Goffo Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Feb 2020
- Last 24 months
- 0 permits filed
241 permits since 2000: 225 completed, 9 never finaled, 7 expired or cancelled.
Of the 9 never-finaled permits, 1 is 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 241.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2020 | Completed final sign-off Jun 2020 | 623 Myra Wy | remove & replace dry rot, partial frame, plywood substratae & concrete patio floor at (e) sunporchDetails
remove & replace dry rot, partial frame, plywood substratae & concrete patio floor at (e) sunporch | $15,000 |
| May 22, 2019 | Completed final sign-off Jul 2019 | 847 Castro St | cosmetic remodel of (e) bathroom, fixts same location.Details
cosmetic remodel of (e) bathroom, fixts same location. | $18,000 |
| May 13, 2019 | Completed final sign-off Jun 2019 | 514 Molimo Dr | cosmetic remodel of existing kitchen with new cabinets, counter,and appliances in same location. no structural work. no change in layouts.Details
cosmetic remodel of existing kitchen with new cabinets, counter,and appliances in same location. no structural work. no change in layouts. | $18,000 |
| Apr 17, 2019 | Completed final sign-off Jun 2019 | 514 Molimo Dr | remove & replace (2) front facing aluminum windows w/marvin aluminum clad wd and 5 @ rear of building with milgard vinyl windows.Details
remove & replace (2) front facing aluminum windows w/marvin aluminum clad wd and 5 @ rear of building with milgard vinyl windows. | $15,000 |
| Jan 28, 2019 | Completed final sign-off Jun 2019 | 742 Hayes St | bathroom cosmetic remodel, (e) bathroom w/new tiles, fixturesDetails
bathroom cosmetic remodel, (e) bathroom w/new tiles, fixtures | $20,000 |
| Oct 29, 2018 | Completed final sign-off May 2019 | 3027 Sacramento St | cosmetic remodel of e kitchen. no structural work to be doneDetails
cosmetic remodel of e kitchen. no structural work to be done | $21,365 |
| Aug 29, 2018 | Completed final sign-off Oct 2018 | 1618 21st Av | cosmetic remode of (e) kitchen . no wall removal or structural workDetails
cosmetic remode of (e) kitchen . no wall removal or structural work | $18,000 |
| Aug 27, 2018 | Completed final sign-off Nov 2018 | 1451 18th Av | cosmetic remodel of (e) kitchen (nonstructural work) & (e) (1) bathroom at upper unit (no structural work); everything in same location, no moving of doors or walls.Details
cosmetic remodel of (e) kitchen (nonstructural work) & (e) (1) bathroom at upper unit (no structural work); everything in same location, no moving of doors or walls. | $30,000 |
| Mar 30, 2018 | Completed final sign-off Jun 2018 | 572 47th Av | cosmetic bathroom update. no structura changes.Details
cosmetic bathroom update. no structura changes. | $18,000 |
| Mar 30, 2018 | Completed final sign-off Jun 2018 | 74 Beaver St | remove and replace six front of house windows with six new aluminum clad windows. retrofit inserts into existing openings. marvin double-hung "ultimate insert" model with og lugs. u factor max. .32Details
remove and replace six front of house windows with six new aluminum clad windows. retrofit inserts into existing openings. marvin double-hung "ultimate insert" model with og lugs. u factor max. .32 | $10,000 |
| Mar 27, 2018 | Completed final sign-off Jul 2018 | 74 Beaver St | voluntary structural strengthening: (m) shearwalls w/footings, steel beam with post removal.Details
voluntary structural strengthening: (m) shearwalls w/footings, steel beam with post removal. | $32,000 |
| Nov 27, 2017 | Completed final sign-off Feb 2018 | 142 Burnside Av | cosmetic remodel (e) bathroom w/new tile fixtures, no change on walls.Details
cosmetic remodel (e) bathroom w/new tile fixtures, no change on walls. | $15,000 |
