. sash frames & latches hardware. fix the plumbing leak, less than 50% repair. repair damaged wall ceiling, repair water damge. repair floor covers. remove paint, repaint the exterior wall damaged | $5,000 |
| Mar 17, 2021 | Completed final sign-off Oct 2022 | 59 Douglass St | remodel 2nd floor unit #59 to include a new washer and dryer closet, convert storage area to a new 1/2 bath, create a small office.Details
remodel 2nd floor unit #59 to include a new washer and dryer closet, convert storage area to a new 1/2 bath, create a small office. | $20,000 |
| Feb 2, 2021 | Completed final sign-off Mar 2022 | 145 Waverly Pl | tenant improvement: change of use from "b" to "m" occupancy. new accessible restroom. new ceiling, partitions, doors and hardware, flooring, lighting, power and finishes. must comply with sffc 1103.7.6.1 fire alarm under sep permit.Details
tenant improvement: change of use from "b" to "m" occupancy. new accessible restroom. new ceiling, partitions, doors and hardware, flooring, lighting, power and finishes. must comply with sffc 1103.7.6.1 fire alarm under sep permit. | $80,000 |
| Feb 1, 2021 | Completed final sign-off May 2021 | 1537 Lake St | remodel hall bath room (no structural work)Details
remodel hall bath room (no structural work) | $5,000 |
| Feb 1, 2021 | Completed final sign-off Apr 2021 | 2639 22nd Av | lightwell repair & seal due to leaking.Details
lightwell repair & seal due to leaking. | $2,000 |
| Jan 26, 2021 | Completed final sign-off May 2021 | 210 29th St | one kitchen, one bathroom remodeling (no wall or structural change). only replacement of tiles, cabinet countertop & fixtures only.Details
one kitchen, one bathroom remodeling (no wall or structural change). only replacement of tiles, cabinet countertop & fixtures only. | $30,000 |
| Jan 7, 2021 | Completed final sign-off Jul 2021 | 29 Lupine Av | unit a - kitchen and bathroom remodeling. no wall changeDetails
unit a - kitchen and bathroom remodeling. no wall change | $30,000 |
| Dec 11, 2020 | Completed final sign-off Mar 2021 | 3738 Scott St | master bath room remodel on top floor. no structural change. no window change. no wall removal.Details
master bath room remodel on top floor. no structural change. no window change. no wall removal. | $14,000 |
| Sep 24, 2020 | Completed final sign-off Apr 2021 | 241 Ashbury St | unit 1. kitchen remodel. no structural change.Details
unit 1. kitchen remodel. no structural change. | $18,000 |
| Sep 24, 2020 | Completed final sign-off Mar 2022 | 1040 De Haro St | remodel 1 kitchen, hall bath and master bath, in-kind. no walls moved or relocated. repair 400 sq ft siding at rear.Details
remodel 1 kitchen, hall bath and master bath, in-kind. no walls moved or relocated. repair 400 sq ft siding at rear. | $45,000 |
| Sep 21, 2020 | Completed final sign-off Dec 2023 | 244 Hartford St | remodel of unit 244 on 3/f.Details
remodel of unit 244 on 3/f. | $35,000 |
| Sep 11, 2020 | Completed final sign-off Dec 2021 | 2235 Sutter St | comply with nov202044841. add (n) washer & dryer (laundry area). replace (bn) counter cabinet top & bottom. remodel bathroom #2. replace sheetrock in walls and ceilingDetails
comply with nov202044841. add (n) washer & dryer (laundry area). replace (bn) counter cabinet top & bottom. remodel bathroom #2. replace sheetrock in walls and ceiling | $15,000 |
| Aug 25, 2020 | Expired or cancelled withdrawn Sep 2020 | 2750 Market St | revision to 202006249095 kitchen remodel to include removal of one non structural wall.Details
revision to 202006249095 kitchen remodel to include removal of one non structural wall. | $1,000 |
| Aug 14, 2020 | Never finaled issued Aug 2020, no final | 29 Lupine Av | replacement of one window at front, in size of 6'x4' aluminium clad window up to code. no change of opening/location.Details
replacement of one window at front, in size of 6'x4' aluminium clad window up to code. no change of opening/location. | $1,000 |
| Jul 29, 2020 | Completed final sign-off Feb 2021 | 1438 Green St | remodel of kitchen (90 sq ft) and 2 bathrooms (50 sq ft each). no structural change. replace new cabinets, new counters, new flooring, new tiles, new appliances for kitchen, new fixtures and new lights.Details
