German & Green Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Dec 2012
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2012 | Completed final sign-off Aug 2014 | 259 Bartlett St | 1. convert (e) 2nd floor roof area within existing parapet wall into private deck. 2. cover existing roof surface (bituminen sheeting) with new composite decking material product moisture shield. 3. add handrail to (e) parapet wall to meet 42 inch guard rail height code requirement.Details
1. convert (e) 2nd floor roof area within existing parapet wall into private deck. 2. cover existing roof surface (bituminen sheeting) with new composite decking material product moisture shield. 3. add handrail to (e) parapet wall to meet 42 inch guard rail height code requirement. | $1,500 |