| Oct 16, 2017 | Completed final sign-off Jan 2018 | 555 Alvarado St | replace 240 sq of e roof materialDetails
replace 240 sq of e roof material | $7,000 |
| Oct 16, 2017 | Completed final sign-off Jan 2018 | 82 Stanton St | cosmetic remodel of (e) bathroom w/new tile & fixturesDetails
cosmetic remodel of (e) bathroom w/new tile & fixtures | $18,000 |
| Oct 10, 2017 | Completed final sign-off Mar 2018 | 2230 Mason St | cosmetic bathroom remodel, no structural changes, change tile, vanity, fixtures only. maher ord 155-13 naDetails
cosmetic bathroom remodel, no structural changes, change tile, vanity, fixtures only. maher ord 155-13 na | $20,000 |
| Sep 7, 2017 | Completed final sign-off Mar 2018 | 715 Shrader St | cosmetic remodel of kitchen w/ cabinets, counters & tiles. no structural changes.Details
cosmetic remodel of kitchen w/ cabinets, counters & tiles. no structural changes. | $20,000 |
| Aug 30, 2017 | Completed final sign-off Dec 2017 | 1600 16th Av | cosmetic remodel of (e) bathroom w/tile & fixtures no structural workDetails
cosmetic remodel of (e) bathroom w/tile & fixtures no structural work | $15,000 |
| Jul 7, 2017 | Completed final sign-off Sep 2017 | 587 Diamond St | cosmetic remodel of (e) upstairs bathroom tile and (n) fixtures. no walls moved, removed, added or infileld. all existing layouts to remain unchanged.Details
cosmetic remodel of (e) upstairs bathroom tile and (n) fixtures. no walls moved, removed, added or infileld. all existing layouts to remain unchanged. | $12,000 |
| Jul 5, 2017 | Completed final sign-off Jul 2017 | 4262 23rd St | repair front stair with new framing, struicger, treads in like-kind. remove concrete bottom slab (cracked) and repour same. less than 50% repair.Details
repair front stair with new framing, struicger, treads in like-kind. remove concrete bottom slab (cracked) and repour same. less than 50% repair. | $4,000 |
| Jul 5, 2017 | Completed final sign-off Mar 2018 | 1564 36th Av | replace (e) damaged brick fireplace with (n) fire box (non wood burning) ceramic log lighterDetails
replace (e) damaged brick fireplace with (n) fire box (non wood burning) ceramic log lighter | $8,500 |
| Jun 20, 2017 | Completed final sign-off Mar 2018 | 1564 36th Av | remodel (e) bathroom w/ new tile & fixtures in same location. no structural change.Details
remodel (e) bathroom w/ new tile & fixtures in same location. no structural change. | $15,000 |
| Jun 8, 2017 | Completed final sign-off Sep 2017 | 4262 23rd St | cosmetic remodel of 2 (e) bathroom w/fixtures & tile at same locations. no structural work.Details
cosmetic remodel of 2 (e) bathroom w/fixtures & tile at same locations. no structural work. | $18,000 |
| Jun 6, 2017 | Completed final sign-off Mar 2018 | 1564 36th Av | cosmetic remodel of kitchen & bathroom with new tile & fixtures to same location. no structural wall changes.Details
cosmetic remodel of kitchen & bathroom with new tile & fixtures to same location. no structural wall changes. | $30,000 |
| May 17, 2017 | Never finaled issued May 2017, no final | 409 Tehama St | cosmetic remodel of (e) bathroom. n/a for maher.Details
cosmetic remodel of (e) bathroom. n/a for maher. | $15,000 |
| Apr 28, 2017 | Completed final sign-off Apr 2021 | 2119 24th St | residential interoir remodel. no change to envelope. convert e storage/basement to bedroom with full bath. sitting rm with laundry sink. structural work includes new beam posts and foundationDetails
residential interoir remodel. no change to envelope. convert e storage/basement to bedroom with full bath. sitting rm with laundry sink. structural work includes new beam posts and foundation | $100,000 |
