Gilson Development Inc.
- Based in
- Burlingame
- On San Francisco permits
- Dec 2012 to May 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2019 | Never finaled issued May 2019, no final | 422 Green St | non-structural alteration to existing building. remove and replace existing bahtroom and kitchen fixtures, counters and cabinets. install 3 new skylights. remove existing hallway partitions and partition between bedroom and living-dining.Details
non-structural alteration to existing building. remove and replace existing bahtroom and kitchen fixtures, counters and cabinets. install 3 new skylights. remove existing hallway partitions and partition between bedroom and living-dining. | $58,000 |
| Apr 5, 2019 | Completed final sign-off Jun 2019 | 422 Green St | remove and replace e shingle siding, replace with new redwood or cedar t&g siding at south and east elevations. remove and replace e alum vinyl windows with new painted wood windows on south and east sides. replace e front entry doors on south and east sides with new wd and glass doorsDetails
remove and replace e shingle siding, replace with new redwood or cedar t&g siding at south and east elevations. remove and replace e alum vinyl windows with new painted wood windows on south and east sides. replace e front entry doors on south and east sides with new wd and glass doors | $10,000 |
| Sep 10, 2018 | Completed final sign-off Nov 2019 | 2604 Jackson St | replace front windows within existing openings with marvin windows to match existing. aluminum-clad.Details
replace front windows within existing openings with marvin windows to match existing. aluminum-clad. | $70,000 |
| Jul 6, 2018 | Completed final sign-off Nov 2019 | 2604 Jackson St | install new kitchen cabinets, new can lights; new bathroom fixtures, new can lights in 3 rooms.Details
install new kitchen cabinets, new can lights; new bathroom fixtures, new can lights in 3 rooms. | $70,000 |
| Jan 19, 2016 | Completed final sign-off Apr 2017 | 2881 Mission St | revision to to 201212045418. add new escape and rescue courts. convert 2 e unit #4 rooms into bedrooms. convert e 2nd fl breakroom and add to proposed unit #2.Details
revision to to 201212045418. add new escape and rescue courts. convert 2 e unit #4 rooms into bedrooms. convert e 2nd fl breakroom and add to proposed unit #2. | $35,000 |
| Dec 4, 2012 | Completed final sign-off Apr 2017 | 2881 Mission St | in 2nd floor convert extg office into 2 one-bedroom units. change of occupancy from r-3/f-1/b to (4-unit)r-2/f-1/b. new stair new stairway penthouse and new roof deck. demo bedroom on 3rd floor.Details
in 2nd floor convert extg office into 2 one-bedroom units. change of occupancy from r-3/f-1/b to (4-unit)r-2/f-1/b. new stair new stairway penthouse and new roof deck. demo bedroom on 3rd floor. | $50,000 |