remodel of kitchen (90 sq ft) and 2 bathrooms (50 sq ft each). no structural change. replace new cabinets, new counters, new flooring, new tiles, new appliances for kitchen, new fixtures and new lights. | $35,000 |
| Jun 24, 2020 | Completed final sign-off Jan 2021 | 2750 Market St | unit 203- kitchen remodel: replace kitchen sink, dishwasher, cooktop, oven, refrigerator. kitchen base approx: 10'x8'. all work in kind.Details
unit 203- kitchen remodel: replace kitchen sink, dishwasher, cooktop, oven, refrigerator. kitchen base approx: 10'x8'. all work in kind. | $15,000 |
| Feb 19, 2020 | Completed final sign-off Jun 2020 | 3017 Octavia St | back and right side back repair and replace siding. work not visible from street. all work in kind.Details
back and right side back repair and replace siding. work not visible from street. all work in kind. | $5,000 |
| Jan 9, 2020 | Completed final sign-off Jan 2020 | 135 Holladay Av | demo of e deck at right side. comply w/ nov #201802151Details
demo of e deck at right side. comply w/ nov #201802151 | $2,500 |
| Sep 6, 2019 | Completed final sign-off Jun 2020 | 744 18th Av | hallway bathroom remodel (no structural change). front 4 windows replace at same location. wood windows; original pattern, true divided light with integrated ogee lugs.Details
hallway bathroom remodel (no structural change). front 4 windows replace at same location. wood windows; original pattern, true divided light with integrated ogee lugs. | $10,000 |
| Jul 30, 2019 | Expired or cancelled cancelled Jun 2023 | 1454 17th Av | (unit#1456) hallway bathroom & kitchen remodel. no wall changes.Details
(unit#1456) hallway bathroom & kitchen remodel. no wall changes. | $25,000 |
| Jul 30, 2019 | Completed final sign-off Feb 2020 | 1980 Vallejo St | unit 3 - remodel 3 bathrooms, 1 kitchen. no wall change.Details
unit 3 - remodel 3 bathrooms, 1 kitchen. no wall change. | $45,000 |
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 1483 37th Av | remodel 1 1/2 bathroom hallway in kind. no change to walls.Details
remodel 1 1/2 bathroom hallway in kind. no change to walls. | $8,000 |
| Jul 5, 2019 | Completed final sign-off Jun 2020 | 3017 Octavia St | remodel two bathrooms and one kitchen,\. no change of wallsDetails
remodel two bathrooms and one kitchen,\. no change of walls | $35,000 |
| Jun 5, 2019 | Completed final sign-off Oct 2019 | 2733 Golden Gate Av | repair the bak of house siding and change 4 windows at same location, same size.Details
repair the bak of house siding and change 4 windows at same location, same size. | $6,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 111 New Montgomery St | demo the office. floors, ceiling panel (all dry walls) no structural work under this permit.Details
demo the office. floors, ceiling panel (all dry walls) no structural work under this permit. | $5,000 |
| Feb 27, 2019 | Completed final sign-off Sep 2019 | 793 14th Av | kitchen remodelling with no structural change. no new wall and no existing wall relocation. all new sheet rock shall be 5/8" type x gyp. board. new lighting shall comply with cec 150.0(k)3.Details
kitchen remodelling with no structural change. no new wall and no existing wall relocation. all new sheet rock shall be 5/8" type x gyp. board. new lighting shall comply with cec 150.0(k)3. | $15,000 |
| Feb 8, 2019 | Completed final sign-off Jun 2020 | 482 Douglass St | revision to pa 201810264282. add 110 sq ft to proposed bathroom under (e) overhang. revise bath # 2 layout, extend retaining wall to create patio, relocate at 1st flr.Details
revision to pa 201810264282. add 110 sq ft to proposed bathroom under (e) overhang. revise bath # 2 layout, extend retaining wall to create patio, relocate at 1st flr. | $45,000 |
| Nov 27, 2018 | Never finaled issued Nov 2018, no final | 1835 Franklin St | unit 403: install laundry roomDetails
unit 403: install laundry room | $4,000 |
| Nov 27, 2018 | Completed final sign-off Jun 2019 | 1378 Mcallister St | full remodeling two bathrooms and one kitchen. (no structural change)Details
