Gech Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2006 to Feb 2026
- Last 24 months
- 6 permits filed
67 permits since 2000: 55 completed, 5 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 18, 2026 | Completed final sign-off Apr 2026 | 555 Pierce St | kitchen remodel, no changes in-kind.Details
kitchen remodel, no changes in-kind. | $14,700 |
| Oct 21, 2025 | Completed final sign-off Apr 2026 | 452 Ivy St | revision to existing permit 202501309353. remove wall and ceiling covering, insulate and resheetock in kind (5/8" type x) at living room, bedroom, hallway, and storage area totalling 1600 sq ft.Details
revision to existing permit 202501309353. remove wall and ceiling covering, insulate and resheetock in kind (5/8" type x) at living room, bedroom, hallway, and storage area totalling 1600 sq ft. | $14,800 |
| Sep 8, 2025 | In progress issued Sep 2025 | 150 San Benito Wy | replace 1 door and 6 windows, back of home, non street visible, wood for wood window replacement.Details
replace 1 door and 6 windows, back of home, non street visible, wood for wood window replacement. | $14,900 |
| Jun 13, 2025 | In progress issued Jun 2025 | 625 Moultrie St | in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s). | $15,500 |
| May 6, 2025 | Completed final sign-off Jun 2025 | 3925 Noriega St | replace approx 90 sqft of damaged siding. not visible from street.Details
replace approx 90 sqft of damaged siding. not visible from street. | $2,250 |
| Jan 30, 2025 | Completed final sign-off Apr 2026 | 452 Ivy St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 2 shower pan(s). installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 2 shower pan(s). installing gas line. | $51,660 |
| Sep 20, 2024 | In progress issued May 2025 | 239 Bartlett St | revision to 202208090177. revise rear stair.Details
revision to 202208090177. revise rear stair. | $6,000 |
| Oct 10, 2023 | Completed final sign-off Oct 2023 | 775 Burnett Av | deck repair (less than 50%) at rear. repair in kind.Details
deck repair (less than 50%) at rear. repair in kind. | $6,500 |
| Oct 10, 2023 | In progress issued Oct 2023 | 785 Burnett Av | comply with violation 201968991. common area - laundry room door. 2 beams that are rotted. repair in kind.Details
comply with violation 201968991. common area - laundry room door. 2 beams that are rotted. repair in kind. | $3,200 |
| Sep 15, 2023 | Completed final sign-off Oct 2023 | 785 Burnett Av | to comply with 202182473: deck repair less than 50% for units 11 &12 (2 decks total)Details
to comply with 202182473: deck repair less than 50% for units 11 &12 (2 decks total) | $6,500 |
| May 18, 2023 | Completed final sign-off Jan 2025 | 25 Elgin Pk | kitchen remodel: replace cabinets, countertop, sink and carpet. no structural workDetails
kitchen remodel: replace cabinets, countertop, sink and carpet. no structural work | $24,600 |
| May 9, 2023 | Completed final sign-off May 2023 | 775 Burnett Av | dry rot repair less than 50% for unit# 12 deck - in kind. rear of building. no changes in architectural or structural.Details
dry rot repair less than 50% for unit# 12 deck - in kind. rear of building. no changes in architectural or structural. | $5,400 |
| Apr 25, 2023 | Completed final sign-off May 2023 | 775 Burnett Av | dry rot repair less tha 50% for unit 10 deck (rear of building) in kind repair.Details
dry rot repair less tha 50% for unit 10 deck (rear of building) in kind repair. | $5,400 |
| Feb 21, 2023 | Completed final sign-off Jul 2023 | 555 Pierce St | unit 202: kitchen remodel: no structural work: replace like for likeDetails
unit 202: kitchen remodel: no structural work: replace like for like | $23,500 |
| Feb 21, 2023 | Completed final sign-off Jun 2023 | 775 Burnett Av | unit 10:kitchen remodel, no structure work: replace like for likeDetails
unit 10:kitchen remodel, no structure work: replace like for like | $24,500 |
| Aug 9, 2022 | In progress issued Dec 2023 | 241 Bartlett St | remove and replace existing rear stairs. new firewall along north property line.Details
remove and replace existing rear stairs. new firewall along north property line. | $70,000 |
| Jan 12, 2022 | Completed final sign-off Mar 2022 | 1382 Pacific Av | demo of kitchen. replace in kind. paint unit. refinish hardwood floors. no structural. electric and plumbing under seperate permits.Details
