G C Builders
- Based in
- Berkeley
- On San Francisco permits
- Jun 2010 to Mar 2022
- Last 24 months
- 0 permits filed
41 permits since 2000: 37 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2022 | Completed final sign-off Jun 2022 | 2712 Pine St | replace rear patio door in0-kind at back of property with new patio door. replace front iron gate at entry area with new gate as in-kind. replace in existing opening.Details
replace rear patio door in0-kind at back of property with new patio door. replace front iron gate at entry area with new gate as in-kind. replace in existing opening. | $18,000 |
| Dec 7, 2021 | Completed final sign-off Jan 2022 | 100 Quintara St | 4 window replacement same size and location,facing yard uf lo.3. 1 french door replacement. same size location. facing backyard. 1 window at gr fl bathroom to face side of house, not street facing uf lo.3.Details
4 window replacement same size and location,facing yard uf lo.3. 1 french door replacement. same size location. facing backyard. 1 window at gr fl bathroom to face side of house, not street facing uf lo.3. | $21,200 |
| Oct 28, 2020 | Completed final sign-off May 2022 | 1725 Jones St | remove (e) roof deck . make structural amendments per design everest engineer notes. re-roof framing. install (n) pedestal deck system consisting of wood (not to exceed legal limits) and pedestal tile on remainder. no changes to exiting and minor structural improvement on deck framingDetails
remove (e) roof deck . make structural amendments per design everest engineer notes. re-roof framing. install (n) pedestal deck system consisting of wood (not to exceed legal limits) and pedestal tile on remainder. no changes to exiting and minor structural improvement on deck framing | $50,000 |
| Jan 18, 2019 | Completed final sign-off Jul 2022 | 85 Midcrest Wy | add (1) bath, closet & family room under (e) bldg portion that is elevated from ground by column. add interior stair. add an exterior door, guard-height wall & steps on the side of the proposed addition. add gates.Details
add (1) bath, closet & family room under (e) bldg portion that is elevated from ground by column. add interior stair. add an exterior door, guard-height wall & steps on the side of the proposed addition. add gates. | $150,000 |
| Oct 23, 2018 | Completed final sign-off Nov 2018 | 72 06th St | 2/f: install new ada shower bench to wall within (e) shower roomDetails
2/f: install new ada shower bench to wall within (e) shower room | $2,000 |
| Sep 25, 2018 | Completed final sign-off Oct 2018 | 909 Geary St | unit # 421, install grab bars for a shower unitDetails
unit # 421, install grab bars for a shower unit | $2,000 |
| Sep 25, 2018 | Completed final sign-off Oct 2018 | 811 Geary St | unit # 302 install grab bars for a shoer unitDetails
unit # 302 install grab bars for a shoer unit | $2,000 |
| Apr 17, 2018 | Completed final sign-off May 2018 | 74 06th St | 4th and 5th flr. remove and replace all tile and sheetrock from shower stall walls, replace 1 electrical switch, install new hardieback board waterproof shower stall with shower pan test. install new tile at 4th and 5th floor shower area.Details
4th and 5th flr. remove and replace all tile and sheetrock from shower stall walls, replace 1 electrical switch, install new hardieback board waterproof shower stall with shower pan test. install new tile at 4th and 5th floor shower area. | $20,000 |
| Mar 19, 2018 | Completed final sign-off May 2018 | 520 South Van Ness Av | remodel bathroom replace toilet, shower stall & vanity sink in unit#157. n/a for maher.Details
remodel bathroom replace toilet, shower stall & vanity sink in unit#157. n/a for maher. | $15,000 |
| Feb 21, 2018 | Expired or cancelled cancelled Sep 2019 | 540 Jones St | replace or install grab bars in shower tub stall in unit # 510.Details
replace or install grab bars in shower tub stall in unit # 510. | $3,000 |
| Feb 21, 2018 | Completed final sign-off Mar 2018 | 1011 Howard St | replace and install grab bars in hotel bathroom public 3c; n/a maherDetails
replace and install grab bars in hotel bathroom public 3c; n/a maher | $3,000 |
| Feb 21, 2018 | Completed final sign-off Mar 2018 | 34 06th St | install or replace grab bars in shower tub bathroom in units 102, 203.Details
install or replace grab bars in shower tub bathroom in units 102, 203. | $3,000 |
| Feb 21, 2018 | Completed final sign-off Mar 2018 | 445 Ofarrell St | replace and install grab bars in shower tub stall in unit # 423. n/a maherDetails
replace and install grab bars in shower tub stall in unit # 423. n/a maher | $3,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2018 | 520 South Van Ness Av | units 111, 112 & 139c: install grab bars in unit bath tub areas, maher ord 155-13 naDetails
units 111, 112 & 139c: install grab bars in unit bath tub areas, maher ord 155-13 na | $4,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2018 | 405 Valencia St | units 204 & 508: install grab bars in unit bath tub areas, maher ord 155-13 naDetails
