Fornari Inc Dba Bold Construction
- Based in
- Oakland
- On San Francisco permits
- Jan 2025 to Aug 2026
- Last 24 months
- 20 permits filed
20 permits since 2000: 14 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2026 | In progress issued Sep 2026 | 255 Hearst Av | renovation of a portion of the (e) 1st floor,converting it from unconditioned to conditioned space.a new interior stair is proposed to provide access between the upper & lower levels. the (e) 2nd floor kitchen will be removed, a new kitvhen will be installed on the 1st flr. 2nd flr bathroom will beDetails
renovation of a portion of the (e) 1st floor,converting it from unconditioned to conditioned space.a new interior stair is proposed to provide access between the upper & lower levels. the (e) 2nd floor kitchen will be removed, a new kitvhen will be installed on the 1st flr. 2nd flr bathroom will be | $100,000 |
| May 11, 2026 | Completed final sign-off Sep 2026 | 27 Saturn St | bathroom remodel and extension of non-load bearing partition wall.Details
bathroom remodel and extension of non-load bearing partition wall. | $12,000 |
| May 5, 2026 | In progress filed May 2026, not yet issued | 2035 Lyon St | legalize conditioned space in lower level to include (1) media room and (1) bathroom remodel with shower addition.Details
legalize conditioned space in lower level to include (1) media room and (1) bathroom remodel with shower addition. | $11,800 |
| May 5, 2026 | In progress issued May 2026 | 2035 Lyon St | remove wall between kitchen and dining room. widen garage door, angle driveway planterDetails
remove wall between kitchen and dining room. widen garage door, angle driveway planter | $12,500 |
| Apr 29, 2026 | In progress issued Apr 2026 | 1475 Monterey Bl | in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $11,900 |
| Apr 10, 2026 | Completed final sign-off Oct 2026 | 2264 Beach St | revision to pa# 202603248167: addition of exterior stairs w/ fire well to (e) deck.Details
revision to pa# 202603248167: addition of exterior stairs w/ fire well to (e) deck. | $10,500 |
| Apr 10, 2026 | In progress issued Apr 2026 | 1970 Jackson St | revise p/a 2025-0915-5307 to include the scope of work associated with the relocation of an (e) half bathroom on 2nd floor from entry area to kitchen area. non-structural, no change in plumbing fixture count.Details
revise p/a 2025-0915-5307 to include the scope of work associated with the relocation of an (e) half bathroom on 2nd floor from entry area to kitchen area. non-structural, no change in plumbing fixture count. | $5,000 |
| Mar 24, 2026 | Completed final sign-off Oct 2026 | 2264 Beach St | 1st fl: modify floor plan, relocate bathroom, replace window with french foor, (n) fire rated 1 hr wall. 2nd fl: enlarge kitchen opening. 3rd fl: bathroom addition with shower, (n) closets. knob and tube wiring replacement.Details
1st fl: modify floor plan, relocate bathroom, replace window with french foor, (n) fire rated 1 hr wall. 2nd fl: enlarge kitchen opening. 3rd fl: bathroom addition with shower, (n) closets. knob and tube wiring replacement. | $25,800 |
| Mar 1, 2026 | Completed final sign-off Sep 2026 | 2264 Beach St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 3rd fl with 0 shower pan(s). | $18,000 |
| Dec 10, 2025 | Completed final sign-off Feb 2026 | 3234 Clay St | in-kind remodeling of 1 kitchen(s) in 3rd flDetails
in-kind remodeling of 1 kitchen(s) in 3rd fl | $5,000 |
| Dec 4, 2025 | Completed final sign-off Feb 2026 | 3234 Clay St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $5,000 |
| Oct 29, 2025 | Completed final sign-off Nov 2025 | 1556 15th Av | to abate nov 202542182- legalize and revert rear deck and layout per approved plan ref 8800014Details
to abate nov 202542182- legalize and revert rear deck and layout per approved plan ref 8800014 | $2,000 |
| Sep 16, 2025 | Completed final sign-off Oct 2025 | 2260 Leavenworth St | field revision to pa 202508284129 replacement of pad footing; add stemwall note as per detail 1/s3Details
field revision to pa 202508284129 replacement of pad footing; add stemwall note as per detail 1/s3 | $5,000 |
| Sep 15, 2025 | In progress issued Oct 2025 | 1970 Jackson St | 1) build new bathroomon on 1st floor. 2) remodel existing kitchen. 3)build new partition wall on 4th floor.Details
1) build new bathroomon on 1st floor. 2) remodel existing kitchen. 3)build new partition wall on 4th floor. | $40,000 |
| Aug 28, 2025 | Completed final sign-off Oct 2025 | 2260 Leavenworth St | address dry rot condition at ground fl based on wood destroying per termite report# 25524 by markoff stuctural pest control. replace dry rot at deck & stairsDetails
address dry rot condition at ground fl based on wood destroying per termite report# 25524 by markoff stuctural pest control. replace dry rot at deck & stairs | $23,500 |
| Jul 22, 2025 | Completed final sign-off Oct 2025 | 1556 15th Av | legalize (1) bathroom per complaint 20253817 for work previously done without permitDetails
legalize (1) bathroom per complaint 20253817 for work previously done without permit | $10,000 |
| Apr 30, 2025 | Completed final sign-off Jun 2025 | 3234 Lyon St | garage remodel addition of 1 hour fire rated non structural partition wall . remove door stop, (n) exhaust vent for (e) gas dryer, plumbing fixtures for washer and (e) sinkDetails
garage remodel addition of 1 hour fire rated non structural partition wall . remove door stop, (n) exhaust vent for (e) gas dryer, plumbing fixtures for washer and (e) sink | $2,000 |
| Mar 25, 2025 | Completed final sign-off Nov 2025 | 2245 Union St | change of use from an 2 unit commercial use to sfd use. minor kitchen remodel to install a new domestic range & exhaust hood, install new bathroom exhaust fans & combination smoke / carbon monoxide detectos where required. no exterior work proposed.Details
change of use from an 2 unit commercial use to sfd use. minor kitchen remodel to install a new domestic range & exhaust hood, install new bathroom exhaust fans & combination smoke / carbon monoxide detectos where required. no exterior work proposed. | $1,000 |
| Mar 18, 2025 | Completed final sign-off Apr 2025 | 3234 Lyon St | kitchen remodel no wall removal or layout changes.countertops sink and backsplash onlyDetails
kitchen remodel no wall removal or layout changes.countertops sink and backsplash only | $1,000 |
| Jan 7, 2025 | Completed final sign-off Jul 2025 | 1517 06th Av | in-kind kitchen remodel - new cabinets. no moving wallsDetails
in-kind kitchen remodel - new cabinets. no moving walls | $3,000 |