Global Standard Construction
- Based in
- San Leandro
- On San Francisco permits
- Sep 2009 to Jun 2026
- Last 24 months
- 1 permit filed
20 permits since 2000: 16 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2026 | In progress issued Sep 2026 | 2339 30th Av | 1/f:reconfig layout with 2 new bedrs,1 full bath,(n) family room w/ wetbar.2/f:infill courtyard,lightwell,convert (e) 2 bed into 2 primary suite,int'r staircase to code compliant,kitchen,dining remodel w/ new powder room, new skylight.windows replacement throughout. rear deck access to yrd.Details
1/f:reconfig layout with 2 new bedrs,1 full bath,(n) family room w/ wetbar.2/f:infill courtyard,lightwell,convert (e) 2 bed into 2 primary suite,int'r staircase to code compliant,kitchen,dining remodel w/ new powder room, new skylight.windows replacement throughout. rear deck access to yrd. | $40,000 |
| Aug 11, 2015 | Completed final sign-off Aug 2016 | 659 Banks St | g/f add one & one 1/2 bath, one family & laundry; 2/f add powder room, remodel kitchen & (e) bathroom, 3/f: legalize 2 bedrooms; add 1 full bath, remodel one bath (legalize 3/f area)replace rear & side windows w/(n) vinyl window.(comply with complaints #201279181 & 201520201)Details
g/f add one & one 1/2 bath, one family & laundry; 2/f add powder room, remodel kitchen & (e) bathroom, 3/f: legalize 2 bedrooms; add 1 full bath, remodel one bath (legalize 3/f area)replace rear & side windows w/(n) vinyl window.(comply with complaints #201279181 & 201520201) | $90,000 |
| Jul 9, 2014 | Never finaled issued Sep 2014, no final | 117 De Montfort Av | 1st fl: insfill rear space, add 2 baths, 2 bedrooms, storage and laundry. 2nd fl: infill light well, remodel kitchen, 1 bath, new stair to 1st flDetails
1st fl: insfill rear space, add 2 baths, 2 bedrooms, storage and laundry. 2nd fl: infill light well, remodel kitchen, 1 bath, new stair to 1st fl | $100,000 |
| Jun 23, 2014 | Completed final sign-off Dec 2014 | 60 Corona St | 1)add 2 bedrooms, 3 baths, one family room on 1st floor per plan. 2) add one bath, one office, and walk in closet on 2nd floor per plan. 3)extg bath remodel, extg kitchen. remodel on 2nd floor per plan.Details
1)add 2 bedrooms, 3 baths, one family room on 1st floor per plan. 2) add one bath, one office, and walk in closet on 2nd floor per plan. 3)extg bath remodel, extg kitchen. remodel on 2nd floor per plan. | $80,000 |
| Dec 19, 2013 | Completed final sign-off May 2015 | 3258 Market St | to obtain final inspeciton for work approved under pa #200511037344. all work is complete.Details
to obtain final inspeciton for work approved under pa #200511037344. all work is complete. | |
| Dec 19, 2013 | Completed final sign-off May 2015 | 3258 Market St | to comply with physical inspeciton report application #cc"7308" (building report)Details
to comply with physical inspeciton report application #cc"7308" (building report) | $5,000 |
| Dec 19, 2013 | Completed final sign-off May 2015 | 3258 Market St | to obtain final inspection for work approved under pa #9916294. all work is complete.Details
to obtain final inspection for work approved under pa #9916294. all work is complete. | |
| Nov 20, 2013 | Never finaled issued Nov 2013, no final | 2437 Noriega St | relocate restroom. barrier removal.Details
relocate restroom. barrier removal. | $13,000 |
| Aug 1, 2013 | Completed final sign-off Jul 2014 | 69 Pearl St | voluntary structural strengthening at basement. new shear walls and grade beams at basement per plan. (structural work).Details
voluntary structural strengthening at basement. new shear walls and grade beams at basement per plan. (structural work). | $50,000 |
| Jul 8, 2013 | Completed final sign-off Sep 2014 | 259 Vernon St | interior room addition includes adding a new bedroom, a new family room, and new bathroom at extg ground floor.Details
