G G S Construction
- Based in
- So. San Francisco
- On San Francisco permits
- Dec 2008 to Apr 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 26, 2010 | Completed final sign-off Aug 2010 | 15 Beachmont Dr | kitchen alteration. change cabinets, counters, appliances, upgrade elec,plumb. bath alteration, new toilet, sink, vanity, showers, tile floor, shower upgrade, elec plumbingDetails
kitchen alteration. change cabinets, counters, appliances, upgrade elec,plumb. bath alteration, new toilet, sink, vanity, showers, tile floor, shower upgrade, elec plumbing | $75,000 |
| Dec 18, 2008 | Completed final sign-off Mar 2009 | 1423 40th Av | service change 125 amp. bath alteration, upgrade fixtures, tile floor, tile shower, new vanity, add gfi 20 amp. circuit & lighting. all work on 2nd floor.Details
service change 125 amp. bath alteration, upgrade fixtures, tile floor, tile shower, new vanity, add gfi 20 amp. circuit & lighting. all work on 2nd floor. | $23,800 |