G Construction Service Inc
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2022 to Jun 2026
- Last 24 months
- 10 permits filed
48 permits since 2000: 43 completed, 3 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 59 Cook St | replace windows at the front, one picture window at center, two csement windows at the sides. replace staircase at the front. install slate stair trede and riser. repair dry rot underneath as needed.Details
replace windows at the front, one picture window at center, two csement windows at the sides. replace staircase at the front. install slate stair trede and riser. repair dry rot underneath as needed. | $15,000 |
| May 26, 2026 | Completed final sign-off Sep 2026 | 214 Lathrop Av | drywall replacement in living room, bed room, about 600 sq ft, add lighinh throughout home, rewire upstairs. all work is interior.Details
drywall replacement in living room, bed room, about 600 sq ft, add lighinh throughout home, rewire upstairs. all work is interior. | $5,000 |
| Apr 6, 2026 | Completed final sign-off Sep 2026 | 214 Lathrop Av | kitchen renovation in kind, bathroom renovation in kind, tub to shower, all new fixtures. replace electrical panel. no layout change, no wall stud framing demolitionDetails
kitchen renovation in kind, bathroom renovation in kind, tub to shower, all new fixtures. replace electrical panel. no layout change, no wall stud framing demolition | $35,000 |
| Jan 28, 2026 | Completed final sign-off Feb 2026 | 415 Colon Av | to obtain final inspection for work approved under pa # 202401224368. all work is complete.Details
to obtain final inspection for work approved under pa # 202401224368. all work is complete. | |
| Oct 8, 2025 | Completed final sign-off Jan 2026 | 36 Caselli Av | 2/f -remodel & reconfigure bathroom & kitchen wall per planDetails
2/f -remodel & reconfigure bathroom & kitchen wall per plan | $29,600 |
| Jul 16, 2025 | Completed final sign-off Sep 2025 | 42 Arleta Av | dry rot in mstr bedrm, bathrm, guest bedrm, bathrm shower only. install total about 900 sq ft 1/2" plywood and 5/8" type x dry wall in master bedrm, bathrm, guest bedrm, bathrm shower only. remodel in-kind master bedrm, bathrm, guest bedrm and bathrm shower only. prefab shower pan.Details
dry rot in mstr bedrm, bathrm, guest bedrm, bathrm shower only. install total about 900 sq ft 1/2" plywood and 5/8" type x dry wall in master bedrm, bathrm, guest bedrm, bathrm shower only. remodel in-kind master bedrm, bathrm, guest bedrm and bathrm shower only. prefab shower pan. | $20,000 |
| Jun 30, 2025 | In progress issued Dec 2025 | 931 Edinburgh St | rear horizontal addition and interior remodel. 1/f: add (2) bedrooms, (2) full bath, family room, media room and wet bar. relocate laundry. 2/f: remodel bedroom, living room, and bathroom. relocate dining and kitchen. add (1) full bath and interior stairs. replace windows and siding at rear.Details
rear horizontal addition and interior remodel. 1/f: add (2) bedrooms, (2) full bath, family room, media room and wet bar. relocate laundry. 2/f: remodel bedroom, living room, and bathroom. relocate dining and kitchen. add (1) full bath and interior stairs. replace windows and siding at rear. | $250,000 |
| Apr 14, 2025 | Completed final sign-off May 2025 | 5092 Diamond Heights Bl | unit 5092a - remodel master bathroom in kind, no change to layout, no wall demolition nor wall construction. shower pan. relocate electrical panel from closet to hallway.Details
unit 5092a - remodel master bathroom in kind, no change to layout, no wall demolition nor wall construction. shower pan. relocate electrical panel from closet to hallway. | $13,000 |
| Feb 19, 2025 | Completed final sign-off Jul 2025 | 1545 Lake St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $12,000 |
| Nov 21, 2024 | Completed final sign-off Apr 2025 | 3058 Turk Bl | bathroom and kitchen remodel in kind. all new fixtures., replace 2 windows at rear of building, replace plaster with new drywall about 500sqftDetails
bathroom and kitchen remodel in kind. all new fixtures., replace 2 windows at rear of building, replace plaster with new drywall about 500sqft | $25,000 |
| Aug 30, 2024 | Completed final sign-off Sep 2025 | 2005 17th St | new open 1 window on east side. enlarge patio door. enlarge 2 windows on west side. remodel scope at (e) rear office only. not visible from street.Details
