Genesis Residential Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Oct 2024
- Last 24 months
- 1 permit filed
16 permits since 2000: 13 completed, 1 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2024 | Completed final sign-off Jun 2025 | 2721 Union St | unit #2721: remodel of kitchen - demo and replace w/ same - similar.Details
unit #2721: remodel of kitchen - demo and replace w/ same - similar. | $40,000 |
| Sep 24, 2024 | Completed final sign-off Feb 2025 | 62 Sussex St | (e) exterior french door off of masterbedroom. removal and replace (n) matching french doors. remove pavers located at roof patio and install waterproofing membrane and install new tile surface. all work not visible from street. max u-factor 0.3. repair in kind.Details
(e) exterior french door off of masterbedroom. removal and replace (n) matching french doors. remove pavers located at roof patio and install waterproofing membrane and install new tile surface. all work not visible from street. max u-factor 0.3. repair in kind. | $14,000 |
| Aug 27, 2024 | Completed final sign-off May 2025 | 2721 Union St | remodel 2 existing bathrooms. presently master bathroom to be converted from tub to shower, guest bathroom gets replaced tub. no additional water or electrical demands, new shower, tub, tiles. lights. vent/ fans, vanity cabinets, toilets. each bathroom approx 60sq ft. no increase in sq footage.Details
remodel 2 existing bathrooms. presently master bathroom to be converted from tub to shower, guest bathroom gets replaced tub. no additional water or electrical demands, new shower, tub, tiles. lights. vent/ fans, vanity cabinets, toilets. each bathroom approx 60sq ft. no increase in sq footage. | $75,000 |
| Jun 2, 2023 | Completed final sign-off Sep 2023 | 218 26th Av | master bathroom remodel remove tub and convert to walk in shower, with prefab shower pan new tile on walls floor new vanity relocate plumbing, toliet stay in (e) remove (e) lights replace with in celining led fixtures, remove door, install pocket door, one additonal outletDetails
master bathroom remodel remove tub and convert to walk in shower, with prefab shower pan new tile on walls floor new vanity relocate plumbing, toliet stay in (e) remove (e) lights replace with in celining led fixtures, remove door, install pocket door, one additonal outlet | $30,000 |
| Oct 27, 2022 | In progress issued Mar 2024 | 86 Sussex St | to erect a 1-story, 1 adu unit, type vn building, r-3, new adu on the rear yard of existing front building, under state program #65852.2.Details
to erect a 1-story, 1 adu unit, type vn building, r-3, new adu on the rear yard of existing front building, under state program #65852.2. | $60,000 |
| Nov 9, 2021 | Completed final sign-off Nov 2021 | 616 Carolina St | to perform work to comply with condo report cc-8412. back unit 616 carolina streetDetails
to perform work to comply with condo report cc-8412. back unit 616 carolina street | |
| Oct 22, 2021 | Never finaled issued Oct 2021, no final | 2065 Thomas Av | replace (e) old slider door at back of house w/ same/similar new slider door.Details
replace (e) old slider door at back of house w/ same/similar new slider door. | $5,000 |
| Sep 15, 2021 | Completed final sign-off Jan 2022 | 86 Sussex St | submittal of revision to plans related to bpa#202012281767, page s21 curb & sistering detail #4Details
submittal of revision to plans related to bpa#202012281767, page s21 curb & sistering detail #4 | |
| Jul 13, 2021 | Completed final sign-off Oct 2021 | 86 Sussex St | replace old/broken siding @ front side of house w/wood siding to match remaining front of house.Details
replace old/broken siding @ front side of house w/wood siding to match remaining front of house. | $8,000 |
| Feb 1, 2021 | Expired or cancelled cancelled Jan 2026 | 38 Putnam St | build new deck at back of house. 15'x12'.Details
build new deck at back of house. 15'x12'. | $12,000 |
| Dec 28, 2020 | Completed final sign-off Jan 2022 | 86 Sussex St | existing rotted header over garage removed (shoring installed to support joists) new footer built/poured on one side of garage to support new 6x6 post, and new p.s.l. header installed.Details
existing rotted header over garage removed (shoring installed to support joists) new footer built/poured on one side of garage to support new 6x6 post, and new p.s.l. header installed. | $8,000 |
| Jul 13, 2020 | Completed final sign-off Nov 2020 | 616 Carolina St | back building. building & electrical work to be performed to complete concerns related to tic / condo report. cc-8412.Details
back building. building & electrical work to be performed to complete concerns related to tic / condo report. cc-8412. | $10,000 |
| Jul 7, 2020 | Completed final sign-off Aug 2020 | 32 Alvarado St | (2) section of rotted siding removed @ back of bldg, rotted window framing removed 7' section of rotted top plate removed - all replaced to match (e), (n) window installed matched to (e)Details
(2) section of rotted siding removed @ back of bldg, rotted window framing removed 7' section of rotted top plate removed - all replaced to match (e), (n) window installed matched to (e) | $15,000 |
| Aug 15, 2019 | Completed final sign-off Dec 2019 | 267 Diamond St | partial to-full demolition of stucco and rotted framing of front bay window extention area. re-frame bay window area and restucco to match. all decorative trim to be re-installed /replaced in-kind. paint exteriorDetails
partial to-full demolition of stucco and rotted framing of front bay window extention area. re-frame bay window area and restucco to match. all decorative trim to be re-installed /replaced in-kind. paint exterior | $40,000 |
| Jan 7, 2019 | Completed final sign-off Sep 2019 | 616 Carolina St | alter dimension of beam from (hss 8x2x 1/4) to (hss 8x6x 1/4) and relocate (hss 3x3x 3/8) post at grid line a-4/ 1.5 on 1st level from base of stairs to inside south wall at end of beam mentioned above. ref app#201211214670 and 201609278905Details
alter dimension of beam from (hss 8x2x 1/4) to (hss 8x6x 1/4) and relocate (hss 3x3x 3/8) post at grid line a-4/ 1.5 on 1st level from base of stairs to inside south wall at end of beam mentioned above. ref app#201211214670 and 201609278905 | |
| Sep 27, 2016 | Completed final sign-off Sep 2019 | 616 Carolina St | to comply with nov 201634021, revision to pa 2012-1121-4670,permit to comply with dbi nov dtd 11-11-2016,repair & replace interior or damaged materials,new wall section detail (a5.1) to bring bldg up to current code.means & methods of this scope to be discussed w/dbi,no changes to orig scope.Details
to comply with nov 201634021, revision to pa 2012-1121-4670,permit to comply with dbi nov dtd 11-11-2016,repair & replace interior or damaged materials,new wall section detail (a5.1) to bring bldg up to current code.means & methods of this scope to be discussed w/dbi,no changes to orig scope. |