| Apr 26, 2017 | Completed final sign-off Jun 2017 | 1776 Sacramento St | cosmetic remodel of (e) master bath and guest bath with new tile & paint, (n) kitchen counter & sink only, no structural work, same configuration.Details
cosmetic remodel of (e) master bath and guest bath with new tile & paint, (n) kitchen counter & sink only, no structural work, same configuration. | $20,000 |
| Mar 31, 2017 | Completed final sign-off Jun 2017 | 744 Hayes St | cosmetic remodel of (e) kitchen. no wall removal or relocation maher naDetails
cosmetic remodel of (e) kitchen. no wall removal or relocation maher na | $18,000 |
| Mar 31, 2017 | Completed final sign-off May 2017 | 220 Surrey St | replace existing window with marvin wood clad aluminum in existing opening. no other work.Details
replace existing window with marvin wood clad aluminum in existing opening. no other work. | $3,000 |
| Mar 10, 2017 | Completed final sign-off May 2017 | 220 Surrey St | dry rot stucco repair at front of building.Details
dry rot stucco repair at front of building. | $2,000 |
| Mar 3, 2017 | Completed final sign-off Jun 2017 | 574 Prentiss St | repair dryrot in (e) exterior wall on side of building, not seen from street.Details
repair dryrot in (e) exterior wall on side of building, not seen from street. | $3,000 |
| Nov 28, 2016 | Completed final sign-off Jan 2017 | 576 28th St | cosmetic remodel of (e) bathroom with (n) fixtures, tile and paint.Details
cosmetic remodel of (e) bathroom with (n) fixtures, tile and paint. | $18,000 |
| Sep 15, 2016 | Completed final sign-off Nov 2016 | 966 Somerset St | repair of minor fire damage & dry rot work in both rear back porches (n) drywall flooring.Details
repair of minor fire damage & dry rot work in both rear back porches (n) drywall flooring. | $20,000 |
| Jun 28, 2016 | Completed final sign-off Aug 2016 | 23 Henry St | sheetrock, insulate & outlets & lights in (e)storage area on g/f. work on pa#200306167166 reference permit.Details
sheetrock, insulate & outlets & lights in (e)storage area on g/f. work on pa#200306167166 reference permit. | $10,000 |
| Jun 1, 2016 | Completed final sign-off Nov 2016 | 284 Day St | replace 4 front windows with marvin ultimate aluminum-clad wood windows - double-hung covered by transom at top, in-kindDetails
replace 4 front windows with marvin ultimate aluminum-clad wood windows - double-hung covered by transom at top, in-kind | $6,000 |
| May 23, 2016 | Completed final sign-off May 2016 | 23 Henry St | administrative permit to correct proper address on permit app# 200306167166, actual address & block & lot should read as 23 henry st ,3541/093Details
administrative permit to correct proper address on permit app# 200306167166, actual address & block & lot should read as 23 henry st ,3541/093 | |
| Feb 4, 2016 | Completed final sign-off Nov 2016 | 284 Day St | interior remodel, 1st floor: interior remodel of (e) unconditioned areas into habitable/conditioned legal spaces & rooms; 2nd floor: interior remodel of entire (e) floor. structural, mechanical, plumbing & electrical work related to interior remodel.Details
interior remodel, 1st floor: interior remodel of (e) unconditioned areas into habitable/conditioned legal spaces & rooms; 2nd floor: interior remodel of entire (e) floor. structural, mechanical, plumbing & electrical work related to interior remodel. | $85,000 |
| Feb 1, 2016 | Completed final sign-off Jun 2016 | 1502 Sanchez St | cosmetic remodel of one (e) kitchen and one (e) bathroom w/ (n) cabinets, counters, tile floors and shower walls.Details
cosmetic remodel of one (e) kitchen and one (e) bathroom w/ (n) cabinets, counters, tile floors and shower walls. | $30,000 |
| Feb 1, 2016 | Completed final sign-off May 2016 | 1568 36th Av | replace 5 (e) windows w/ marvin retrofit windows(wood). in-kind at back of house. not visible from street.Details
