Glenside Construction
- Based in
- San Mateo
- On San Francisco permits
- Oct 2005 to Oct 2025
- Last 24 months
- 1 permit filed
16 permits since 2000: 15 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 10, 2025 | Completed final sign-off Jan 2026 | 1117 Ocean Av | repair deck in kind less than 50%Details
repair deck in kind less than 50% | $15,000 |
| Aug 5, 2022 | Completed final sign-off Aug 2023 | 968 Page St | adding adu within the unconditioned existing first floor as per ordinace no. 95-17. unit will be added per government code section 65852.2 for the state mandated adu program. the unit will contain living-dining, kitchen, bath and bedroom; will be accessed through the (e) common 2nd fl entrance.Details
adding adu within the unconditioned existing first floor as per ordinace no. 95-17. unit will be added per government code section 65852.2 for the state mandated adu program. the unit will contain living-dining, kitchen, bath and bedroom; will be accessed through the (e) common 2nd fl entrance. | $70,000 |
| May 26, 2022 | Completed final sign-off Aug 2023 | 968 Page St | renovation of unit #2 @ 2nd fl to reconfigure the living,dining,kitchen & bath area,provide new heating @ unit.add new interior common stair to 1st fl & create separate storage & mechanical areas.Details
renovation of unit #2 @ 2nd fl to reconfigure the living,dining,kitchen & bath area,provide new heating @ unit.add new interior common stair to 1st fl & create separate storage & mechanical areas. | $70,000 |
| May 11, 2016 | Completed final sign-off Oct 2016 | 3249 17th St | revision to pa 2010-0324-8891 on space heating systemDetails
revision to pa 2010-0324-8891 on space heating system | |
| May 9, 2016 | Completed final sign-off May 2016 | 867 South Van Ness Av | revision to appl# 2015-1204-4130 on space heating system of 867 south van ness (lower unit).Details
revision to appl# 2015-1204-4130 on space heating system of 867 south van ness (lower unit). | |
| Jan 22, 2016 | Completed final sign-off Oct 2016 | 3249 17th St | revision to 201003248891: new interior 2 hr shaftDetails
revision to 201003248891: new interior 2 hr shaft | $2,000 |
| Dec 4, 2015 | Completed final sign-off May 2016 | 867 South Van Ness Av | repair e foundation at various 1st fl locations. new header beam 1st fl and rear sliding door. new beams at garage ceiling, e 2nd fl kitchen wall to be replaced with beam, e 3rd fl kitchen wall to be replaced with beam. reinforce ceiling rafters 3rd fl rear bedroom ceilingDetails
repair e foundation at various 1st fl locations. new header beam 1st fl and rear sliding door. new beams at garage ceiling, e 2nd fl kitchen wall to be replaced with beam, e 3rd fl kitchen wall to be replaced with beam. reinforce ceiling rafters 3rd fl rear bedroom ceiling | $25,000 |
| Oct 19, 2015 | Completed final sign-off May 2016 | 869 South Van Ness Av | interior remodel of kitchen & bathroom on top floor. no changes to wall or fixture locations.Details
interior remodel of kitchen & bathroom on top floor. no changes to wall or fixture locations. | $60,000 |
| Oct 19, 2015 | Completed final sign-off May 2016 | 867 South Van Ness Av | interior remodel of kitchen 1st floor & bathroom on 1st floor. no changes to wal lor fixture locations.Details
interior remodel of kitchen 1st floor & bathroom on 1st floor. no changes to wal lor fixture locations. | $60,000 |
| Jan 21, 2015 | Never finaled issued Jan 2015, no final | 610 Polk St | interior remodel of #203 and #201. terminate electrical. install general lighting and sheet rock repair. partially comply with n.o.v. #201520281 for rm 201.Details
interior remodel of #203 and #201. terminate electrical. install general lighting and sheet rock repair. partially comply with n.o.v. #201520281 for rm 201. | $3,500 |
| Aug 19, 2014 | Completed final sign-off Sep 2014 | 2276 Greenwich St | revision to pa# 2014-0625-9471: remove roof deck and spirial stairs at 3rd floor, replace (e) rear patio doors in-kind.Details
revision to pa# 2014-0625-9471: remove roof deck and spirial stairs at 3rd floor, replace (e) rear patio doors in-kind. | |
| Jun 25, 2014 | Completed final sign-off Sep 2014 | 2276 Greenwich St | interior remodel: bath remodel @ g/f, new bathroom @3rd flr, kitchen remodel @ 1st and 2nd flr, new spiral stairs and roof deck (for 2276-2278 greenwich st)Details
interior remodel: bath remodel @ g/f, new bathroom @3rd flr, kitchen remodel @ 1st and 2nd flr, new spiral stairs and roof deck (for 2276-2278 greenwich st) | $60,000 |
| May 7, 2014 | Completed final sign-off Sep 2014 | 2276 Greenwich St | dryrot and stucco repair at front of bldg. replace front windows in kind.Details
dryrot and stucco repair at front of bldg. replace front windows in kind. | $12,000 |
| May 2, 2014 | Completed final sign-off Sep 2014 | 2276 Greenwich St | remodel 2 kitchens & 6 bathrooms (2276 & 2278 greenwich st). replace like for like.Details
remodel 2 kitchens & 6 bathrooms (2276 & 2278 greenwich st). replace like for like. | $75,000 |
| Oct 13, 2005 | Completed final sign-off May 2013 | 411 Valencia St | erect a 5-story, sixteen unit residential condo over a garage, and 1370 square feet commercial space.Details
erect a 5-story, sixteen unit residential condo over a garage, and 1370 square feet commercial space. | $1,000,000 |
| Oct 13, 2005 | Completed final sign-off May 2012 | 411 Valencia St | demolisih a 1-story type 1 commercial structureDetails
demolisih a 1-story type 1 commercial structure |