Forward Express Construction Company
- Based in
- San Mateo
- On San Francisco permits
- Jan 2015 to Jan 2016
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2016 | Completed final sign-off Mar 2016 | 120 Ewing Tr | remodel the old kitchen, remove the cabinet, floor and install new cabinets and floor.Details
remodel the old kitchen, remove the cabinet, floor and install new cabinets and floor. | $10,000 |
| Sep 17, 2015 | Never finaled issued Sep 2015, no final | 234 London St | replace the front windows, six windows will be replace with aluminum windows in-kind.Details
replace the front windows, six windows will be replace with aluminum windows in-kind. | $3,000 |
| Aug 4, 2015 | Completed final sign-off Sep 2015 | 462 Filbert St | remove the old tiles in the bathroom include wall and floor. exchange new vainity and faucet and new tiles on the wall and floor. no wall to be altered.Details
remove the old tiles in the bathroom include wall and floor. exchange new vainity and faucet and new tiles on the wall and floor. no wall to be altered. | $6,000 |
| May 11, 2015 | Completed final sign-off Sep 2015 | 81 Pinehurst Wy | comply w/nov 20152469. ground floor: add home office. remodel (e) bathroom. replace window @ rear. update garage wall & ceiling. legalize rooms to comply update code refers to nov# 201524691. 2nf floor: add 1 bathroom, remodel kitchen & (e) bathroom. install recessed lights in living room.Details
comply w/nov 20152469. ground floor: add home office. remodel (e) bathroom. replace window @ rear. update garage wall & ceiling. legalize rooms to comply update code refers to nov# 201524691. 2nf floor: add 1 bathroom, remodel kitchen & (e) bathroom. install recessed lights in living room. | $135,000 |
| Feb 10, 2015 | Completed final sign-off Apr 2017 | 853 Lombard St | revision to pa#201501135621, add 30 more recess light, replace 15 windows in the back, move dryer/washer to new location, electric outlets (40), new electric sub-panel, replace dryrot at 2 windows, no walls moved, removed or added.Details
revision to pa#201501135621, add 30 more recess light, replace 15 windows in the back, move dryer/washer to new location, electric outlets (40), new electric sub-panel, replace dryrot at 2 windows, no walls moved, removed or added. | $10,000 |
| Jan 13, 2015 | Never finaled issued Jan 2015, no final | 853 Lombard St | remodel two (e) bathrooms & one (e) kitchen.Details
remodel two (e) bathrooms & one (e) kitchen. | $30,000 |