Franklin's Construction
- Based in
- Pittsburg
- On San Francisco permits
- Oct 2011 to Dec 2024
- Last 24 months
- 1 permit filed
9 permits since 2000: 6 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2024 | Completed final sign-off Jan 2026 | 53 Lapham Wy | revision to pa# 202409100483. revise kitchen layout. revise bathroom size. convert portion of garage with new wall to unconditioned workshop area. reconfigure 2/f bathroom. upgrade electric to 200 amp. create furnace closet. add insulation to wall cavities.Details
revision to pa# 202409100483. revise kitchen layout. revise bathroom size. convert portion of garage with new wall to unconditioned workshop area. reconfigure 2/f bathroom. upgrade electric to 200 amp. create furnace closet. add insulation to wall cavities. | $4,000 |
| Sep 10, 2024 | Expired or cancelled expired Jan 2026 | 53 Lapham Wy | remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf.Details
remodel (e) kitchen and bathroom at 2nd floor. addition of (n) half bathroom at 1st floor. addition of (n) skylight at kithcen and replace (3) windows located at rear. replace (e) rear landing and deck due to dry rot and extending deck by 21sf. | $30,000 |
| Jun 18, 2024 | Completed final sign-off Jun 2024 | 53 Lapham Wy | reroofing.Details
reroofing. | $17,000 |
| Jun 1, 2022 | Completed final sign-off Jul 2022 | 49 Emerson St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $16,000 |
| Dec 16, 2014 | Completed final sign-off Feb 2015 | 1427 Dolores St | remove and replace 2 post per plan. repair in kind. add gas line for fire pit and add gas line for outdoor bbq pit. install drain for outdoor sink. remove plastic water supply lines for irrigation system with copper supply lines. install landscape. install 1 outlet by pit.Details
remove and replace 2 post per plan. repair in kind. add gas line for fire pit and add gas line for outdoor bbq pit. install drain for outdoor sink. remove plastic water supply lines for irrigation system with copper supply lines. install landscape. install 1 outlet by pit. | $8,300 |
| Jan 31, 2014 | Completed final sign-off Oct 2014 | 938 Le Conte Av | drywall walls and ceiling downstairs/patch upstairs. kitchen (like for like) cabinets/counters floor coverings upstairs for floor and basement. bathrooms (2) new vanities and tile flooring. reinstall doors in basement bedrooms closet and bathrooms.Details
drywall walls and ceiling downstairs/patch upstairs. kitchen (like for like) cabinets/counters floor coverings upstairs for floor and basement. bathrooms (2) new vanities and tile flooring. reinstall doors in basement bedrooms closet and bathrooms. | $18,704 |
| Jun 22, 2012 | Never finaled issued Jun 2012, no final | 226 28th St | bathroom remodel-new floor, tub, vanity & lighting. new shower manifold, pocket doors & tile tub surround. bathroom 7x10 sf. remove and replace light fixtures on the 2nd and 1st floor. cec 150(k) for lighting.Details
bathroom remodel-new floor, tub, vanity & lighting. new shower manifold, pocket doors & tile tub surround. bathroom 7x10 sf. remove and replace light fixtures on the 2nd and 1st floor. cec 150(k) for lighting. | $32,340 |
| Jun 20, 2012 | Completed final sign-off Aug 2012 | 226 28th St | 1st floor-add header & door in non bearing wall. 2nd floor-remove non bearing wall, replace (e) 4x12 ceiling beam with psl beamDetails
1st floor-add header & door in non bearing wall. 2nd floor-remove non bearing wall, replace (e) 4x12 ceiling beam with psl beam | $7,200 |
| Oct 18, 2011 | Expired or cancelled expired Oct 2014 | 5266 03rd St | insulation and dry wall, repair and replace gypboard in kind. area = 100 sq. ft. no structural work.Details
insulation and dry wall, repair and replace gypboard in kind. area = 100 sq. ft. no structural work. | $2,000 |