demo of kitchen. replace in kind. paint unit. refinish hardwood floors. no structural. electric and plumbing under seperate permits. | $35,000 |
| Jul 27, 2020 | Completed final sign-off Aug 2020 | 555 Pierce St | kitchen remodel like for likeDetails
kitchen remodel like for like | $15,000 |
| Sep 23, 2019 | Completed final sign-off Nov 2019 | 1563 Innes Av | siding repair to fire damaged building 14' x 16' , not facing streetDetails
siding repair to fire damaged building 14' x 16' , not facing street | $40,000 |
| Sep 23, 2019 | Completed final sign-off Nov 2019 | 1245 31st Av | replace 6 windows at rear of building. not visible from streetDetails
replace 6 windows at rear of building. not visible from street | $8,000 |
| Jun 21, 2019 | Completed final sign-off Sep 2019 | 452 Ivy St | remodel bathroom, remove shower, replace bathtub, add lights in kitchen. relocate pides inside wall, square up closet (non-structural), wood flooring, paintingDetails
remodel bathroom, remove shower, replace bathtub, add lights in kitchen. relocate pides inside wall, square up closet (non-structural), wood flooring, painting | $31,000 |
| Apr 30, 2019 | Completed final sign-off Jul 2019 | 1245 31st Av | bathrooms remodel (2) replace fixtures, shower pan, installation no electricalDetails
bathrooms remodel (2) replace fixtures, shower pan, installation no electrical | $18,000 |
| Apr 11, 2019 | Completed final sign-off Jul 2021 | 90 Lapidge St | revisions to appl. # 2019/02/26/3785. install comb fire service off 6" main on lapidge street above sprinkler system. installed under bpa#201902263785Details
revisions to appl. # 2019/02/26/3785. install comb fire service off 6" main on lapidge street above sprinkler system. installed under bpa#201902263785 | $15,000 |
| Feb 19, 2019 | Completed final sign-off Dec 2019 | 905 Capp St | rev to pa# 201606109680; relocate toters location to within garage. remove (e) garage door&infill w(n)door&brick wall.Details
rev to pa# 201606109680; relocate toters location to within garage. remove (e) garage door&infill w(n)door&brick wall. | $7,000 |
| Jan 17, 2019 | Completed final sign-off Jun 2019 | 509 Webster St | remodel bathroomDetails
remodel bathroom | $14,800 |
| Sep 27, 2018 | Completed final sign-off Aug 2020 | 90 Lapidge St | revision to pa 2017-0815-4833, replace additional 50 linear ft of existing concrete foundation with new concrete at garage. reduce depth of joists at garageDetails
revision to pa 2017-0815-4833, replace additional 50 linear ft of existing concrete foundation with new concrete at garage. reduce depth of joists at garage | $13,000 |
| Jun 4, 2018 | Never finaled issued Jun 2018, no final | 830 Lake St | apt #1: repair of water damaged kitchen. no change of (e) floor plan. n/a for maher.Details
apt #1: repair of water damaged kitchen. no change of (e) floor plan. n/a for maher. | $115,000 |
| Mar 12, 2018 | Completed final sign-off Apr 2018 | 649 Minna St | repair two steps (complaint #201840562)Details
repair two steps (complaint #201840562) | $440 |
| Sep 12, 2017 | Completed final sign-off Feb 2018 | 452 Ivy St | replace siding back of building with hardy board, not visible. repair less 50% of deck & stairs. replace (7) windows at rear of building - not visible from street same size, configuration with vinyl window. one window at rear going from slider to double hungDetails
replace siding back of building with hardy board, not visible. repair less 50% of deck & stairs. replace (7) windows at rear of building - not visible from street same size, configuration with vinyl window. one window at rear going from slider to double hung | $20,000 |
| Aug 12, 2015 | Completed final sign-off Dec 2018 | 25 Elgin Pk | addition of 4th floor ( 3 condominiums) over (e) 3 stories, 9 units building. building to be sprinklered. ** maher: compliance with ordinance no# 155-13 not required **Details
addition of 4th floor ( 3 condominiums) over (e) 3 stories, 9 units building. building to be sprinklered. ** maher: compliance with ordinance no# 155-13 not required ** | $350,000 |
| May 20, 2015 | Completed final sign-off Jul 2015 | 1186 Folsom St | installation of 3 private offices within an existing interior office on 2nd fl. compliance with maher ordinance no. 155-13 not required.Details