full remodeling two bathrooms and one kitchen. (no structural change) | $45,000 |
| Oct 16, 2018 | Never finaled issued Oct 2018, no final | 3015 Octavia St | remodel bathroom in kind. no structural work.Details
remodel bathroom in kind. no structural work. | $10,000 |
| Aug 2, 2018 | Completed final sign-off Oct 2018 | 1025 Geneva Av | apt 6: bathroom remodeling. replace new fixtures, tiles,vanity, electrical light & fan. no structural changes. replace in same location/layout.Details
apt 6: bathroom remodeling. replace new fixtures, tiles,vanity, electrical light & fan. no structural changes. replace in same location/layout. | $9,000 |
| Jul 18, 2018 | Completed final sign-off Dec 2018 | 2733 Golden Gate Av | kitchen & half-bathroom - full remodeling. in-kind, no structurual work..Details
kitchen & half-bathroom - full remodeling. in-kind, no structurual work.. | $15,000 |
| Jul 12, 2018 | Completed final sign-off Apr 2019 | 131 Harold Av | reroofing.Details
reroofing. | $8,000 |
| Jun 14, 2018 | Completed final sign-off Nov 2018 | 793 14th Av | bathroom full remodeling & laundry room at same location.Details
bathroom full remodeling & laundry room at same location. | $10,000 |
| May 29, 2018 | Completed final sign-off Feb 2019 | 2267 32nd Av | remodel the kitchen and bathroom at same location. no change to wall locations or new walls.Details
remodel the kitchen and bathroom at same location. no change to wall locations or new walls. | $20,000 |
| Feb 5, 2018 | Completed final sign-off Aug 2018 | 475 10th Av | remodeling hallway bathroom @ same location. new plumbing fixtures, tiles, electric outlets, light and paintingDetails
remodeling hallway bathroom @ same location. new plumbing fixtures, tiles, electric outlets, light and painting | $8,000 |
| Dec 7, 2017 | Completed final sign-off Apr 2019 | 131 Harold Av | infill existing lightwell at 1st/2nd fl north side of building. remodel 1st fl to include family rm,powder rm, bedroom, closet, laundry rm. new interior stair connectiong 1st and 2nd fl. removel 2nd fl to include kitchen, dining room, hall bath. new stairs at rear from 1st fl toDetails
infill existing lightwell at 1st/2nd fl north side of building. remodel 1st fl to include family rm,powder rm, bedroom, closet, laundry rm. new interior stair connectiong 1st and 2nd fl. removel 2nd fl to include kitchen, dining room, hall bath. new stairs at rear from 1st fl to | $160,000 |
| Sep 19, 2017 | Completed final sign-off Oct 2017 | 2665 Sacramento St | bathroom remodeling: replace new tub, new cabinet, new window, new tiles, new ligts, outlets. all at the same location. no change on walls. n/a maherDetails
bathroom remodeling: replace new tub, new cabinet, new window, new tiles, new ligts, outlets. all at the same location. no change on walls. n/a maher | $8,000 |
| Aug 31, 2017 | Completed final sign-off May 2018 | 439 03rd Av | revision to 201706300769. structural changes only. removal of post and beam at lower levelDetails
revision to 201706300769. structural changes only. removal of post and beam at lower level | $1,000 |
| Aug 9, 2017 | Completed final sign-off May 2018 | 2172 Pine St | install new siding on the west side of back outside bldg.Details
install new siding on the west side of back outside bldg. | $22,000 |
| Jun 30, 2017 | Completed final sign-off May 2018 | 439 03rd Av | remodel at lower & main level. replace (e) interior bearing wall at main level with new existing steel beam. legalize 2 bathrooms including 1 on ground floor. new washer and dryer. replace (e) tile flooring at deck. new grill at rear yardDetails
remodel at lower & main level. replace (e) interior bearing wall at main level with new existing steel beam. legalize 2 bathrooms including 1 on ground floor. new washer and dryer. replace (e) tile flooring at deck. new grill at rear yard | $50,000 |
| Jun 27, 2017 | Completed final sign-off Nov 2022 | 1040 De Haro St | horizontal addition @ rearDetails
horizontal addition @ rear | $15,000 |
| Mar 29, 2017 | Completed final sign-off Jun 2017 | 1867 Page St | 1 kitchen & 1 bathroom remodel. same location.Details
1 kitchen & 1 bathroom remodel. same location. | $25,000 |