Gamble Construction
- Based in
- San Ramon
- On San Francisco permits
- Jun 2014 to Jun 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2014 | Completed final sign-off Aug 2014 | 237 Ellis St | remove and replace existing sinks, install new sinks, enclose exposed wires by building pony wall. install frb bored to pony wall behind sinks. tile floor in cooking area. install frb board to wall of storage areaDetails
remove and replace existing sinks, install new sinks, enclose exposed wires by building pony wall. install frb bored to pony wall behind sinks. tile floor in cooking area. install frb board to wall of storage area | $10,000 |