George Martin Construction
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2007 to Oct 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 22, 2013 | Completed final sign-off Dec 2013 | 711 Eddy St | remove (e) tubs - replace with new tubs, water proof backing, tile to match original. plumber to replace shower valve & waste connections with new 50 total units, including: 1d, 2,d,3d,6d,7d,1e,2e,3e,6e,7e,8e,9e,10 thru 13e. 1h thru 3h, 1j thru 3j, 1a thru 13a, 1f thru 7f, 1g thru 7g, 8t.Details
remove (e) tubs - replace with new tubs, water proof backing, tile to match original. plumber to replace shower valve & waste connections with new 50 total units, including: 1d, 2,d,3d,6d,7d,1e,2e,3e,6e,7e,8e,9e,10 thru 13e. 1h thru 3h, 1j thru 3j, 1a thru 13a, 1f thru 7f, 1g thru 7g, 8t. | $200,000 |
| Oct 8, 2013 | Completed final sign-off Nov 2013 | 711 Eddy St | remove extg tubs, tile at tubs. replace with new tubs water proof backing, tile to match original.plumber to replace shower valve and waste connections with new . 20 total units including 1c,2c,3c,4c,5c,6c,7c. 1b,2b,3b,4b,5b,6b,7b,8b,9b,10b,11b,12b,13bDetails
remove extg tubs, tile at tubs. replace with new tubs water proof backing, tile to match original.plumber to replace shower valve and waste connections with new . 20 total units including 1c,2c,3c,4c,5c,6c,7c. 1b,2b,3b,4b,5b,6b,7b,8b,9b,10b,11b,12b,13b | $134,000 |
| Jan 22, 2007 | Never finaled issued Jan 2007, no final | 200 Lee Av | street space and sidewalk repairDetails
street space and sidewalk repair |