901 permits since 2000: 391 completed, 42 in progress, 440 never finaled, 28 expired or cancelled.
Of the 440 never-finaled permits, 54 are 3 to 5 years old, 182 are 5 to 10 years old, 204 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 901.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2026 | Completed final sign-off Aug 2026 | 1434 Rhode Island St | to obtain final inspection for work approved under pa# 202103056008. all work is complete.Details
to obtain final inspection for work approved under pa# 202103056008. all work is complete. | |
| Jun 16, 2026 | Completed final sign-off Jun 2026 | 787 Myra Wy | to obtain final inspection for work approved under pa# 202010096246. all work is complete.Details
to obtain final inspection for work approved under pa# 202010096246. all work is complete. | |
| May 27, 2026 | Completed final sign-off Aug 2026 | 45 Lucerne St | reroofing - hot workDetails
reroofing - hot work | $27,400 |
| May 21, 2026 | Completed final sign-off Jun 2026 | 324 Baker St | re-roofing. hot work.Details
re-roofing. hot work. | $32,140 |
| May 21, 2026 | Completed final sign-off Jun 2026 | 49 Seacliff Av | re-roofing. pitch roof. no hot work.Details
re-roofing. pitch roof. no hot work. | $31,160 |
| May 7, 2026 | Completed final sign-off Aug 2026 | 35 Lucerne St | reroofing hot worksDetails
reroofing hot works | $27,400 |
| May 7, 2026 | Completed final sign-off Aug 2026 | 25 Lucerne St | reroofing hot works.Details
reroofing hot works. | $27,400 |
| May 6, 2026 | Completed final sign-off Aug 2026 | 5 Lucerne St | reroofing with hot works, overlay with 2ply modified bitumen one ply torch down roof system.Details
reroofing with hot works, overlay with 2ply modified bitumen one ply torch down roof system. | $27,400 |
| May 6, 2026 | Completed final sign-off Aug 2026 | 15 Lucerne St | reroofing with hot works, overlay with 2ply modified bitumen one ply torch down roof system.Details
reroofing with hot works, overlay with 2ply modified bitumen one ply torch down roof system. | $27,400 |
| May 5, 2026 | Completed final sign-off Jun 2026 | 209 Teddy Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,800 |
| Apr 24, 2026 | Completed final sign-off May 2026 | 65 Hermann St | re-roofing: tear off, apply 3 ply modified bitumen one ply torch down roof system.Details
re-roofing: tear off, apply 3 ply modified bitumen one ply torch down roof system. | $68,820 |
| Apr 24, 2026 | In progress issued Apr 2026 | 936 York St | re-roofing: tear off, apply one (1) layer of self adhered underlayment, install composition shingle pitch, no hotwork.Details
re-roofing: tear off, apply one (1) layer of self adhered underlayment, install composition shingle pitch, no hotwork. | $38,640 |
| Apr 3, 2026 | Completed final sign-off Apr 2026 | 2618 31st Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,900 |
| Mar 30, 2026 | Completed final sign-off Apr 2026 | 773 Dolores St | reroof w/hot work.Details
reroof w/hot work. | $30,600 |
| Mar 3, 2026 | Completed final sign-off Mar 2026 | 1317 04th Av | re-roofing (w/ torch)Details
re-roofing (w/ torch) | $27,900 |
| Mar 3, 2026 | Completed final sign-off Apr 2026 | 112 Dolphin Ct | re-roofing (w/ torch)Details
re-roofing (w/ torch) | $15,325 |
| Feb 18, 2026 | Completed final sign-off Jun 2026 | 2059 Mission St | reroofing: tear-off and apply 3-ply modified bitumen one ply torch down roof system; flat roof, hot works.Details
reroofing: tear-off and apply 3-ply modified bitumen one ply torch down roof system; flat roof, hot works. | $96,000 |
| Feb 12, 2026 | Completed final sign-off Mar 2026 | 826 28th Av | to obtain final inspection for work approved under pa# 201809069301, all work is complete.Details
to obtain final inspection for work approved under pa# 201809069301, all work is complete. | |
| Feb 12, 2026 | Completed final sign-off Feb 2026 | 1027 Duncan St | to obtain final inspection for work approved under pa# 202307202546. all work is complete.Details
to obtain final inspection for work approved under pa# 202307202546. all work is complete. | |
| Feb 12, 2026 | Completed final sign-off Feb 2026 | 348 Winding Wy | to obtain final inspection for work approved under pa# 202401113790. all work is complete.Details
to obtain final inspection for work approved under pa# 202401113790. all work is complete. | |
| Feb 5, 2026 | Completed final sign-off Jul 2026 | 215 Arkansas St | reroofing: tear off, install diamond synthetic underlayment. install composition shingle, pitch roof. no hot work.Details
