Gallagher Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Jun 2018
- Last 24 months
- 0 permits filed
17 permits since 2000: 14 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2018 | Completed final sign-off Nov 2018 | 947 Church St | replace extg beam and post in crawlspace.Details
replace extg beam and post in crawlspace. | $10,000 |
| Mar 28, 2018 | Never finaled issued Mar 2018, no final | 2662 17th Av | replace (e) foundation. remove (e) garage posts and replace with steel beams. install new shearwalls in garage, ply walls, replace one wood beamDetails
replace (e) foundation. remove (e) garage posts and replace with steel beams. install new shearwalls in garage, ply walls, replace one wood beam | $75,000 |
| Sep 12, 2017 | Completed final sign-off Sep 2019 | 1438 South Van Ness Av | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. replace portions of (e) foundation w/(n) reinforce foundation, add shearwalls & holdowns.Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. replace portions of (e) foundation w/(n) reinforce foundation, add shearwalls & holdowns. | $20,000 |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 2678 17th Av | replace failed retaining wall and portion of extg bldg ret. wall /footing.Details
replace failed retaining wall and portion of extg bldg ret. wall /footing. | $30,000 |
| Mar 10, 2017 | Completed final sign-off Mar 2018 | 544 Church St | comply w/nov 201642247 - mandatory soft story upgrade as per sfbc chapter 34b utilizing 2012 iebc, appendix a-4. add plywood shearwalls w/holdowns, add three hardy panels w/grade beam.Details
comply w/nov 201642247 - mandatory soft story upgrade as per sfbc chapter 34b utilizing 2012 iebc, appendix a-4. add plywood shearwalls w/holdowns, add three hardy panels w/grade beam. | $50,000 |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 2580 26th Av | street spaceDetails
street space | |
| Sep 26, 2016 | Completed final sign-off May 2017 | 1408 Wawona St | approved bpa for repair to primary building façade (stucco, in-kind replacement; area = approx. 320 sq. ft.); no demolition approved, only repair of damaged stucco.Details
approved bpa for repair to primary building façade (stucco, in-kind replacement; area = approx. 320 sq. ft.); no demolition approved, only repair of damaged stucco. | $5,000 |
| Jul 25, 2016 | Completed final sign-off Sep 2017 | 936 South Van Ness Av | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. replace portions of the (e) foundationg with (n) reinforced foundation. add shearwalls & holddowns.Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. replace portions of the (e) foundationg with (n) reinforced foundation. add shearwalls & holddowns. | $125,000 |
| Aug 28, 2015 | Completed final sign-off Jun 2016 | 950 Pine St | soft story upgrade per sfbc chapeter 34b, per 2012 iebc appendix a-4Details
soft story upgrade per sfbc chapeter 34b, per 2012 iebc appendix a-4 | $150,000 |
| Apr 30, 2015 | Completed final sign-off Mar 2016 | 1501 Larkin St | revision to soft story upgrade pa#201412184090, replace 3 (e) rotten wood beams with new steel beams, columns & footings.Details
revision to soft story upgrade pa#201412184090, replace 3 (e) rotten wood beams with new steel beams, columns & footings. | $20,000 |
| Dec 18, 2014 | Completed final sign-off Mar 2016 | 1501 Larkin St | mandatory soft story retrofit as per sfbc ch. 34b, utilizing 2012 iebc, appendix a-4.Details
mandatory soft story retrofit as per sfbc ch. 34b, utilizing 2012 iebc, appendix a-4. | $150,000 |
| Sep 22, 2014 | Completed final sign-off Aug 2016 | 407 30th St | revision to appl #2014.0806.3123 - revision to retaining wall details, no interior improvement.Details
revision to appl #2014.0806.3123 - revision to retaining wall details, no interior improvement. | |
| Aug 27, 2014 | Completed final sign-off Aug 2015 | 1501 Larkin St | replace portion of exisitng brick footings with new reinforced concrete foundations. add plywood wall holdownsDetails
replace portion of exisitng brick footings with new reinforced concrete foundations. add plywood wall holdowns | $40,000 |
| Aug 19, 2014 | Completed final sign-off Jul 2016 | 407 30th St | revision to appl. #2014.0806.3123. foundation replacement per plan. no exterior work.Details
revision to appl. #2014.0806.3123. foundation replacement per plan. no exterior work. | $30,000 |
| May 30, 2014 | Completed final sign-off Dec 2014 | 28 Prosper St | replace existing brick foudation. remove wood posts + install steel beam. lower garage slab.Details
replace existing brick foudation. remove wood posts + install steel beam. lower garage slab. | $60,000 |
| Mar 27, 2012 | Completed final sign-off Jun 2014 | 274 San Marcos Av | 1)add new media room at 1st floor. 2)lower slab to create legal ceiling ht. 3) add grade bm and shearwalls.Details
1)add new media room at 1st floor. 2)lower slab to create legal ceiling ht. 3) add grade bm and shearwalls. | $15,000 |
| Oct 19, 2010 | Completed final sign-off Jan 2011 | 1353 Ulloa St | stair repair at front less than 50% repair in-kind per termite report #13187 prepared by fox structural & termite control dated 10/14/2010 item no. 3aDetails
stair repair at front less than 50% repair in-kind per termite report #13187 prepared by fox structural & termite control dated 10/14/2010 item no. 3a | $10,000 |