Giants Construction
- Based in
- El Cerrito
- On San Francisco permits
- Nov 2007 to Apr 2021
- Last 24 months
- 0 permits filed
44 permits since 2000: 36 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2021 | Completed final sign-off Mar 2022 | 417 32nd Av | to comply with complaint # 202174444, 202174445, 202174447. construct 2 bedrooms, 2 full bathrooms, and a family room. legalize media room. all work at ground floor.Details
to comply with complaint # 202174444, 202174445, 202174447. construct 2 bedrooms, 2 full bathrooms, and a family room. legalize media room. all work at ground floor. | $89,000 |
| Dec 23, 2020 | Completed final sign-off Oct 2021 | 552 Miramar Av | add 1104 new habitable square feet on garage level: construct 2 new bedroom, 1 study rm, 2 bathrooms, & media rm at ground floor. enlarge two windows at driveway, replace with aluminum-clad wood windows.Details
add 1104 new habitable square feet on garage level: construct 2 new bedroom, 1 study rm, 2 bathrooms, & media rm at ground floor. enlarge two windows at driveway, replace with aluminum-clad wood windows. | $96,000 |
| Dec 23, 2020 | Completed final sign-off Jan 2022 | 1475 31st Av | construct new bedroom, media rm, family rm, & 2 bathrooms at ground floor.Details
construct new bedroom, media rm, family rm, & 2 bathrooms at ground floor. | $68,000 |
| Aug 25, 2020 | Completed final sign-off Dec 2021 | 2657 30th Av | construct 2 bedroom, 1 full bathroom & media room at ground floor. remodel (e) kitchen, bathroom. add one full bathroom & replace (e) sheetrock w/ new at 2nd floor.Details
construct 2 bedroom, 1 full bathroom & media room at ground floor. remodel (e) kitchen, bathroom. add one full bathroom & replace (e) sheetrock w/ new at 2nd floor. | $120,000 |
| Jul 14, 2020 | Expired or cancelled expired Jul 2025 | 2071 35th Av | revision to 201909121519. change kitchen and living room layout. change round flr bath layout per planDetails
revision to 201909121519. change kitchen and living room layout. change round flr bath layout per plan | |
| Jun 10, 2020 | Completed final sign-off Jul 2020 | 2234 42nd Av | replace 2 skylights like for likeDetails
replace 2 skylights like for like | $1,500 |
| Dec 12, 2019 | Completed final sign-off Sep 2020 | 4479 Mission St | rehabilitation of commercial space on gr flDetails
rehabilitation of commercial space on gr fl | $100,000 |
| Aug 9, 2019 | Completed final sign-off Oct 2019 | 22 Morrell St | remodel existing kitchen and bathroom in kind. replace counter cabinets and fixtures.Details
remodel existing kitchen and bathroom in kind. replace counter cabinets and fixtures. | $12,000 |
| Feb 21, 2019 | Completed final sign-off Jan 2020 | 1723 09th Av | replace (e) front stair in kindDetails
replace (e) front stair in kind | $8,000 |
| Feb 1, 2019 | Completed final sign-off Jul 2019 | 477 14th St | soft story retrofit per sfebc chapter 45 engineering criteria 2016 cebc appendix a-4. to comply with nov 201813031Details
soft story retrofit per sfebc chapter 45 engineering criteria 2016 cebc appendix a-4. to comply with nov 201813031 | $50,000 |
| Jan 11, 2019 | Completed final sign-off Oct 2019 | 408 Rivera St | remodel (e) kitchen & bathroom and add new bathroom @ 2nd floor; remove (e) interior stair and infill (e) lightwell @ ground floor; relocate (e) front entry door & add new rear deck; 4 skylights @ 2nd floor; 2 new bedrooms, 1 bath & media room to be constructed @ ground floorDetails
remodel (e) kitchen & bathroom and add new bathroom @ 2nd floor; remove (e) interior stair and infill (e) lightwell @ ground floor; relocate (e) front entry door & add new rear deck; 4 skylights @ 2nd floor; 2 new bedrooms, 1 bath & media room to be constructed @ ground floor | $100,000 |
| Dec 19, 2018 | Completed final sign-off Jul 2019 | 640 Victoria St | to obtain a final inspection for work approved under pa#201608235809. all work is complete.Details