reroofing: tear off, install diamond synthetic underlayment. install composition shingle, pitch roof. no hot work. | $24,000 |
| Feb 3, 2026 | Completed final sign-off Jul 2026 | 2254 28th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,380 |
| Jan 9, 2026 | In progress issued Jan 2026 | 121 Goethe St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,200 |
| Jan 9, 2026 | Completed final sign-off Apr 2026 | 852 Moultrie St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,820 |
| Dec 10, 2025 | In progress issued Dec 2025 | 168 Langton St | re-roofing with hot works.Details
re-roofing with hot works. | $15,240 |
| Nov 24, 2025 | In progress issued Nov 2025 | 3233 Jackson St | reroof with hot work.Details
reroof with hot work. | $30,560 |
| Nov 19, 2025 | Completed final sign-off Jul 2026 | 801 Fillmore St | reroofing: all east side lower roof. tear-off, apply 3 ply modified bitumen one ply torch down roof system. hot works.Details
reroofing: all east side lower roof. tear-off, apply 3 ply modified bitumen one ply torch down roof system. hot works. | $63,440 |
| Nov 7, 2025 | Completed final sign-off Nov 2025 | 1019 Woolsey St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,960 |
| Oct 27, 2025 | Completed final sign-off Nov 2025 | 1850 16th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,680 |
| Oct 10, 2025 | In progress issued Oct 2025 | 1523 27th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,060 |
| Oct 1, 2025 | Completed final sign-off Feb 2026 | 2149 Jackson St | reroofing at flat roof only. tear off apply 3 ply modified bitumen 1 ply torch down roof system. no work to (e) roof structural sheathing. no work to front sloped roof.Details
reroofing at flat roof only. tear off apply 3 ply modified bitumen 1 ply torch down roof system. no work to (e) roof structural sheathing. no work to front sloped roof. | $22,400 |
| Oct 1, 2025 | Completed final sign-off Oct 2025 | 4620 Anza St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,520 |
| Sep 23, 2025 | Completed final sign-off Oct 2025 | 2727 Noriega St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $24,920 |
| Sep 18, 2025 | Completed final sign-off Nov 2025 | 1738 Lombard St | reroofing: overlay with 2 ply of modified bitumen one ply torch down roof sysstem. flat roof with hot work.Details
reroofing: overlay with 2 ply of modified bitumen one ply torch down roof sysstem. flat roof with hot work. | $67,880 |
| Sep 17, 2025 | Completed final sign-off Sep 2025 | 2035 Broadway | re-roofing w/ hot works. no work to (e) roof structural sheathing.Details
re-roofing w/ hot works. no work to (e) roof structural sheathing. | $23,900 |
| Sep 17, 2025 | Completed final sign-off Sep 2025 | 1411 Florida St | re-roofing. hot works. no work to (e) roof structural sheathing.Details
re-roofing. hot works. no work to (e) roof structural sheathing. | $26,160 |
| Aug 28, 2025 | Completed final sign-off Sep 2025 | 244 06th Av | reroofing, torch downDetails
reroofing, torch down | $14,000 |
| Aug 27, 2025 | Completed final sign-off Oct 2025 | 77 Hermann St | reroof. torch down. hot work.Details
reroof. torch down. hot work. | $55,000 |
| Aug 22, 2025 | Completed final sign-off Sep 2025 | 464 Molimo Dr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,060 |
| Aug 21, 2025 | Completed final sign-off Aug 2025 | 120 Albatross Ct | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,700 |
| Aug 21, 2025 | Completed final sign-off Aug 2025 | 124 Albatross Ct | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,700 |
| Aug 20, 2025 | Completed final sign-off Aug 2025 | 114 Albatross Ct | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,700 |
| Aug 20, 2025 | Completed final sign-off Sep 2025 | 139 Nautilus Dr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,800 |
| Aug 20, 2025 | Completed final sign-off Sep 2025 | 141 Nautilus Dr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $19,800 |
| Aug 20, 2025 | Completed final sign-off Aug 2025 | 112 Albatross Ct | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,700 |
| Aug 20, 2025 | Completed final sign-off Aug 2025 | 118 Albatross Ct | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,700 |
| Aug 14, 2025 | Completed final sign-off Aug 2025 | 116 Albatross Ct | reroofing with hot works.Details
reroofing with hot works. | $13,700 |
| Aug 8, 2025 | Completed final sign-off Oct 2025 | 2299 Sacramento St | reroofing torch down flat roof.Details
reroofing torch down flat roof. | $92,000 |
