Golden Coast Enterprise
- Based in
- San Francisco
- On San Francisco permits
- Feb 2018 to Jan 2020
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 22, 2020 | Completed final sign-off Mar 2020 | 158 Hamerton Av | remodel (e) residential master bathroom, replace 1 bathroom window in kind, located back exterior wall of house, replace (e) toilet and vanity at same location reconfigure standing shower walls with in bathroom, new vanity and ceilng, lights outlets and switchesDetails
remodel (e) residential master bathroom, replace 1 bathroom window in kind, located back exterior wall of house, replace (e) toilet and vanity at same location reconfigure standing shower walls with in bathroom, new vanity and ceilng, lights outlets and switches | $28,500 |
| Mar 19, 2018 | Completed final sign-off Mar 2018 | 1890 30th Av | install vent duct to existing dryer in garage to comply with nov# 201845421 item #1. duct to terminate 3' from property line and any opening. duct installed per manufacturer specs.Details
install vent duct to existing dryer in garage to comply with nov# 201845421 item #1. duct to terminate 3' from property line and any opening. duct installed per manufacturer specs. | $1,650 |
| Feb 28, 2018 | Completed final sign-off Apr 2018 | 1890 30th Av | bathroom remodel - replacing shower tile (only). sheetrock and cement board replaced as well. plumbing fixtures (existing) to remain. touch up paint.Details
bathroom remodel - replacing shower tile (only). sheetrock and cement board replaced as well. plumbing fixtures (existing) to remain. touch up paint. | $7,500 |