to obtain a final inspection for work approved under pa#201608235809. all work is complete. | |
| Oct 31, 2018 | Completed final sign-off Jul 2019 | 2186 29th Av | 1st floor: modify extg spaces to new family, study, new lobby, and entry door. at 2nd floor: remodel extg kitchen, bathroom, bedrooms, infill 2 lightwell and remove stair.Details
1st floor: modify extg spaces to new family, study, new lobby, and entry door. at 2nd floor: remodel extg kitchen, bathroom, bedrooms, infill 2 lightwell and remove stair. | $99,000 |
| Apr 10, 2018 | Completed final sign-off Jan 2020 | 1466 Church St | stair repair, foundation replace outside. legalize back stairs. provide new guard rail and handrail.Details
stair repair, foundation replace outside. legalize back stairs. provide new guard rail and handrail. | $30,000 |
| Mar 26, 2018 | Completed final sign-off Nov 2018 | 2645 Franklin St | remodel existing bathroom all fixtures to remain in same location. unit 2Details
remodel existing bathroom all fixtures to remain in same location. unit 2 | $35,000 |
| Mar 15, 2018 | Completed final sign-off Nov 2019 | 20 Stratford Dr | 1) remodel extg kitchen, remove extg partition wall in dining room, and construct half bath room at main floor. 2)legalize extg bed room and bath room at ground floor.Details
1) remodel extg kitchen, remove extg partition wall in dining room, and construct half bath room at main floor. 2)legalize extg bed room and bath room at ground floor. | $36,000 |
| Mar 5, 2018 | Completed final sign-off Nov 2018 | 1311 29th Av | front bldg - 1st fl - remodel family room, relocate (e) bathroom, remodel (e) storage space to (n) media room, (n) home office and new bathroom, remodel (e) laudry to (n) bedroomDetails
front bldg - 1st fl - remodel family room, relocate (e) bathroom, remodel (e) storage space to (n) media room, (n) home office and new bathroom, remodel (e) laudry to (n) bedroom | $48,000 |
| Nov 28, 2017 | Completed final sign-off Jan 2019 | 3735 Anza St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. to comply with #201717242.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. to comply with #201717242. | $60,000 |
| Nov 8, 2017 | Completed final sign-off Jan 2019 | 1880 Page St | to comply with soft story retrofit requirement per sfebc chapter 4d egineering criteria by other rational design.Details
to comply with soft story retrofit requirement per sfebc chapter 4d egineering criteria by other rational design. | $25,000 |
| Oct 31, 2017 | Expired or cancelled expired Mar 2026 | 1333 Waller St | replace existing brick footings with reinforced concrete footings.Details
replace existing brick footings with reinforced concrete footings. | $10,000 |
| Oct 19, 2017 | Completed final sign-off Nov 2018 | 1837 Hayes St | add 1 full bath, remodel e bath and kitchenDetails
add 1 full bath, remodel e bath and kitchen | $32,000 |
| Oct 5, 2017 | Completed final sign-off Nov 2018 | 1839 Hayes St | add (1) new full bath, remodel (e) kitchen & bath.Details
add (1) new full bath, remodel (e) kitchen & bath. | $23,000 |
| Sep 18, 2017 | Completed final sign-off Jul 2018 | 4130 Geary Bl | construct four (n) bedroom, one (n) bathroom, laundry room, relocate kitchen & living room, rewire electrical all at residential unit. n/a ordinance #155-13. no exterior work visible from streetDetails
construct four (n) bedroom, one (n) bathroom, laundry room, relocate kitchen & living room, rewire electrical all at residential unit. n/a ordinance #155-13. no exterior work visible from street | $55,000 |
| May 24, 2017 | Expired or cancelled revoked Apr 2021 | 1333 Waller St | foundation replacement: voluntary seismic strengthening @ the ground floorDetails
foundation replacement: voluntary seismic strengthening @ the ground floor | $50,000 |
| May 5, 2017 | Completed final sign-off Nov 2017 | 121 Raymond Av | convert (e) rumpus room to 2 bedrooms and 2 full bathrooms. add on additional full bathroom to the (e) rumpus room. remove (e) fire place. all work is on 1st floor onlyDetails