replace 5 (e) windows w/ marvin retrofit windows(wood). in-kind at back of house. not visible from street. | $4,000 |
| Jan 19, 2016 | Completed final sign-off May 2016 | 1568 36th Av | cosmetic remodel of lower level bathroom with (n) tile, plumbing & fixtures in same locations.Details
cosmetic remodel of lower level bathroom with (n) tile, plumbing & fixtures in same locations. | $17,000 |
| Jan 5, 2016 | Completed final sign-off Nov 2016 | 284 Day St | voluntary seismic upgrade per asce7. foundatin replacement, new shwear wall and hardy frame panels at 2 levels. collectors and blocking volun. no change on floor layout.Details
voluntary seismic upgrade per asce7. foundatin replacement, new shwear wall and hardy frame panels at 2 levels. collectors and blocking volun. no change on floor layout. | $48,000 |
| Nov 12, 2015 | Completed final sign-off Feb 2016 | 225 Excelsior Av | cosmetic remodel of (e) kitchen w/ (n) cabinets, counters, tile & paint (same house kitchen). lighting & control per cec 150 (k).Details
cosmetic remodel of (e) kitchen w/ (n) cabinets, counters, tile & paint (same house kitchen). lighting & control per cec 150 (k). | $20,000 |
| Nov 4, 2015 | Completed final sign-off Mar 2017 | 4010 25th St | horizontal addition @ rear of 3rd fl over 2nd fl roof area to add a (n) bathroom.Details
horizontal addition @ rear of 3rd fl over 2nd fl roof area to add a (n) bathroom. | $75,000 |
| Oct 2, 2015 | Completed final sign-off Dec 2015 | 554 Bella Vista Wy | cosmetic remodel of (e) kitchen with (n) cabinets, counters & flooring, no walls to be moved and no structural work.Details
cosmetic remodel of (e) kitchen with (n) cabinets, counters & flooring, no walls to be moved and no structural work. | $17,000 |
| Sep 30, 2015 | Completed final sign-off Dec 2015 | 679 14th Av | cosmetic remodel of (e) kitchen w/ new cabinets, counters, tiletd floor & paint. no change on walls.Details
cosmetic remodel of (e) kitchen w/ new cabinets, counters, tiletd floor & paint. no change on walls. | $17,000 |
| Sep 29, 2015 | Completed final sign-off Feb 2016 | 225 Excelsior Av | new steel beams to replace (e) beams in garage/storage areaDetails
new steel beams to replace (e) beams in garage/storage area | $2,500 |
| Sep 14, 2015 | Completed final sign-off Nov 2015 | 80 Pinehurst Wy | 1st floor -cosmetic bathroom remodel. new tiel, fixtures, lights, vanity fan. no change structurallyDetails
1st floor -cosmetic bathroom remodel. new tiel, fixtures, lights, vanity fan. no change structurally | $18,000 |
| May 27, 2015 | Completed final sign-off Sep 2015 | 919 Vermont St | remodel extg basement storage area into 2 bedrooms and 2 closets extg ceiling is 8'-4" high, new ceilling is 8'-1" high. install 5/8 firetype & drywall at all areas. all work is within extg footprint of house.Details
remodel extg basement storage area into 2 bedrooms and 2 closets extg ceiling is 8'-4" high, new ceilling is 8'-1" high. install 5/8 firetype & drywall at all areas. all work is within extg footprint of house. | $20,000 |
| May 12, 2015 | Completed final sign-off Oct 2015 | 51 Prospect Av | remove & replace damaged (dry rot) siding on north side of house - like for like (wood). no structural work. repair/replace in kind - not visible from streetDetails
remove & replace damaged (dry rot) siding on north side of house - like for like (wood). no structural work. repair/replace in kind - not visible from street | $7,000 |
| May 6, 2015 | Completed final sign-off Dec 2015 | 149 Henry St | foundation replacement. one middle column removal on ground level. bathroom addition and lateral strengthening of ground level.Details