| Aug 8, 2025 | Completed final sign-off Sep 2025 | 1911 Vallejo St | reroofing flat roof torch downDetails
reroofing flat roof torch down | $17,640 |
| Aug 7, 2025 | In progress issued Aug 2025 | 220 Battery St | re-roofing with hot works. cool roof with solar reflectance index(sri) 75 minimumDetails
re-roofing with hot works. cool roof with solar reflectance index(sri) 75 minimum | $45,000 |
| Aug 5, 2025 | Completed final sign-off Aug 2025 | 122 Albatross Ct | re-roofing - w/ torch.Details
re-roofing - w/ torch. | $13,700 |
| Aug 5, 2025 | Completed final sign-off Aug 2025 | 126 Albatross Ct | re-roofing w/ torch.Details
re-roofing w/ torch. | $13,700 |
| Jul 29, 2025 | In progress issued Jul 2025 | 217 Arkansas St | reroofing: tear off and apply 3-ply modified bitumen 1-ply torch down roof. flat roof. hot worksDetails
reroofing: tear off and apply 3-ply modified bitumen 1-ply torch down roof. flat roof. hot works | $28,200 |
| Jul 25, 2025 | Completed final sign-off Aug 2025 | 10 Lois Ln | re roofing: hot work. apply 3 ply modified bitumen one ply torch down roof system.Details
re roofing: hot work. apply 3 ply modified bitumen one ply torch down roof system. | $22,000 |
| Jul 21, 2025 | Completed final sign-off Aug 2025 | 137 Nautilus Dr | tear off 7 apply 3-ply modified bitumen 1-ply torch down roof system on flat roof.Details
tear off 7 apply 3-ply modified bitumen 1-ply torch down roof system on flat roof. | $19,800 |
| Jul 16, 2025 | Completed final sign-off Aug 2025 | 133 Nautilus Dr | re-roof. hot work. apply 3 ply modified bitumen. one ply torch down roof system. flat roofDetails
re-roof. hot work. apply 3 ply modified bitumen. one ply torch down roof system. flat roof | $19,000 |
| Jul 16, 2025 | Completed final sign-off Aug 2025 | 135 Nautilus Dr | re-roof. hot work. apply 3 ply modified bitumen, one ply torch down roof system.Details
re-roof. hot work. apply 3 ply modified bitumen, one ply torch down roof system. | $19,000 |
| Jul 11, 2025 | Completed final sign-off Jul 2025 | 1549 Lawton St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,020 |
| Jul 11, 2025 | Completed final sign-off Aug 2025 | 26 Presidio Tr | reroofing - tear off. apply one(1) layer of diamond deck underlayment, install composition shingle in kind. pitch roof. no hot work. no work to (e) roof structural sheathing.Details
reroofing - tear off. apply one(1) layer of diamond deck underlayment, install composition shingle in kind. pitch roof. no hot work. no work to (e) roof structural sheathing. | $66,000 |
| Jul 8, 2025 | Completed final sign-off Jul 2025 | 219 De Montfort Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $6,000 |
| Jul 3, 2025 | Completed final sign-off Jul 2025 | 1112 Ashbury St | to obtain final inspection for work approved under pa# 202010307830. all work is complete.Details
to obtain final inspection for work approved under pa# 202010307830. all work is complete. | |
| Jul 3, 2025 | Completed final sign-off Aug 2025 | 131 Nautilus Dr | re-roofing. tear off. apply 3 ply modified bitumen one ply torch down roof system. flat roof.Details
re-roofing. tear off. apply 3 ply modified bitumen one ply torch down roof system. flat roof. | $19,800 |
| Jul 3, 2025 | Completed final sign-off Oct 2025 | 2111 Franklin St | re-roofing. tear off. apply 3 ply modified bitumen one ply torch down roof systemDetails
re-roofing. tear off. apply 3 ply modified bitumen one ply torch down roof system | $80,000 |
| Jun 26, 2025 | Completed final sign-off Jul 2025 | 119 Palm Av | re-roofing with torch down.Details
re-roofing with torch down. | $48,000 |
| Jun 26, 2025 | Completed final sign-off Sep 2025 | 143 Nautilus Dr | re-roofing with torch down.Details
re-roofing with torch down. | $19,800 |
| Jun 11, 2025 | Completed final sign-off Sep 2025 | 145 Nautilus Dr | re roofing hot works. tear off apply 3 ply modified bitumen. one ply torch down roof system. flat roof.Details
re roofing hot works. tear off apply 3 ply modified bitumen. one ply torch down roof system. flat roof. | $19,800 |
| Jun 11, 2025 | Completed final sign-off Jul 2025 | 1661 Green St | re roofing hot works. tear off apply 3 ply modified bitumen. one ply torch down roof system.Details
re roofing hot works. tear off apply 3 ply modified bitumen. one ply torch down roof system. | $27,480 |
| Jun 10, 2025 | In progress issued Jun 2025 | 69 Kiska Rd | re-roofing with hot works.Details
re-roofing with hot works. | $48,000 |
| Jun 10, 2025 | In progress issued Jun 2025 | 65 Kiska Rd | re-roofing with hot works.Details
re-roofing with hot works. | $32,000 |
