G O Construction
- Based in
- Rohnert Park
- On San Francisco permits
- Mar 2009 to Feb 2015
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2015 | Completed final sign-off Sep 2015 | 21 Warren Dr | rewire the house, new romex wiring, outlets , switches, insulate attic to r-38 fiberglass blowing walls to a-13 replace 2 windows with new, same size & location, back cut in dormer & other vents in attic.Details
rewire the house, new romex wiring, outlets , switches, insulate attic to r-38 fiberglass blowing walls to a-13 replace 2 windows with new, same size & location, back cut in dormer & other vents in attic. | $30,000 |
| Jan 22, 2015 | Completed final sign-off Sep 2015 | 21 Warren Dr | to remodel kitchen and 2 bathrooms. all interior work. new layout in kitchen, remove nonbearing partition wall, new electrical, plmg, cabinets and fixtures. upgrade kitchen window with same size and location. bath remodel. no layout changes. new fixtures and new lighting.Details
to remodel kitchen and 2 bathrooms. all interior work. new layout in kitchen, remove nonbearing partition wall, new electrical, plmg, cabinets and fixtures. upgrade kitchen window with same size and location. bath remodel. no layout changes. new fixtures and new lighting. | $115,000 |
| Mar 10, 2009 | Completed final sign-off Mar 2009 | 21 Warren Dr | reroofingDetails
reroofing | $11,000 |