foundation replacement. one middle column removal on ground level. bathroom addition and lateral strengthening of ground level. | $35,000 |
| Apr 8, 2015 | Completed final sign-off Jun 2015 | 665 Myra Wy | cosmetic remodel of (e) kitchen w/ (n) cabinets, counters & floor tile. no wall modification. no structural.Details
cosmetic remodel of (e) kitchen w/ (n) cabinets, counters & floor tile. no wall modification. no structural. | $20,000 |
| Jan 28, 2015 | Completed final sign-off Dec 2015 | 149 Henry St | adding in-law unit per weiner legislation, with in 1/4 mile of castro commercial zone. in-law unit to have new kitchen an bathroom.Details
adding in-law unit per weiner legislation, with in 1/4 mile of castro commercial zone. in-law unit to have new kitchen an bathroom. | $48,000 |
| Jan 22, 2015 | Completed final sign-off Mar 2015 | 417 Linden St | cosmetic remodel of 2 (e) bathrooms w/ new tile, vanities & fixtures.Details
cosmetic remodel of 2 (e) bathrooms w/ new tile, vanities & fixtures. | $17,000 |
| Jan 8, 2015 | Completed final sign-off Jan 2015 | 2209 25th St | ground level beam strenghtening and related foundation pads to address nov #200235803 and complaint #200342416. this app does not address nov #201161570 and 201404641Details
ground level beam strenghtening and related foundation pads to address nov #200235803 and complaint #200342416. this app does not address nov #201161570 and 201404641 | $8,000 |
| Nov 17, 2014 | Completed final sign-off Jan 2015 | 2209 25th St | to obtain final inspection for work approved under pa#2003-0409-1846. all work is complete.Details
to obtain final inspection for work approved under pa#2003-0409-1846. all work is complete. | |
| Nov 17, 2014 | Completed final sign-off Jan 2015 | 2209 25th St | to obtain final inspection for work approved under pa#200304091846. all work is complete.Details
to obtain final inspection for work approved under pa#200304091846. all work is complete. | |
| Oct 24, 2014 | Completed final sign-off Oct 2014 | 133 Saturn St | minor dry rot rear (e) deck/stair repair (less than 50%), repair in kind.Details
minor dry rot rear (e) deck/stair repair (less than 50%), repair in kind. | $4,000 |
| Oct 23, 2014 | Completed final sign-off Oct 2014 | 145 Kensington Wy | revision to 201404022266. rear deck as built conditionDetails
revision to 201404022266. rear deck as built condition | $1,000 |
| Oct 15, 2014 | Completed final sign-off Jan 2015 | 66 Fountain St | cosmetic remodel of (e) kitchen and bathroom with (n) cabinets & tile at upper unit. no change in layout. lighting to comply with cec 150(k)Details
cosmetic remodel of (e) kitchen and bathroom with (n) cabinets & tile at upper unit. no change in layout. lighting to comply with cec 150(k) | $30,000 |
| Oct 7, 2014 | Completed final sign-off Oct 2014 | 28 Abbey St | to comply with physical inspection report #cc-7732Details
to comply with physical inspection report #cc-7732 | $6,000 |
| Sep 30, 2014 | Completed final sign-off Nov 2014 | 2419 18th St | cosmetic bathroom remodel w/new fixtures & tile.Details
cosmetic bathroom remodel w/new fixtures & tile. | $12,000 |
| Aug 25, 2014 | Completed final sign-off Sep 2014 | 182 Stillings Av | repair of extg deck and stairs (50 % less than repair work scope) at rear of house.Details
repair of extg deck and stairs (50 % less than repair work scope) at rear of house. | $8,500 |
| Jul 18, 2014 | Completed final sign-off Sep 2014 | 3888 22nd St | cosmetic remodel of (e) bathroom with new fixtures to same locations. new tile.Details
cosmetic remodel of (e) bathroom with new fixtures to same locations. new tile. | $15,000 |