new open 1 window on east side. enlarge patio door. enlarge 2 windows on west side. remodel scope at (e) rear office only. not visible from street. | $10,000 |
| Aug 8, 2024 | Completed final sign-off May 2025 | 775 41st Av | 1st fl: add stairs to connect (e) living space 2nd fl: remodel half bath & kitchen 3rd fl remodel (e) bathroom & add 1 full bathDetails
1st fl: add stairs to connect (e) living space 2nd fl: remodel half bath & kitchen 3rd fl remodel (e) bathroom & add 1 full bath | $70,000 |
| Aug 2, 2024 | Completed final sign-off Dec 2024 | 72 Fair Oaks St | kitchen remodel in kind, no change of layout x2. bathroom remodel in kind no change of layout x2. one tub, one shower pan. add subpanel x2 - one in each unit. new wire in two units.Details
kitchen remodel in kind, no change of layout x2. bathroom remodel in kind no change of layout x2. one tub, one shower pan. add subpanel x2 - one in each unit. new wire in two units. | $60,000 |
| Jul 16, 2024 | In progress issued Jul 2024 | 1625 09th Av | (e) damaged double hung "insert" window to be replaced in kind. window is at rear of property on the 3/f and not visible from street or sides (zero lot line property).Details
(e) damaged double hung "insert" window to be replaced in kind. window is at rear of property on the 3/f and not visible from street or sides (zero lot line property). | $1,000 |
| Jul 8, 2024 | Completed final sign-off Aug 2024 | 4116 Ortega St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $22,000 |
| May 28, 2024 | Completed final sign-off Jul 2024 | 38 Caselli Av | reconfigure bathroom per plan at top (4th) floor unit. interior remodel.Details
reconfigure bathroom per plan at top (4th) floor unit. interior remodel. | $12,000 |
| Mar 25, 2024 | Completed final sign-off Jun 2024 | 1310 Fillmore St | bathroom remodel in kind no change of location of fixtures change tub to shower. (no moving walls)Details
bathroom remodel in kind no change of location of fixtures change tub to shower. (no moving walls) | $15,000 |
| Mar 10, 2024 | Completed final sign-off May 2024 | 2773 Bush St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $15,000 |
| Jan 26, 2024 | Completed final sign-off Apr 2024 | 1229 21st Av | revision to pa# 202311201151, reconfiration bathroom layout per plan.Details
revision to pa# 202311201151, reconfiration bathroom layout per plan. | |
| Jan 22, 2024 | Expired or cancelled expired Feb 2026 | 415 Colon Av | demo existing kitchen, install new kitchen, replace windows inkind (rear) , remove french doors, remodel full bath, remodel half bath, remove a section of bearing wall b/w kitchen and dining room, install new ceiling beams. new windows are aluminum clad wood.Details
demo existing kitchen, install new kitchen, replace windows inkind (rear) , remove french doors, remodel full bath, remodel half bath, remove a section of bearing wall b/w kitchen and dining room, install new ceiling beams. new windows are aluminum clad wood. | $45,000 |
| Jan 17, 2024 | Completed final sign-off Oct 2024 | 2130 22nd Av | replace 4 windows to aluminum clad wood (facing street). fix panel on bottom sliding on top. replace in-kind.Details
replace 4 windows to aluminum clad wood (facing street). fix panel on bottom sliding on top. replace in-kind. | $1,500 |
| Dec 5, 2023 | Completed final sign-off Jan 2024 | 280 Morningside Dr | upper level 1: remodel bathroom & closet. upper level 2: remodel bathroomDetails
upper level 1: remodel bathroom & closet. upper level 2: remodel bathroom | $30,000 |
| Nov 20, 2023 | Completed final sign-off Apr 2024 | 1229 21st Av | remodel kitchen and bathroom, convert power room to full bathroom per plansDetails
remodel kitchen and bathroom, convert power room to full bathroom per plans | $48,000 |
| Nov 20, 2023 | Completed final sign-off Jul 2024 | 425 Holloway Av | replace foundation at rear wall, level patio at rer yard with new drain.Details
replace foundation at rear wall, level patio at rer yard with new drain. | $10,000 |
| Oct 23, 2023 | Completed final sign-off Feb 2024 | 2171 Sacramento St | remodel bathroom in kind all new fixtures, add wash/ dryer combo : add 6 recessed lights in livingroom and hallway: replace kitchen countertop: relocate electrical panel outside from closet: shower panDetails