units 204 & 508: install grab bars in unit bath tub areas, maher ord 155-13 na | $4,000 |
| Nov 1, 2017 | Completed final sign-off Feb 2018 | 74 06th St | remove tile from 2nd & 3rd floor shower stall, remove any dryrot in framing, replace shower valve and re-ajust floor drain. replace old receptacles and light switches, replace exhaust fan in kind in room 343 & 330. remodel 2 bathrooms, to comply with nov# 2017400241Details
remove tile from 2nd & 3rd floor shower stall, remove any dryrot in framing, replace shower valve and re-ajust floor drain. replace old receptacles and light switches, replace exhaust fan in kind in room 343 & 330. remodel 2 bathrooms, to comply with nov# 2017400241 | $30,000 |
| Oct 24, 2017 | Completed final sign-off Dec 2017 | 2039 47th Av | comply with nov 201774754 - provide 1 hr rated wall & ceiling assemblies in (e) garage. legalize unpermitted work done by previous owner including family room, bath #2 and storage. electrical work will be performed under separate permit e201703273833Details
comply with nov 201774754 - provide 1 hr rated wall & ceiling assemblies in (e) garage. legalize unpermitted work done by previous owner including family room, bath #2 and storage. electrical work will be performed under separate permit e201703273833 | $8,000 |
| Aug 31, 2017 | Never finaled issued Aug 2017, no final | 528 Valencia St | remove existing windows at secondary elevations. install weather proofing and reinstall all windows. no replacement, weather proofing and reinstallation. 52 total.Details
remove existing windows at secondary elevations. install weather proofing and reinstall all windows. no replacement, weather proofing and reinstallation. 52 total. | $31,200 |
| Aug 24, 2017 | Completed final sign-off Sep 2017 | 520 South Van Ness Av | 1/f - 1 bathroom - remove & replace tiles in bathroom & shower floor ; installl new wax ring on toilet. install new waterproofing on floorDetails
1/f - 1 bathroom - remove & replace tiles in bathroom & shower floor ; installl new wax ring on toilet. install new waterproofing on floor | $14,000 |
| Aug 11, 2017 | Never finaled issued Apr 2018, no final | 1011 Howard St | at ground floor - new trash room within existing envelope. no changes visible from street. n/a maher ordinance. life safety deferred if required.Details
at ground floor - new trash room within existing envelope. no changes visible from street. n/a maher ordinance. life safety deferred if required. | $12,000 |
| Aug 9, 2017 | Completed final sign-off Aug 2017 | 74 06th St | 4/f common restroom in hallway- replace tile floor in shower area, install new tileDetails
4/f common restroom in hallway- replace tile floor in shower area, install new tile | $6,000 |
| Jun 27, 2017 | Completed final sign-off Jul 2017 | 74 06th St | remove and replacee tile in shower/bathroom floor on 3rd floorDetails
remove and replacee tile in shower/bathroom floor on 3rd floor | $6,800 |
| May 26, 2017 | Never finaled issued May 2017, no final | 74 06th St | to comply with nov 201766521 item 4 only: replace 2nd floor tile in shower stall with newDetails
to comply with nov 201766521 item 4 only: replace 2nd floor tile in shower stall with new | $5,000 |
| May 26, 2017 | Completed final sign-off Jun 2017 | 520 South Van Ness Av | to comply with nov 201776311 item #7 only: r&r 2nd flr shower stall tileDetails
to comply with nov 201776311 item #7 only: r&r 2nd flr shower stall tile | $5,000 |
| Feb 14, 2017 | Completed final sign-off Mar 2017 | 2791 16th St | to comply with notice of violation #201465801: install grab bars in common area water closets lavatories and bath facilities to comply with ordinance 4 shower, 6 water closetsDetails
to comply with notice of violation #201465801: install grab bars in common area water closets lavatories and bath facilities to comply with ordinance 4 shower, 6 water closets | $3,000 |
| Jan 31, 2017 | Completed final sign-off Feb 2017 | 1011 Howard St | install shower grab bars in 6 bathroom units.Details
install shower grab bars in 6 bathroom units. | $3,000 |
| Nov 22, 2016 | Completed final sign-off Jan 2017 | 520 South Van Ness Av | relocate plumbing, electrical and vent ducts for dryers, build soffit to enclose duct work. patch and refinish concrete walk way inside building. reinstall 4 washer/dryer units and 1 dryer. no sink . dryers shall comply with cmc 905.0Details
relocate plumbing, electrical and vent ducts for dryers, build soffit to enclose duct work. patch and refinish concrete walk way inside building. reinstall 4 washer/dryer units and 1 dryer. no sink . dryers shall comply with cmc 905.0 | $12,000 |
| Aug 25, 2016 | Completed final sign-off Sep 2016 | 140 07th St | replace exterior siding dryrot repair to 4x8 douglass fir siding only approx. 30 sheets. n/a maher ord. 155-13Details
replace exterior siding dryrot repair to 4x8 douglass fir siding only approx. 30 sheets. n/a maher ord. 155-13 | $25,000 |