| Jul 18, 2014 | Completed final sign-off Sep 2014 | 3888 22nd St | upgrade electrical wiring, install insulation, replace (e) window/same size & location u=0.32 max, refinish the floor, replace (e) door-same size/location install led canister lightingDetails
upgrade electrical wiring, install insulation, replace (e) window/same size & location u=0.32 max, refinish the floor, replace (e) door-same size/location install led canister lighting | $14,125 |
| Jul 9, 2014 | Completed final sign-off Aug 2014 | 19 Dorland St | to obtain final inspection for work approved under pa# 200710125313. all work is complete.Details
to obtain final inspection for work approved under pa# 200710125313. all work is complete. | |
| Jul 9, 2014 | Completed final sign-off Sep 2014 | 15 Dorland St | to obtain final inspection for work approved under pa# 200801293478. all work is complete.Details
to obtain final inspection for work approved under pa# 200801293478. all work is complete. | |
| Jul 9, 2014 | Completed final sign-off Sep 2014 | 15 Dorland St | to obtain final inspection for work approved under pa# 200802285835. all work is complete.Details
to obtain final inspection for work approved under pa# 200802285835. all work is complete. | |
| Jul 7, 2014 | Completed final sign-off Sep 2014 | 15 Dorland St | comply with physical inspection report #cc7585Details
comply with physical inspection report #cc7585 | $10,000 |
| Jun 12, 2014 | Completed final sign-off Aug 2014 | 463 17th Av | cosmetic remodel of (e) bathroom with new tub, tile, vanity, & toiletDetails
cosmetic remodel of (e) bathroom with new tub, tile, vanity, & toilet | $13,000 |
| May 8, 2014 | Completed final sign-off Oct 2014 | 145 Kensington Wy | convert (e) unconditioned 1st floor to a den, bedroom&bathroom, w/new ext. doors. convert unconditioned 2nd flr to a family room, bedroom,& bath, relocate laundry, add 2 new windows to rear, no change in building footprint. remove kensington way curb cut (parking in rear only)Details
convert (e) unconditioned 1st floor to a den, bedroom&bathroom, w/new ext. doors. convert unconditioned 2nd flr to a family room, bedroom,& bath, relocate laundry, add 2 new windows to rear, no change in building footprint. remove kensington way curb cut (parking in rear only) | $45,000 |
| Apr 3, 2014 | Completed final sign-off Jun 2014 | 3348 Market St | cosmetic remodel of (e) kitchen (n) cabinets counters.Details
cosmetic remodel of (e) kitchen (n) cabinets counters. | $20,000 |
| Apr 2, 2014 | Completed final sign-off Oct 2014 | 145 Kensington Wy | interior framing alterations and foundation design to bottom storage base level. basem level lateral strengthening. rear deck replacement (less than 30" from grade)Details
interior framing alterations and foundation design to bottom storage base level. basem level lateral strengthening. rear deck replacement (less than 30" from grade) | $40,000 |
| Mar 13, 2014 | Completed final sign-off May 2014 | 572 47th Av | installation of a new 3'x3' skylight in kitchen area.Details
installation of a new 3'x3' skylight in kitchen area. | $1,500 |
| Mar 3, 2014 | Completed final sign-off Apr 2014 | 255 Jersey St | replace (e) shower stall tile walls, (n) shower pan/valveDetails
replace (e) shower stall tile walls, (n) shower pan/valve | $8,000 |
| Feb 4, 2014 | Completed final sign-off Mar 2014 | 1635 Waller St | cosmetic bathroom and water closet room with (n) tile, vanity, counter and toiletDetails
cosmetic bathroom and water closet room with (n) tile, vanity, counter and toilet | $12,000 |
| Jan 10, 2014 | Completed final sign-off Mar 2014 | 725 Detroit St | cosmetic kitchen remodel with new cabinets, counters & lights. lighting shall comply with t-24Details
cosmetic kitchen remodel with new cabinets, counters & lights. lighting shall comply with t-24 | $18,000 |