installation of 3 private offices within an existing interior office on 2nd fl. compliance with maher ordinance no. 155-13 not required. | $11,700 |
| Apr 2, 2015 | Expired or cancelled expired Jun 2018 | 71 Pierce St | revision to 201012227203-s1 remodel existing building, removal of unit b from 1st fl under previous permit and moving back unit b to orig place at 3rd fl. no digging down in basement/1st fl. 3fd fl expansion to remain under prev permit. 2nd fl to be remodeledDetails
revision to 201012227203-s1 remodel existing building, removal of unit b from 1st fl under previous permit and moving back unit b to orig place at 3rd fl. no digging down in basement/1st fl. 3fd fl expansion to remain under prev permit. 2nd fl to be remodeled | |
| Dec 2, 2014 | Completed final sign-off Feb 2020 | 489 Day St | conversion of lower level storage to habitable space includes bathrm, bedrm & laudry. addition to rear of of 15' deep. addition housing bedroom & bath. add new interior stair. no alteration to front or bldg height.Details
conversion of lower level storage to habitable space includes bathrm, bedrm & laudry. addition to rear of of 15' deep. addition housing bedroom & bath. add new interior stair. no alteration to front or bldg height. | $148,000 |
| Nov 5, 2014 | Completed final sign-off Jul 2017 | 1239 Athens St | renovation & rear addition. adding bath, bed, home office, sauna @ ground. replace (e) deck w/ terrace, enlarging kitchen & adding powder room @ 2nd, adding bath & small rear terrace @ 3rd.Details
renovation & rear addition. adding bath, bed, home office, sauna @ ground. replace (e) deck w/ terrace, enlarging kitchen & adding powder room @ 2nd, adding bath & small rear terrace @ 3rd. | $310,000 |
| Sep 9, 2014 | Completed final sign-off Oct 2016 | 2426 Pine St | add interior stair between 1st floor and basement. add a storage, 2 full baths, a family, a bedroom, a playroom and laundry area. replace windows on ground floor. relocate water heater and furnace, replace extg foundation, excavate ground floor. replace stairs and retaining wall at rear yard.Details
add interior stair between 1st floor and basement. add a storage, 2 full baths, a family, a bedroom, a playroom and laundry area. replace windows on ground floor. relocate water heater and furnace, replace extg foundation, excavate ground floor. replace stairs and retaining wall at rear yard. | $150,000 |
| Aug 29, 2014 | Completed final sign-off May 2015 | 1186 Folsom St | interior renovation of existing 2nd flr business/office space, install 2 new restrooms, new duct work for (e) furnace, no exterior work, no increase in floor area, no change to facade; maher n/aDetails
interior renovation of existing 2nd flr business/office space, install 2 new restrooms, new duct work for (e) furnace, no exterior work, no increase in floor area, no change to facade; maher n/a | $68,400 |
| Aug 11, 2014 | Completed final sign-off May 2015 | 1186 Folsom St | 2nd floor - interior demo of interior non load bearing walls, demo of (e) toilet & break rooms, removal of dropped ceiling, removal of 1/4 plywood interior perimeter walls, removal of (e) carpet & vinyl tile; maher n/aDetails
2nd floor - interior demo of interior non load bearing walls, demo of (e) toilet & break rooms, removal of dropped ceiling, removal of 1/4 plywood interior perimeter walls, removal of (e) carpet & vinyl tile; maher n/a | $9,300 |
| May 27, 2014 | Completed final sign-off Jun 2014 | 180 Carl St | remove 2 skylights in response to nov#201339601 in unit#3. repair kitchen sink & flooring in unit#3 in response to nov#201343871Details
remove 2 skylights in response to nov#201339601 in unit#3. repair kitchen sink & flooring in unit#3 in response to nov#201343871 | $500 |
| May 15, 2014 | Completed final sign-off Aug 2016 | 180 Carl St | to comply with nov 201342401 & item 1 of nov 201343871 stores. and renovation of g/f storage area, revovation of unit 1; add rear deck at grade level, convert portion of storage to bathroom/ manger's office. add laundry to units 1, 2 & 4. fire rate storage rooms as per novs. sprinklers on separate.Details