remodel bathroom in kind all new fixtures, add wash/ dryer combo : add 6 recessed lights in livingroom and hallway: replace kitchen countertop: relocate electrical panel outside from closet: shower pan | $25,000 |
| Oct 23, 2023 | Completed final sign-off Jan 2024 | 2375 16th Av | replace siding in the two sides and rear of the building (2000sf) replace window in rear bedroom and two side bed rooms. no work to the frontDetails
replace siding in the two sides and rear of the building (2000sf) replace window in rear bedroom and two side bed rooms. no work to the front | $23,000 |
| Sep 21, 2023 | Completed final sign-off Apr 2024 | 40 Prague St | comply with complaint 202313210, 202313211 and 202313212 remodel kitchen, convert (e) bath to one full bath & powder room at 2nd fl.Details
comply with complaint 202313210, 202313211 and 202313212 remodel kitchen, convert (e) bath to one full bath & powder room at 2nd fl. | $43,000 |
| Jul 27, 2023 | Completed final sign-off Nov 2023 | 5 Red Rock Wy | revision to pa# 202302131902. relocate plumbing for bathtub. add 2 recess light in ceiling. replace 30 sqft drywall in bedroom.Details
revision to pa# 202302131902. relocate plumbing for bathtub. add 2 recess light in ceiling. replace 30 sqft drywall in bedroom. | |
| Jul 27, 2023 | Completed final sign-off Dec 2023 | 940 Cayuga Av | reconfigure and rebuild front entry stairs and landing per plans, replace / repair front siding / waterproofing.Details
reconfigure and rebuild front entry stairs and landing per plans, replace / repair front siding / waterproofing. | $5,000 |
| Jul 21, 2023 | Completed final sign-off Jul 2024 | 425 Holloway Av | repair siding by using fiber cement shingle in the rear side. about 30 sq ft.Details
repair siding by using fiber cement shingle in the rear side. about 30 sq ft. | $2,000 |
| Jul 21, 2023 | Expired or cancelled cancelled Oct 2023 | 1700 Gough St | replacement of drywall about 30 sq ft in bedroom.Details
replacement of drywall about 30 sq ft in bedroom. | $2,000 |
| May 25, 2023 | Completed final sign-off Jun 2023 | 530 Campbell Av | change front door (entry door) same size. add 10 recessed lights in living room and family room.Details
change front door (entry door) same size. add 10 recessed lights in living room and family room. | $4,000 |
| May 25, 2023 | Completed final sign-off Oct 2023 | 29 Castle Manor Av | remodel (1) kitchen in kind. no change of layout. add 4 recessed lights in kitchen. add 8 recessed lights in playrooms. replace vinyl floor in (1) kitchen and (1) bathroom about 150 sf. (all work on ground floor area)Details
remodel (1) kitchen in kind. no change of layout. add 4 recessed lights in kitchen. add 8 recessed lights in playrooms. replace vinyl floor in (1) kitchen and (1) bathroom about 150 sf. (all work on ground floor area) | $23,000 |
| Apr 24, 2023 | Completed final sign-off Jun 2023 | 3 Valletta Ct | master bath renovation/no change in layout, all new fixtures/ change tub and shower pan, install 8 recess lights inside bathroom, install 10 recessed light in m.b -apt #2Details
master bath renovation/no change in layout, all new fixtures/ change tub and shower pan, install 8 recess lights inside bathroom, install 10 recessed light in m.b -apt #2 | $15,000 |
| Mar 31, 2023 | Completed final sign-off Oct 2023 | 360 Allison St | 1/f: convert (e) game rm to kitchenette. 2/f: re-built rear deck & stairway. replace windows @ rearDetails
1/f: convert (e) game rm to kitchenette. 2/f: re-built rear deck & stairway. replace windows @ rear | $23,000 |
| Mar 1, 2023 | Completed final sign-off May 2023 | 212 Denslowe Dr | (1) bathroom remodel in kind at main floor. no floor layout change and no wall layout change. no structural work. fixtures to be replaced in kind.Details
(1) bathroom remodel in kind at main floor. no floor layout change and no wall layout change. no structural work. fixtures to be replaced in kind. | $12,000 |
| Feb 13, 2023 | Completed final sign-off Oct 2023 | 2374 36th Av | replace front windows x 5 to alumimum clad wood / same size and same location/ casement windows. no structural work.Details