| Jan 10, 2014 | Completed final sign-off May 2014 | 572 47th Av | cosmetic remodel of existing kitchen with new cabinets, counters & lights. lighting shall comply with t-24Details
cosmetic remodel of existing kitchen with new cabinets, counters & lights. lighting shall comply with t-24 | $18,000 |
| Jan 6, 2014 | Completed final sign-off Feb 2014 | 149 Henry St | cosmetic remodel of (e) bathroom with (n) fixtures, vanity, tile and paint, no walls moved or removed, layout to stay the sameDetails
cosmetic remodel of (e) bathroom with (n) fixtures, vanity, tile and paint, no walls moved or removed, layout to stay the same | $15,000 |
| Nov 4, 2013 | Completed final sign-off Dec 2013 | 62 Sanchez St | cosmetic remodel of (e) bathroom with (n) tub, tile & vanity. this permit is for 2nd (e) bathroom on this floor only.Details
cosmetic remodel of (e) bathroom with (n) tub, tile & vanity. this permit is for 2nd (e) bathroom on this floor only. | $8,000 |
| Oct 7, 2013 | Completed final sign-off Nov 2013 | 1800 Turk St | cosmetic remodel of extg kitchen in unit #402. new cabinets, counters, and tiled floor(approx 80 sq ft)Details
cosmetic remodel of extg kitchen in unit #402. new cabinets, counters, and tiled floor(approx 80 sq ft) | $20,000 |
| Oct 1, 2013 | Completed final sign-off Dec 2013 | 62 Sanchez St | cosmetic remodel of e bathroom with new tile and fixturesDetails
cosmetic remodel of e bathroom with new tile and fixtures | $10,000 |
| Aug 21, 2013 | Completed final sign-off Oct 2013 | 485 Ulloa St | to obtain final inspetion for work approved under pa#200709263756. all work is complete.Details
to obtain final inspetion for work approved under pa#200709263756. all work is complete. | $3,000 |
| Aug 12, 2013 | Completed final sign-off Oct 2013 | 485 Ulloa St | cosmetic remodel of extg kitchen with new cabinets and countertops.Details
cosmetic remodel of extg kitchen with new cabinets and countertops. | $20,000 |
| Jun 19, 2013 | Completed final sign-off Jul 2013 | 4096 17th St | repair for shower/ tub tile enclosure with new tile only. no plmg or electrical work.Details
repair for shower/ tub tile enclosure with new tile only. no plmg or electrical work. | $4,000 |
| Jun 17, 2013 | Completed final sign-off Aug 2013 | 731 Douglass St | cosmetic kitchen remodel with new cabinets, counters and tileDetails
cosmetic kitchen remodel with new cabinets, counters and tile | $20,000 |
| Jun 4, 2013 | Completed final sign-off Jul 2013 | 136 Arlington St | cosmetic remodel of (e) bathroom, new tub, tile, vanity & sink.Details
cosmetic remodel of (e) bathroom, new tub, tile, vanity & sink. | $12,000 |
| Feb 28, 2013 | Completed final sign-off Apr 2013 | 145 Kensington Wy | replace 11 existing windows with retrofit marvin + milgardt window units in rear of bldg ( not visible from street) max u-factor 0.4Details
replace 11 existing windows with retrofit marvin + milgardt window units in rear of bldg ( not visible from street) max u-factor 0.4 | $10,000 |
| Nov 29, 2012 | Completed final sign-off Apr 2013 | 227 Chattanooga St | expand living room into front bedroom. develope new bath in remainder of front bed room. develope new kitchen/dining in extg kitchen/laundry/bath.Details
expand living room into front bedroom. develope new bath in remainder of front bed room. develope new kitchen/dining in extg kitchen/laundry/bath. | $150,000 |
| Oct 3, 2012 | Completed final sign-off Dec 2012 | 126 Miraloma Dr | remove damaged concrete 4'x8' landing, replace @ planter dry rotted framing, sheathing & repour concrete landing in like kind. this work is in addition to existing pa# 201210021146. note: concrete landing on grade.Details