to comply with nov 201342401 & item 1 of nov 201343871 stores. and renovation of g/f storage area, revovation of unit 1; add rear deck at grade level, convert portion of storage to bathroom/ manger's office. add laundry to units 1, 2 & 4. fire rate storage rooms as per novs. sprinklers on separate. | $62,800 |
| Feb 28, 2014 | Completed final sign-off May 2014 | 712 10th Av | renovation of front of 2 unit residence. restore attic window, restore shingle, restore conice. add trim modify balustrade. " work in common"Details
renovation of front of 2 unit residence. restore attic window, restore shingle, restore conice. add trim modify balustrade. " work in common" | $22,400 |
| Dec 6, 2013 | Completed final sign-off Jan 2014 | 218 Bocana St | erect 21' long fence between adjacent property at back of house bet. 222x218 bocana 10' highDetails
erect 21' long fence between adjacent property at back of house bet. 222x218 bocana 10' high | $1,950 |
| Dec 4, 2013 | Completed final sign-off Dec 2014 | 222 Bocana St | underpinning of north property line in preparation for new garage at 218 bocana.Details
underpinning of north property line in preparation for new garage at 218 bocana. | $15,300 |
| Dec 4, 2013 | Completed final sign-off Jun 2014 | 180 Carl St | to comply notice of violation 201330091 - replace new toilet in unit 3; repair back stairs less than 50% - replace rotted lumber in kind and correct substandard construction to code.Details
to comply notice of violation 201330091 - replace new toilet in unit 3; repair back stairs less than 50% - replace rotted lumber in kind and correct substandard construction to code. | $5,000 |
| Oct 22, 2013 | Completed final sign-off Jun 2014 | 451 Sanchez St | minor interior remodel on 1st floor flat-add half bathroom with washer/dryer, remodel kitchen, replacing windows, not visible from the streetDetails
minor interior remodel on 1st floor flat-add half bathroom with washer/dryer, remodel kitchen, replacing windows, not visible from the street | $21,000 |
| Sep 26, 2013 | Completed final sign-off Oct 2013 | 40 Elgin Pk | replace (e) french doors - no structural work at rear of houseDetails
replace (e) french doors - no structural work at rear of house | $1,800 |
| Sep 6, 2013 | Expired or cancelled cancelled Dec 2013 | 451 Sanchez St | remodel kitchen & bathroom, replace 4 windows (not visible from street). no structural work.Details
remodel kitchen & bathroom, replace 4 windows (not visible from street). no structural work. | $37,000 |
| May 24, 2013 | Completed final sign-off Sep 2013 | 2426 Pine St | to comply with cc-7734 condo conversion reportDetails
to comply with cc-7734 condo conversion report | $1,500 |
| Jan 4, 2013 | Completed final sign-off Jan 2014 | 2 Atalaya Tr | installation of a new metal 6'-0" high gate and side railing in the sidewalkway of a s.f.d. residence in san francisco.Details
installation of a new metal 6'-0" high gate and side railing in the sidewalkway of a s.f.d. residence in san francisco. | $1,100 |
| Oct 15, 2012 | Completed final sign-off Jan 2013 | 451 Sanchez St | comply with city report (application cc-7136) requirements for condo conversionDetails
comply with city report (application cc-7136) requirements for condo conversion | $16,000 |
| Aug 30, 2012 | Completed final sign-off Dec 2012 | 59 Ramona Av | remodel bathroom & toilet room on 3rd floorDetails
remodel bathroom & toilet room on 3rd floor | $12,000 |
| Jul 23, 2012 | Completed final sign-off Apr 2013 | 2 Atalaya Tr | interior renovation @ 2nd & 3rd floor - remodeling (e) kitchen , (e) powder room, (e) bathroom, replace washer/dryer, add new bathroom within bldg envelope, additional outlets & lighting.Details
interior renovation @ 2nd & 3rd floor - remodeling (e) kitchen , (e) powder room, (e) bathroom, replace washer/dryer, add new bathroom within bldg envelope, additional outlets & lighting. | $114,000 |
| Jul 19, 2012 | Completed final sign-off Nov 2012 | 2153 Lake St | remove existing columns, canopy, railing & tile at entry stairs. install new solid railing, stone tile & handrail at entry stairs. install new trim at entry alcove.Details
remove existing columns, canopy, railing & tile at entry stairs. install new solid railing, stone tile & handrail at entry stairs. install new trim at entry alcove. | $15,000 |