interior room addition includes adding a new bedroom, a new family room, and new bathroom at extg ground floor. | $8,000 |
| Feb 14, 2013 | Completed final sign-off Nov 2013 | 652 Lakeview Av | comply with nov #201386731. pours the footing adjacent to the exposed foundation to provide a solid lateral support and continue the remaining excavation work, avoid the moisture impact to the finished excavation area. revision to app#200311240936Details
comply with nov #201386731. pours the footing adjacent to the exposed foundation to provide a solid lateral support and continue the remaining excavation work, avoid the moisture impact to the finished excavation area. revision to app#200311240936 | $1,000 |
| Feb 21, 2012 | Completed final sign-off May 2012 | 130 Garfield St | remodel 1st floor: add 2 bedroos, 2 baths, 2 storage rooms and laundry. 2nd floor remodel kitchen and bath, add full bathDetails
remodel 1st floor: add 2 bedroos, 2 baths, 2 storage rooms and laundry. 2nd floor remodel kitchen and bath, add full bath | $50,000 |
| Sep 9, 2011 | Completed final sign-off Sep 2011 | 5364 Mission St | correct n.o.v. #201116242 - repair damage ceiling 4'x8'.Details
correct n.o.v. #201116242 - repair damage ceiling 4'x8'. | $1,000 |
| Aug 3, 2011 | Completed final sign-off Feb 2012 | 608 Clarendon Av | 1.install new closets at 2nd and 3rd fl per plan. 2.remodel one bath on 2nd fl and two baths on 3rd fl. 3.remodel one kitchen on 2nd floor. lighting must comply with cec (150)k.Details
1.install new closets at 2nd and 3rd fl per plan. 2.remodel one bath on 2nd fl and two baths on 3rd fl. 3.remodel one kitchen on 2nd floor. lighting must comply with cec (150)k. | $12,000 |
| Jul 27, 2011 | Completed final sign-off Sep 2011 | 3605 Irving St | comply with nov 201151546; no structural work, no new lighting, remodeling kitchen & bathroom on top floor @ unit #3507Details
comply with nov 201151546; no structural work, no new lighting, remodeling kitchen & bathroom on top floor @ unit #3507 | $11,000 |
| Jun 14, 2011 | Completed final sign-off Mar 2012 | 218 Lisbon St | ground floor living area establishment= a storage, a bedroom, a family room and a full bath, landry. enclose area under existing 2nd floor rear room.Details
ground floor living area establishment= a storage, a bedroom, a family room and a full bath, landry. enclose area under existing 2nd floor rear room. | $15,000 |
| May 9, 2011 | Never finaled issued May 2011, no final | 1826 38th Av | one window (8'x5') on front face on 2/f, replace wood fixed, replace in kind, max u factor 0.40Details
one window (8'x5') on front face on 2/f, replace wood fixed, replace in kind, max u factor 0.40 | $600 |
| Jan 20, 2011 | Completed final sign-off Feb 2011 | 2806 Van Ness Av | comply with nov 201083572. removeDetails
comply with nov 201083572. remove | $2,000 |
| Sep 13, 2010 | Completed final sign-off Oct 2010 | 7815 Geary Bl | installing 3/8x6 hard board at the east side of bldg on top of extg siding and painting. not visible from street. galv 2-10 at 16" area = 800 sq ftDetails
installing 3/8x6 hard board at the east side of bldg on top of extg siding and painting. not visible from street. galv 2-10 at 16" area = 800 sq ft | $8,000 |
| Sep 9, 2009 | Completed final sign-off Jun 2010 | 1270 36th Av | 2nd floor: remove (e) walls @ living & dining. relcoate kitchen & remodel (e) bathrooms. construct a new deck @ rear yard. 1st floor: install new window @ exercise room. new funance at 1st floor.Details
2nd floor: remove (e) walls @ living & dining. relcoate kitchen & remodel (e) bathrooms. construct a new deck @ rear yard. 1st floor: install new window @ exercise room. new funance at 1st floor. | $30,000 |