Golden Star Construction
- Based in
- North Hollywood
- On San Francisco permits
- Jul 2019 to Jul 2021
- Last 24 months
- 0 permits filed
14 permits since 2000: 6 completed, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2021 | Completed final sign-off Nov 2021 | 477 Hazelwood Av | replace one window installation, stucco patching, window not facing street.Details
replace one window installation, stucco patching, window not facing street. | $3,000 |
| Jul 27, 2021 | Expired or cancelled cancelled Jan 2026 | 477 Hazelwood Av | bathroom remodel. adding two recessed lights, switches, two receptacles, and one ceiling fan, also adding one vanity, one toilet and one shower.Details
bathroom remodel. adding two recessed lights, switches, two receptacles, and one ceiling fan, also adding one vanity, one toilet and one shower. | $18,000 |
| Jul 13, 2021 | Never finaled issued Mar 2022, no final | 106 Country Club Dr | new 660 sq ft adu on garage level.Details
new 660 sq ft adu on garage level. | $60,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 477 Hazelwood Av | remodeling of 3 bathrooms, upgrade to 200 amp electri box. rewire home, office/bedroom converted to full bedroom at lower levelDetails
remodeling of 3 bathrooms, upgrade to 200 amp electri box. rewire home, office/bedroom converted to full bedroom at lower level | $49,000 |
| Mar 9, 2021 | Completed final sign-off Nov 2021 | 477 Hazelwood Av | remodel of 3 bathrooms in kind. upgrade to 200 amp electric box. rewire house.Details
remodel of 3 bathrooms in kind. upgrade to 200 amp electric box. rewire house. | $49,000 |
| Mar 4, 2021 | Never finaled issued Mar 2021, no final | 106 Country Club Dr | kitchen remodel, 2 bathrooms remodel, rewire house and upgrade electrical box to 200 ampDetails
kitchen remodel, 2 bathrooms remodel, rewire house and upgrade electrical box to 200 amp | $49,000 |
| Jan 4, 2021 | Completed final sign-off Sep 2021 | 555 14th Av | kitchen & bathroom remodel, change 4 street facing windows, same location/sizeDetails
kitchen & bathroom remodel, change 4 street facing windows, same location/size | $34,000 |
| Jan 4, 2021 | Never finaled issued Jan 2021, no final | 2411 Octavia St | unit 5: bathroom remodel, gfci upgrade, change vanity, upgrade shower; unit 6: bathroom remodel; unit 7: kitchen & bathroom remodelDetails
unit 5: bathroom remodel, gfci upgrade, change vanity, upgrade shower; unit 6: bathroom remodel; unit 7: kitchen & bathroom remodel | $70,000 |
| Oct 7, 2020 | Completed final sign-off Aug 2021 | 30 Junior Tr | adding existing patio (surrounded with exterior walls) to the kitchen area (48 sf). kitchen remodel, (e) bathroom remodel at 2nd fl. add 3 new skylights.Details
adding existing patio (surrounded with exterior walls) to the kitchen area (48 sf). kitchen remodel, (e) bathroom remodel at 2nd fl. add 3 new skylights. | $30,000 |
| Aug 15, 2020 | Completed final sign-off Aug 2021 | 30 Junior Tr | bathroom (~100 sqft) remodel in kind, replace 1 shower, 1 sink, 1 toilet. no structural changes, including meps, fixtures to remain in same locationDetails
bathroom (~100 sqft) remodel in kind, replace 1 shower, 1 sink, 1 toilet. no structural changes, including meps, fixtures to remain in same location | $7,000 |
| Mar 9, 2020 | Never finaled issued Jun 2020, no final | 664 27th Av | add bath on 2nd fl by converting (e) closet.Details
add bath on 2nd fl by converting (e) closet. | $12,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 50 Midcrest Wy | remodel kitchen, counter top. update electrical and plumbing.Details
remodel kitchen, counter top. update electrical and plumbing. | $24,000 |
| Aug 28, 2019 | Never finaled issued Aug 2019, no final | 2225 23rd St | unit # 209: bathroom remodel in kind.Details
unit # 209: bathroom remodel in kind. | $9,000 |
| Jul 18, 2019 | Never finaled issued Aug 2019, no final | 33 Chenery St | remodel kitchen and remove small section of e wallDetails
remodel kitchen and remove small section of e wall | $12,000 |