| Jan 27, 2012 | Completed final sign-off May 2012 | 1326 31st Av | comply with nov 201177881,dated 1-5-12 . remove illegal kitchen. legalize bottom bathroom, bedroom, family room, and laundryDetails
comply with nov 201177881,dated 1-5-12 . remove illegal kitchen. legalize bottom bathroom, bedroom, family room, and laundry | $16,500 |
| Sep 7, 2011 | Completed final sign-off Sep 2013 | 40 Elgin Pk | 2nd. floor (e) unit to remain. 1st. floor legalize (e) rooms to become a second residential unit.Details
2nd. floor (e) unit to remain. 1st. floor legalize (e) rooms to become a second residential unit. | $5,000 |
| Jul 1, 2011 | Completed final sign-off Jul 2011 | 376 21st Av | dry rot repair at side of bldg. approx 50 sq ft area.Details
dry rot repair at side of bldg. approx 50 sq ft area. | $3,000 |
| Feb 14, 2011 | Completed final sign-off Feb 2011 | 647 Minna St | to comply with complaint #201188607: sheetrock a fire tape, handrail, paint clean up.Details
to comply with complaint #201188607: sheetrock a fire tape, handrail, paint clean up. | $3,300 |
| Feb 8, 2011 | Completed final sign-off Dec 2014 | 218 Bocana St | demolish 2 car garage.Details
demolish 2 car garage. | $20,000 |
| Feb 8, 2011 | Completed final sign-off Dec 2014 | 218 Bocana St | erect new private 2 car garage, type 5 building.Details
erect new private 2 car garage, type 5 building. | $207,499 |
| Dec 22, 2010 | Expired or cancelled expired Jun 2018 | 71 Pierce St | remove exterior back stairs.move unit b fr 3/fl to 1/fl.return 3/fl to orig use as bedrooms for unit a.horizontal extension on 3/fl rear.small infill extension on 2/fl rear. excavate at 1/fl to create new unit b.Details
remove exterior back stairs.move unit b fr 3/fl to 1/fl.return 3/fl to orig use as bedrooms for unit a.horizontal extension on 3/fl rear.small infill extension on 2/fl rear. excavate at 1/fl to create new unit b. | $200,000 |
| Jun 1, 2010 | Completed final sign-off Jul 2010 | 3852 21st St | replace bad steps in stairs & deck in rear yard, less than 50%. replace in kind, no structural workDetails
replace bad steps in stairs & deck in rear yard, less than 50%. replace in kind, no structural work | $740 |
| May 12, 2010 | Completed final sign-off Jul 2010 | 279 Jersey St | repair to parts of deck less then 50% at rear of bldgDetails
repair to parts of deck less then 50% at rear of bldg | $1,700 |
| Apr 21, 2009 | Completed final sign-off Nov 2009 | 2426 Pine St | remodel 1 kitchen 2 bathroom. no structural work. replace back windows (total 11 windows). not visible from street. same size and location u-factor 0.67 max.Details
remodel 1 kitchen 2 bathroom. no structural work. replace back windows (total 11 windows). not visible from street. same size and location u-factor 0.67 max. | $56,500 |
| Aug 18, 2008 | Never finaled issued Aug 2008, no final | 279 Jersey St | repair of dry rot to extrnal stairs (front stairs) less than 50%Details
repair of dry rot to extrnal stairs (front stairs) less than 50% | $1,350 |
| Apr 4, 2008 | Completed final sign-off Aug 2008 | 3442 Clay St | remodel 2 bathrooms on the 2nd floor of unit #3442Details
remodel 2 bathrooms on the 2nd floor of unit #3442 | $35,000 |
| Oct 11, 2007 | Expired or cancelled expired Jan 2010 | 769 Duncan St | revision to apppl. #200708159937. remove drywall from ceiling and install 1/2" gyp. bd. on all (3) floors except garage area.Details
revision to apppl. #200708159937. remove drywall from ceiling and install 1/2" gyp. bd. on all (3) floors except garage area. | $6,500 |
| Aug 15, 2007 | Expired or cancelled expired Jan 2010 | 769 Duncan St | bathroom & kitchen remodel. replace rar yard retaining wall. new skylight. window replacement.Details
bathroom & kitchen remodel. replace rar yard retaining wall. new skylight. window replacement. | $175,000 |
| Jul 13, 2006 | Completed final sign-off Oct 2008 | 374 Byxbee St | infill below existing 1st story & horizontal expansion @ rear ground level to accomodate (n) master bedroom & bath. expansion @ rear o n main level (2/f) to accomodate dining room & deck. remodel existing kitchen and bath.Details
infill below existing 1st story & horizontal expansion @ rear ground level to accomodate (n) master bedroom & bath. expansion @ rear o n main level (2/f) to accomodate dining room & deck. remodel existing kitchen and bath. | $88,000 |