remove damaged concrete 4'x8' landing, replace @ planter dry rotted framing, sheathing & repour concrete landing in like kind. this work is in addition to existing pa# 201210021146. note: concrete landing on grade. | $2,500 |
| Oct 2, 2012 | Completed final sign-off Dec 2012 | 126 Miraloma Dr | replace (e) about 32 inch tall brick planter and metal railing damaged by car impact, replace in like kindDetails
replace (e) about 32 inch tall brick planter and metal railing damaged by car impact, replace in like kind | $4,000 |
| Sep 17, 2012 | Completed final sign-off Sep 2012 | 165 Henry St | repair minor damage to 3' of garage wood siding& mudsill replace in like kind w/ anchor bolts spacing & size in kindDetails
repair minor damage to 3' of garage wood siding& mudsill replace in like kind w/ anchor bolts spacing & size in kind | $2,000 |
| Aug 2, 2012 | Completed final sign-off Oct 2012 | 565 Corbett Av | garden retaining wall along property line. partial removal of (e) retaining wall & build (n) retaining wall (tie in)Details
garden retaining wall along property line. partial removal of (e) retaining wall & build (n) retaining wall (tie in) | $2,000 |
| Jun 18, 2012 | Completed final sign-off Aug 2012 | 760 03rd Av | cosmetic kitchen remodel with new cabinets, counters and tiled floor. reconnect appliances to same locations.Details
cosmetic kitchen remodel with new cabinets, counters and tiled floor. reconnect appliances to same locations. | $15,000 |
| Jun 14, 2012 | Completed final sign-off Aug 2012 | 2125 24th St | reroofingDetails
reroofing | $8,000 |
| Jun 13, 2012 | Completed final sign-off Aug 2012 | 2125 24th St | cosmetic kitchen remodel with new cabinets, counters & lights.Details
cosmetic kitchen remodel with new cabinets, counters & lights. | $15,000 |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 125 Andover St | replace 4 (e) windows with marvin "tilt-pac" retrofit sashes, wood in like kind.Details
replace 4 (e) windows with marvin "tilt-pac" retrofit sashes, wood in like kind. | $4,000 |
| Mar 6, 2012 | Completed final sign-off Apr 2012 | 4250 23rd St | cosmetic kitchen remodel with new cabinets and counters in same layout. appliances all replaced in same locationDetails
cosmetic kitchen remodel with new cabinets and counters in same layout. appliances all replaced in same location | $16,000 |
| Feb 7, 2012 | Completed final sign-off Apr 2012 | 228 Roosevelt Wy | cosmetic remodel of (e) bathroom with (n) fixtures + tile in same location. hight efficacy lighting or occupancy sensor.Details
cosmetic remodel of (e) bathroom with (n) fixtures + tile in same location. hight efficacy lighting or occupancy sensor. | $15,000 |
| Jan 5, 2012 | Completed final sign-off Jan 2012 | 231 Precita Av | minimal dry rot repair work to (e) rear deck posts, joists and deck boards, all work to be less than 50% of deck.Details
minimal dry rot repair work to (e) rear deck posts, joists and deck boards, all work to be less than 50% of deck. | $3,000 |
| Dec 2, 2011 | Completed final sign-off Jun 2012 | 228 Roosevelt Wy | enclosure of (e) interior 1st flr deck at front of building to enlarge the (e) breakfast room, and replacement of (e) rear window at the 3rd floor w/ new smaller window.Details
enclosure of (e) interior 1st flr deck at front of building to enlarge the (e) breakfast room, and replacement of (e) rear window at the 3rd floor w/ new smaller window. | $40,000 |
| Nov 28, 2011 | Completed final sign-off Dec 2011 | 156 Castenada Av | voluntary stengthening for (e) permeter foundation with 3/4"x12" threaded rod & sihpson 2 part epoxy where acccessible to be installed every 4'.Details
voluntary stengthening for (e) permeter foundation with 3/4"x12" threaded rod & sihpson 2 part epoxy where acccessible to be installed every 4'. | $2,100 |