| May 27, 2015 | Completed final sign-off Jun 2016 | 123 Lyon St | comply with physical inspection report cc 7893. item 4 only for repair rear stairway less than 50%Details
comply with physical inspection report cc 7893. item 4 only for repair rear stairway less than 50% | $3,000 |
| Dec 2, 2013 | Completed final sign-off Jan 2014 | 123 Lyon St | replace 3 windows at front of house, and replace 2 windows at rear of house (wood sash windows) at front of house, 2 vinly replacements at rear of house. max u factor 0.40.Details
replace 3 windows at front of house, and replace 2 windows at rear of house (wood sash windows) at front of house, 2 vinly replacements at rear of house. max u factor 0.40. | $3,500 |
| Aug 8, 2012 | Completed final sign-off Oct 2012 | 1850 Mission St | reroofingDetails
reroofing | $3,000 |
| Aug 8, 2012 | Completed final sign-off Oct 2012 | 1850 Mission St | replace existing duct work to heating & air conditioning units. replace 5 disconnect boxes in-kind. replacement of 8 tempered glass skylights in-kind at same locations. all work is located at top of roof.Details
replace existing duct work to heating & air conditioning units. replace 5 disconnect boxes in-kind. replacement of 8 tempered glass skylights in-kind at same locations. all work is located at top of roof. | $10,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 740 Diamond St | remodel kitchen cabinets, floor, move rough plumbing, paint and change header from kitchen to dining area. add island cabinet, add half bath on 2nd level and remodel bathroom at 3rd floor (no wall relocation). add door to rear deck and repatch wall holes where damaged and paint thru out house.Details
remodel kitchen cabinets, floor, move rough plumbing, paint and change header from kitchen to dining area. add island cabinet, add half bath on 2nd level and remodel bathroom at 3rd floor (no wall relocation). add door to rear deck and repatch wall holes where damaged and paint thru out house. | $40,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 740 Diamond St | replace front side of planter retaining wall in-kind.Details
replace front side of planter retaining wall in-kind. | $6,000 |
| Jan 7, 2011 | Completed final sign-off Jan 2011 | 1197 Sanchez St | dry rot repair to rear of bldg. north/east side, sidings and possible mud sills. south rear exterior wall, siding and possible framing. 25th st. side of wall repair to siding and possible frmaing to exterior wall. front of bldg. to face of bldg. at lower wall section, siding repair and north westDetails
dry rot repair to rear of bldg. north/east side, sidings and possible mud sills. south rear exterior wall, siding and possible framing. 25th st. side of wall repair to siding and possible frmaing to exterior wall. front of bldg. to face of bldg. at lower wall section, siding repair and north west | $11,000 |
| Sep 29, 2010 | Completed final sign-off Nov 2010 | 1001 Pine St | replace bath tub shower tile and shower valve, no door; no window and no wall work on this permitDetails
replace bath tub shower tile and shower valve, no door; no window and no wall work on this permit | $6,000 |
| Sep 27, 2010 | Completed final sign-off Dec 2010 | 1001 Pine St | remodel bathroom tile, tub, vanity sink and light fixture, replacement upgrade electrical gfi and change shower valve, remodel kitchen replacement cabinets and counter tops, upgrade electrical to gfi and new floorings and wall replacementDetails
remodel bathroom tile, tub, vanity sink and light fixture, replacement upgrade electrical gfi and change shower valve, remodel kitchen replacement cabinets and counter tops, upgrade electrical to gfi and new floorings and wall replacement | $17,000 |
| Aug 20, 2010 | Completed final sign-off Sep 2010 | 773 Grove St | repair in kind staircase at rear of building less than 50%Details
repair in kind staircase at rear of building less than 50% | $6,000 |
| Jun 24, 2010 | Completed final sign-off Sep 2010 | 1195 Sanchez St | revision to p.a. #201006174741 for stair repair more than 50%. work is to replace exterior staircase in-kind.Details
revision to p.a. #201006174741 for stair repair more than 50%. work is to replace exterior staircase in-kind. | $7,000 |
| Jun 17, 2010 | Completed final sign-off Sep 2010 | 1195 Sanchez St | replace in-kind exterior stair case at rear of building - less than 50%. no change in configuration .Details
replace in-kind exterior stair case at rear of building - less than 50%. no change in configuration . | $10,000 |
| Jun 1, 2010 | Completed final sign-off Jul 2010 | 1001 Pine St | remodel one bathroom, remove plaster wall, repl w/cement broad) and tile shower, remove toilet vanity and sink, repl all including floor tile, repl all w ith additional channel to support new cement board, no new lightin, no structural workDetails
remodel one bathroom, remove plaster wall, repl w/cement broad) and tile shower, remove toilet vanity and sink, repl all including floor tile, repl all w ith additional channel to support new cement board, no new lightin, no structural work | $6,274 |