Golden State Builders Group Inc
- Based in
- Walnut Creek
- On San Francisco permits
- Sep 2024 to Sep 2026
- Last 24 months
- 29 permits filed
31 permits since 2000: 22 completed, 9 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 36 Rivoli St | structural enhancement to construct a new roof and deck.Details
structural enhancement to construct a new roof and deck. | $20,000 |
| Jul 24, 2026 | In progress issued Aug 2026 | 260 Amber Dr | replace 200 sqft deckboards and 60 lf handrails w/ 200 sqft trex enhance deckboards and 60 lf trex composite handrails.Details
replace 200 sqft deckboards and 60 lf handrails w/ 200 sqft trex enhance deckboards and 60 lf trex composite handrails. | $20,000 |
| Jul 16, 2026 | In progress issued Jul 2026 | 2447 Chestnut St | repair stairs, flashing and railing, back of property less than 50% repair, repair upper unit only deck slats, less than 50%. no work is street facing. exterior rear stairs less than 50% non street facing.Details
repair stairs, flashing and railing, back of property less than 50% repair, repair upper unit only deck slats, less than 50%. no work is street facing. exterior rear stairs less than 50% non street facing. | $30,000 |
| Feb 19, 2026 | Completed final sign-off Mar 2026 | 830 Wisconsin St | remove 100 sq ft wood deck boards only. replace with trex boards 100 sq ft less than 50%. rear deck.Details
remove 100 sq ft wood deck boards only. replace with trex boards 100 sq ft less than 50%. rear deck. | $5,000 |
| Feb 6, 2026 | Completed final sign-off Mar 2026 | 220 Winfield St | replace 100 sq ft of wood siding with wood siding like for like on right side. to comply with nov 202649058 item #2.Details
replace 100 sq ft of wood siding with wood siding like for like on right side. to comply with nov 202649058 item #2. | $7,000 |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 10 Imperial Al | replace cement shingles with hardie fiber cement siding, rear wall only 800 sq ft, no visible from streetDetails
replace cement shingles with hardie fiber cement siding, rear wall only 800 sq ft, no visible from street | $20,000 |
| Jan 16, 2026 | Completed final sign-off Feb 2026 | 3823 Cesar Chavez St | stair 1 deck repair, less than 50% replace w/ new wood in-kind not visible from the street.Details
stair 1 deck repair, less than 50% replace w/ new wood in-kind not visible from the street. | $16,500 |
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 2257 15th Av | remove & replace 2nd fl deck & guardrail at 2) 2-story houseDetails
remove & replace 2nd fl deck & guardrail at 2) 2-story house | $25,000 |
| Dec 17, 2025 | Completed final sign-off Jan 2026 | 2279 43rd Av | replace 3 windows and 1 sliding door like for like vinyl in back side of house, not facing the street, same size same location, opening and material. (max. u-factor=0.30)Details
replace 3 windows and 1 sliding door like for like vinyl in back side of house, not facing the street, same size same location, opening and material. (max. u-factor=0.30) | $6,000 |
| Nov 14, 2025 | Completed final sign-off Dec 2025 | 43 Cayuga Av | voluntary strengthening of ground floor area to reduce risk of damage per plan set a. not part of ebb programDetails
voluntary strengthening of ground floor area to reduce risk of damage per plan set a. not part of ebb program | $10,000 |
| Oct 24, 2025 | Completed final sign-off Nov 2025 | 45 Aloha Av | replace 660 sqft siding on east face/wall and sidings for porch. like for like, same material and style.Details
replace 660 sqft siding on east face/wall and sidings for porch. like for like, same material and style. | $7,260 |
| Oct 24, 2025 | Completed final sign-off Jan 2026 | 2279 43rd Av | replace 500 sq ft of wood siding with hardie fiber cement lap siding pre paint back wall only. not visible from street.Details
replace 500 sq ft of wood siding with hardie fiber cement lap siding pre paint back wall only. not visible from street. | $15,000 |
| Oct 1, 2025 | Completed final sign-off Jun 2026 | 500 Bella Vista Wy | install and remove stucco and replace with james hardie fiber cement 2100 sq ft on all walls. visible from street.Details
install and remove stucco and replace with james hardie fiber cement 2100 sq ft on all walls. visible from street. | $25,000 |
| Sep 19, 2025 | In progress issued Sep 2025 | 1854 Great Hy | replace 480 sq ft of wood shingle with vertical wood plank siding front and sides wall onlyDetails
replace 480 sq ft of wood shingle with vertical wood plank siding front and sides wall only | $6,000 |
| Sep 19, 2025 | Completed final sign-off Dec 2025 | 3821 Cesar Chavez St | replace 1400 sqft of wood siding with hardie fiber cement lap siding at rear and both side walls only, all three stories. existing plywood behind existing wood siding to remain.Details