| May 12, 2025 | Completed final sign-off May 2025 | 479 Pennsylvania Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,900 |
| May 7, 2025 | Completed final sign-off May 2025 | 2520 16th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,000 |
| Apr 17, 2025 | In progress issued Apr 2025 | 2885 Union St | reroof torch downDetails
reroof torch down | $22,540 |
| Mar 28, 2025 | In progress issued Mar 2025 | 151 Stillings Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,520 |
| Mar 27, 2025 | In progress issued Mar 2025 | 124 Coral Ct | reroofing with hot worksDetails
reroofing with hot works | $88,000 |
| Mar 21, 2025 | In progress issued Mar 2025 | 1329 Kirkham St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,620 |
| Feb 25, 2025 | In progress issued Feb 2025 | 4425 Pacheco St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,220 |
| Feb 14, 2025 | In progress issued Feb 2025 | 2579 15th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,420 |
| Jan 16, 2025 | Completed final sign-off Feb 2025 | 250 Peabody St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,940 |
| Dec 9, 2024 | In progress issued Dec 2024 | 3451 Broderick St | reroofing torch down roof systemDetails
reroofing torch down roof system | $18,070 |
| Dec 9, 2024 | Completed final sign-off Jan 2025 | 261 Fair Oaks St | reroofing. no torch down.Details
reroofing. no torch down. | $21,760 |
| Nov 25, 2024 | In progress issued Nov 2024 | 1185 Ingalls St | re-roofing. apply 3 ply modified bitumen one ply torch down roof system. flat roof.Details
re-roofing. apply 3 ply modified bitumen one ply torch down roof system. flat roof. | $28,100 |
| Nov 25, 2024 | In progress issued Nov 2024 | 1195 Ingalls St | re-roofing apply 3 ply modified bitumen one ply torch down roof system. flat roof.Details
re-roofing apply 3 ply modified bitumen one ply torch down roof system. flat roof. | $50,000 |
| Nov 13, 2024 | In progress issued Nov 2024 | 127 09th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,640 |
| Nov 5, 2024 | In progress issued Nov 2024 | 3536 Divisadero St | reroofing: torch down work: tear off and apply 3 ply modified bitumen- one ply roof system- flat roofDetails
reroofing: torch down work: tear off and apply 3 ply modified bitumen- one ply roof system- flat roof | $31,400 |
| Nov 4, 2024 | Completed final sign-off Nov 2024 | 348 Eureka St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,640 |
| Nov 4, 2024 | In progress issued Nov 2024 | 2417 Webster St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,140 |
| Oct 10, 2024 | In progress issued Oct 2024 | 47 Knollview Wy | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,400 |
| Oct 7, 2024 | In progress issued Oct 2024 | 2295 Market St | reroofing: overlay w/ 2 ply modified bitumen one ply torch down roof system. flat roof.Details
reroofing: overlay w/ 2 ply modified bitumen one ply torch down roof system. flat roof. | $49,600 |
| Oct 7, 2024 | In progress issued Oct 2024 | 400 Liberty St | reroofing: tear off (e) roofing. apply 3 ply modified bitumen one ply torch down roof system flat roof. no work to (e) roof structural sheathing.Details
reroofing: tear off (e) roofing. apply 3 ply modified bitumen one ply torch down roof system flat roof. no work to (e) roof structural sheathing. | $22,660 |
| Oct 4, 2024 | In progress issued Oct 2024 | 1000 Pennsylvania Av | reroofingDetails
reroofing | $48,000 |
| Sep 30, 2024 | Completed final sign-off Oct 2024 | 1774 Great Hy | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $22,660 |
| Sep 27, 2024 | In progress issued Sep 2024 | 141 Cortland Av | reroofingDetails
reroofing | $29,200 |
| Sep 16, 2024 | Completed final sign-off Sep 2024 | 935 Avalon Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $17,880 |
| Sep 16, 2024 | In progress issued Sep 2024 | 1987 21st Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,840 |
| Sep 12, 2024 | In progress issued Sep 2024 | 33 Zoe St | re-roofingDetails
re-roofing | $94,000 |
| Aug 29, 2024 | Completed final sign-off Jul 2026 | 130 Albatross Ct | reroofing.Details
reroofing. | $96,000 |
| Aug 29, 2024 | Expired or cancelled cancelled Oct 2024 | 696 Missouri St | reroofDetails
reroof | $25,000 |
| Aug 21, 2024 | Completed final sign-off Jul 2026 | 131 Marlin Ct | reroofingDetails
reroofing | $14,750 |
| Aug 21, 2024 | Completed final sign-off Sep 2024 | 778 19th Av | re-roofingDetails
re-roofing | $19,320 |
| Aug 14, 2024 | Completed final sign-off Aug 2024 | 1270 31st Av | re-roofingDetails
re-roofing | $20,000 |