Golden State Concrete
- Based in
- Brentwood
- On San Francisco permits
- Jun 2025 to Jun 2025
- Last 24 months
- 1 permit filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2025 | Completed final sign-off Aug 2025 | 312 Judson Av | demo (provide additional shoring before demo), framing and stucco work, garage door repair, and paint work. replace stucco in-kind. replace wood structure (2x6 studs) in-kind. replace reels and pins for garage door in-kind. replace electrical pipes in-kind.Details
demo (provide additional shoring before demo), framing and stucco work, garage door repair, and paint work. replace stucco in-kind. replace wood structure (2x6 studs) in-kind. replace reels and pins for garage door in-kind. replace electrical pipes in-kind. | $10,000 |