convert (e) rumpus room to 2 bedrooms and 2 full bathrooms. add on additional full bathroom to the (e) rumpus room. remove (e) fire place. all work is on 1st floor only | $55,000 |
| Mar 10, 2017 | Completed final sign-off Apr 2017 | 1346 Quintara St | remove 150 sf of stucco on exterior of building and repair in kind.Details
remove 150 sf of stucco on exterior of building and repair in kind. | $3,000 |
| Feb 22, 2017 | Completed final sign-off Jun 2017 | 306 Parnassus Av | soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. ground level onlyDetails
soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4. ground level only | $40,000 |
| Oct 24, 2016 | Completed final sign-off Jun 2017 | 2420 Moraga St | 1) remodel ground floor to have one bedroom, family room and one full bath. 2)remodel kitchen & 1 full bathroom on 2nd floor. 3)convert extg storage into new 1/2 bathroom on 2nd floor. no visible work from street.Details
1) remodel ground floor to have one bedroom, family room and one full bath. 2)remodel kitchen & 1 full bathroom on 2nd floor. 3)convert extg storage into new 1/2 bathroom on 2nd floor. no visible work from street. | $42,000 |
| Aug 16, 2016 | Completed final sign-off Jan 2020 | 1723 09th Av | horizontal expansion . interior reovation. add a master bedroom & 1 bathroom. a total of 798 sf for both floors.Details
horizontal expansion . interior reovation. add a master bedroom & 1 bathroom. a total of 798 sf for both floors. | $150,000 |
| Aug 1, 2016 | Completed final sign-off Nov 2016 | 4489 Mission St | add carpet, add non bearing wall. reslope entrace to 2% maxDetails
add carpet, add non bearing wall. reslope entrace to 2% max | $2,000 |
| Nov 24, 2015 | Completed final sign-off Jul 2016 | 454 32nd Av | ground floor: remodel to have 2 bedrooms, family room, 2 full bathrooms and storage room. install laundry, gas furnace and water heater in garage. 2nd floor: infill light well. remodel master suite with full bathroom and walkin closet. add 1/2 bath. remodel kitchen w/all new fixtures & finishes.Details
ground floor: remodel to have 2 bedrooms, family room, 2 full bathrooms and storage room. install laundry, gas furnace and water heater in garage. 2nd floor: infill light well. remodel master suite with full bathroom and walkin closet. add 1/2 bath. remodel kitchen w/all new fixtures & finishes. | $82,000 |
| Oct 9, 2015 | Completed final sign-off Nov 2015 | 1824 Rivera St | bathrom remodel and kitchen remodel: replace (e) kitchen cabinets, countertop, and electrical outlets. replace (e) bathroom toilet, bath tub, faucet, sink and tile.Details
bathrom remodel and kitchen remodel: replace (e) kitchen cabinets, countertop, and electrical outlets. replace (e) bathroom toilet, bath tub, faucet, sink and tile. | $20,000 |
| Apr 15, 2015 | Never finaled issued Apr 2015, no final | 586 41st Av | remodel of e unit 586-588 41st ave. 586 41st unit, reconfigure floor layout, removed and relocate e bath, kitchen and bedrooms. 588 41st unit, redonfigure floor layout, convert e living to bedroom. seismic upgrade per 2013 2013 cbc sf amendmentDetails
remodel of e unit 586-588 41st ave. 586 41st unit, reconfigure floor layout, removed and relocate e bath, kitchen and bedrooms. 588 41st unit, redonfigure floor layout, convert e living to bedroom. seismic upgrade per 2013 2013 cbc sf amendment | $48,000 |
| Mar 17, 2015 | Completed final sign-off Jul 2015 | 125 Arleta Av | remodel kitchen and bathroom, add a new bathroom , install 4 new windows on 2/f, add home office, 2 bedrooms and a full bath, add new rear deck with stair on 1/f, replace water heater.Details
remodel kitchen and bathroom, add a new bathroom , install 4 new windows on 2/f, add home office, 2 bedrooms and a full bath, add new rear deck with stair on 1/f, replace water heater. | $70,000 |
