Golden Grove Roofing And Construction
- Based in
- Walnut Creek
- On San Francisco permits
- Jan 2026 to Aug 2026
- Last 24 months
- 10 permits filed
10 permits since 2000: 6 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 129 Collins St | adding two new skylights and bathroom remodel like for like, no structural changes to layout. replace light, fan, toilet, vanity, shower to shower. all in same location of bathroom. update mep to code.Details
adding two new skylights and bathroom remodel like for like, no structural changes to layout. replace light, fan, toilet, vanity, shower to shower. all in same location of bathroom. update mep to code. | $5,250 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 129 Collins St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $25,850 |
| Jun 5, 2026 | Completed final sign-off Jun 2026 | 1474 24th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $5,850 |
| May 16, 2026 | Expired or cancelled cancelled May 2026 | 785 Andover St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,330 |
| May 11, 2026 | Completed final sign-off May 2026 | 283 Parker Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,950 |
| May 11, 2026 | Completed final sign-off May 2026 | 369 Lisbon St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,527 |
| Apr 29, 2026 | Completed final sign-off May 2026 | 2533 Folsom St | reroofing at flat roof. torch down. no work to (e) sloped roofs. no work to (e) roof structural sheathing.Details
reroofing at flat roof. torch down. no work to (e) sloped roofs. no work to (e) roof structural sheathing. | $4,500 |
| Apr 1, 2026 | In progress issued Apr 2026 | 2864 Folsom St | flat roof repair partial, plywood, downspout replacement. active leak roof repair with torch down.Details
flat roof repair partial, plywood, downspout replacement. active leak roof repair with torch down. | $5,249 |
| Feb 17, 2026 | In progress issued Feb 2026 | 1468 Jackson St | reroofing, complete repair w/ torch downDetails
reroofing, complete repair w/ torch down | $9,750 |
| Jan 6, 2026 | Completed final sign-off Jan 2026 | 2322 Leavenworth St | reroofing: flat roof replacement like to like modified bitumen torch down full roof replacement.Details
reroofing: flat roof replacement like to like modified bitumen torch down full roof replacement. | $11,500 |