replace front windows x 5 to alumimum clad wood / same size and same location/ casement windows. no structural work. | $4,000 |
| Feb 13, 2023 | Completed final sign-off Nov 2023 | 5 Red Rock Wy | 2 bathroom remodels in kind. bathroom a is 64 sq ft full bath remodel on 2nd floor in kind. bath b is 47 sq ft 3/4 bath remodel on 2nd floor inkind. no structural, no changes to walls or openings. all new fixtures and finishes.Details
2 bathroom remodels in kind. bathroom a is 64 sq ft full bath remodel on 2nd floor in kind. bath b is 47 sq ft 3/4 bath remodel on 2nd floor inkind. no structural, no changes to walls or openings. all new fixtures and finishes. | $50,000 |
| Feb 7, 2023 | Completed final sign-off Mar 2023 | 2143 26th Av | repair dryrot at the front right side of the property. (remove siding partial. replace with new one after finishing)Details
repair dryrot at the front right side of the property. (remove siding partial. replace with new one after finishing) | $10,000 |
| Dec 7, 2022 | Completed final sign-off Oct 2023 | 360 Allison St | repair stucco at the front, about 300 sq ft. replace two windows at the front to alum clad sliding. same size, same location, max u-factor 0.30.Details
repair stucco at the front, about 300 sq ft. replace two windows at the front to alum clad sliding. same size, same location, max u-factor 0.30. | $20,000 |
| Sep 8, 2022 | Completed final sign-off Oct 2022 | 1700 Gough St | unit #21: remove and replace kitchen cabinet with no change of layout. replace vanity cabinet, countertop, and faucet. replace toilet. replace ventilation fan in bathroom. replace carpet floor with vinyl planic floor in living room and kitchen.Details
unit #21: remove and replace kitchen cabinet with no change of layout. replace vanity cabinet, countertop, and faucet. replace toilet. replace ventilation fan in bathroom. replace carpet floor with vinyl planic floor in living room and kitchen. | $15,000 |
| Jun 22, 2022 | Completed final sign-off Apr 2023 | 43 Carr St | 2/f: relocated kitchen, bath, remodel bedrooms, add 1 bath & 1 bedroom. resize and replace windows at side of houseDetails
2/f: relocated kitchen, bath, remodel bedrooms, add 1 bath & 1 bedroom. resize and replace windows at side of house | $47,600 |
| May 18, 2022 | Completed final sign-off Oct 2022 | 372 Allison St | remove siding at the front side to expose existing stucco. repair stucco as needed. ~500sf.Details
remove siding at the front side to expose existing stucco. repair stucco as needed. ~500sf. | $15,000 |
| May 18, 2022 | Completed final sign-off Jul 2022 | 1555 40th Av | one in kind bathroom renovation in 2nd floor. convert bathtub to shower. all new fixtures/ close existing shower.Details
one in kind bathroom renovation in 2nd floor. convert bathtub to shower. all new fixtures/ close existing shower. | $15,000 |
| Apr 28, 2022 | Completed final sign-off Oct 2022 | 1319 Dolores St | 50 sq ft bathroom remodel on 2nd floor. no structural. no changes to walls or openings. replacing extg with new curbed shower, toilet and vanity. all new fixtures and finishes.Details
50 sq ft bathroom remodel on 2nd floor. no structural. no changes to walls or openings. replacing extg with new curbed shower, toilet and vanity. all new fixtures and finishes. | $14,500 |
| Apr 7, 2022 | Completed final sign-off May 2022 | 512 Judah St | unit 1 at 2nd floor: bathroom remodel in-kind; unit 3 at 3rd floor: bathroom remodel in-kind. no change of layout, new tub/shower faucet, all new fixtures. led with sensor. exhaust, faucet, fan replacement.Details
unit 1 at 2nd floor: bathroom remodel in-kind; unit 3 at 3rd floor: bathroom remodel in-kind. no change of layout, new tub/shower faucet, all new fixtures. led with sensor. exhaust, faucet, fan replacement. | $20,000 |
| Mar 1, 2022 | Completed final sign-off Jun 2022 | 431 Holloway Av | main floor: remodel kitchen and bathroom. relocate washer and dryer at main fl.Details
main floor: remodel kitchen and bathroom. relocate washer and dryer at main fl. | $28,300 |
| Jan 26, 2022 | Completed final sign-off Jun 2022 | 415 Bryant St | dry wall replacement in living room, about fifty (50) sqft. new paint to partial in living roomDetails
dry wall replacement in living room, about fifty (50) sqft. new paint to partial in living room | $2,000 |