| Mar 17, 2015 | Never finaled issued Apr 2015, no final | 1535 15th St | remodel kitchen & bathroom, replace 6 windows @ rear, replace drywall, replace water heater. add closet. all fire rated assemblies to be maintained. window u factor 0.32 or better.Details
remodel kitchen & bathroom, replace 6 windows @ rear, replace drywall, replace water heater. add closet. all fire rated assemblies to be maintained. window u factor 0.32 or better. | $30,000 |
| Jan 12, 2015 | Never finaled issued Jan 2015, no final | 26 Seville St | add family room, 2 bedrooms, office and 2 baths on 1st flDetails
add family room, 2 bedrooms, office and 2 baths on 1st fl | $45,000 |
| Nov 6, 2014 | Never finaled issued Nov 2014, no final | 2756 34th Av | convert guest bath to master bathroom, add new bathroom on 2/f, add family room, laundry room and a full bathroom on 1/f.Details
convert guest bath to master bathroom, add new bathroom on 2/f, add family room, laundry room and a full bathroom on 1/f. | $40,000 |
| Jul 22, 2014 | Never finaled issued Apr 2015, no final | 749 19th Av | apply notice of special restriction to a three story with three units apartment, deed (e) 2/f unit-751 19th ave as non-conforming unit and deed ground unit -749 19th ave and 3/f unit- 753 19th ave as legal conforming units.Details
apply notice of special restriction to a three story with three units apartment, deed (e) 2/f unit-751 19th ave as non-conforming unit and deed ground unit -749 19th ave and 3/f unit- 753 19th ave as legal conforming units. | $100 |
| Jul 9, 2014 | Completed final sign-off Apr 2015 | 526 Silver Av | to complete work and obtain final inspection for work approved under pa# 201106228679.Details
to complete work and obtain final inspection for work approved under pa# 201106228679. | $5,000 |
| Jul 7, 2014 | Completed final sign-off Aug 2014 | 1442 Cabrillo St | replaceing windows, 8 windows are visible from the street. same size, same location.Details
replaceing windows, 8 windows are visible from the street. same size, same location. | $7,000 |
| May 6, 2014 | Completed final sign-off Nov 2014 | 2237 28th Av | remodel existing storage room, new plumbing & electrical work, enlarge (e) bathroom & closet, put up new walls in the garage, turn into entertainment room.Details
remodel existing storage room, new plumbing & electrical work, enlarge (e) bathroom & closet, put up new walls in the garage, turn into entertainment room. | $10,500 |
| Jul 24, 2013 | Completed final sign-off Oct 2015 | 1950 Page St | remodel (e) study room/classroom at 2nd floor (class rooms for 6th-12th grade), remodel (e) game room to dance studio & classroom at 1st floor, elec, mech, plumbing, f/a, fire sprinkler under separate permit.Details
remodel (e) study room/classroom at 2nd floor (class rooms for 6th-12th grade), remodel (e) game room to dance studio & classroom at 1st floor, elec, mech, plumbing, f/a, fire sprinkler under separate permit. | $100,000 |
| Jun 1, 2010 | Completed final sign-off Oct 2010 | 2554 40th Av | reconfigure (e) 1st. flr. (ref: permit#327514-1) convert (e) family room to two bedrooms. relocate (e) bathroom. convert (e) sliding door to windows. relocate one(e) window @ rear. (not visible from street).Details
reconfigure (e) 1st. flr. (ref: permit#327514-1) convert (e) family room to two bedrooms. relocate (e) bathroom. convert (e) sliding door to windows. relocate one(e) window @ rear. (not visible from street). | $30,000 |
| Nov 8, 2007 | Completed final sign-off Mar 2008 | 758 Lakeview Av | add a family rm, play rm and 2 full bathrooms at ground floor. replace (e) facade siding with (n)stucco at 2nd fl. replace all 8 windows in kind on 2nd fl. remove (e) curb cut on jules st.convert (e) second garage for (n) family rmDetails
add a family rm, play rm and 2 full bathrooms at ground floor. replace (e) facade siding with (n)stucco at 2nd fl. replace all 8 windows in kind on 2nd fl. remove (e) curb cut on jules st.convert (e) second garage for (n) family rm | $45,000 |