replace 1400 sqft of wood siding with hardie fiber cement lap siding at rear and both side walls only, all three stories. existing plywood behind existing wood siding to remain. | $20,000 |
| Sep 19, 2025 | Completed final sign-off Dec 2025 | 598 29th St | replace wood siding 320 sq ft like for like side wall only. no visible from street.Details
replace wood siding 320 sq ft like for like side wall only. no visible from street. | $10,000 |
| Aug 15, 2025 | In progress issued Aug 2025 | 43 Cayuga Av | replace wood siding with james hardie fiber cement siding, 2250 sq. ft. on all wallsDetails
replace wood siding with james hardie fiber cement siding, 2250 sq. ft. on all walls | $27,000 |
| Aug 15, 2025 | In progress filed Aug 2025, not yet issued | 111 States St | rebuild (e) deck with same size, sqft shape and location.Details
rebuild (e) deck with same size, sqft shape and location. | $13,000 |
| Jul 25, 2025 | Completed final sign-off Sep 2025 | 3426 19th St | replace trim on 3 windows facing the street. (front of the house) no change to windlow location or size. (trim only, not window replacement)Details
replace trim on 3 windows facing the street. (front of the house) no change to windlow location or size. (trim only, not window replacement) | $6,000 |
| Jul 25, 2025 | Completed final sign-off Sep 2025 | 925 Corbett Av | replace 480 sq ft of cedar shingles (not roof) in kind and paint front south wall. street visible.Details
replace 480 sq ft of cedar shingles (not roof) in kind and paint front south wall. street visible. | $15,000 |
| Jul 2, 2025 | Completed final sign-off Feb 2026 | 4 Seymour St | replace 885 sqft of wood siding with fiber cement siding front wall only and paint. horizontal sidingDetails
replace 885 sqft of wood siding with fiber cement siding front wall only and paint. horizontal siding | $35,000 |
| May 15, 2025 | Completed final sign-off Jun 2025 | 848 46th Av | rotten studs repair at east side in kindDetails
rotten studs repair at east side in kind | $15,000 |
| Apr 10, 2025 | Completed final sign-off Jul 2025 | 220 Parque Dr | replace 400 sqft of wood siding to fiber cement siding. side of the house.Details
replace 400 sqft of wood siding to fiber cement siding. side of the house. | $10,000 |
| Apr 10, 2025 | Completed final sign-off Jun 2025 | 848 46th Av | replace 1000 sqft of wood siding with james hardie fiber cement planks. all work is on side of the houseDetails
replace 1000 sqft of wood siding with james hardie fiber cement planks. all work is on side of the house | $15,000 |
| Feb 21, 2025 | Completed final sign-off Jul 2025 | 1001 Pine St | unit #910: kitchen and bathroom remodel like for likeDetails
unit #910: kitchen and bathroom remodel like for like | $50,000 |
| Jan 31, 2025 | Completed final sign-off Feb 2025 | 47 Mirabel Av | 600 sqft wood siding replacement with fiber cement in 2 back walls.Details
600 sqft wood siding replacement with fiber cement in 2 back walls. | $10,000 |
| Dec 17, 2024 | Completed final sign-off Mar 2025 | 156 Putnam St | install 2 story deck with stairs and guardrailDetails
install 2 story deck with stairs and guardrail | $65,000 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 143 Ashbury St | replacing 300 sq ft of wood bevel channel siding with hardie fiber cement planks on the west wall. not visible from street.Details
replacing 300 sq ft of wood bevel channel siding with hardie fiber cement planks on the west wall. not visible from street. | $10,000 |
| Nov 6, 2024 | In progress issued Nov 2024 | 289 Chestnut St | revision to permit: 2024-0927-1819: remove 800 sqfft of wood shingles and install fiber cement on the back wall. not visible from the streetDetails
revision to permit: 2024-0927-1819: remove 800 sqfft of wood shingles and install fiber cement on the back wall. not visible from the street | |
| Sep 27, 2024 | In progress issued Sep 2024 | 289 Chestnut St | 1300 sf siding replacement of wood widing fiber cement on the west wall located at side of building, not visible from street. no structural sheathing will be altered.Details
1300 sf siding replacement of wood widing fiber cement on the west wall located at side of building, not visible from street. no structural sheathing will be altered. | $10,000 |
| Sep 6, 2024 | Completed final sign-off Nov 2024 | 300 Campbell Av | replace 2500 sq ft of stucco and vinyl siding with james hardie fiber cement planks on all 4 walls.Details
replace 2500 sq ft of stucco and vinyl siding with james hardie fiber cement planks on all 4 walls. | $10,000 |