Fisher Construction Grp Inc
- Based in
- Burlington
- On San Francisco permits
- Dec 2018 to Feb 2023
- Last 24 months
- 0 permits filed
10 permits since 2000: 4 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2023 | Completed final sign-off Feb 2023 | 888 Tennessee St | to obtain final inspection for work approved under pa# 201812208875. all work is complete.Details
to obtain final inspection for work approved under pa# 201812208875. all work is complete. | |
| Mar 16, 2021 | Completed final sign-off Aug 2022 | 749 Toland St | revision to pa# 202009194547. adjust demising wall, show more clarity on office. modification to access ramps, wall reinforcement details, hvac revisions, lighting revisions, added building to project 417 & 418. calc revisions, fan & exhaust, etc.Details
revision to pa# 202009194547. adjust demising wall, show more clarity on office. modification to access ramps, wall reinforcement details, hvac revisions, lighting revisions, added building to project 417 & 418. calc revisions, fan & exhaust, etc. | $60,000 |
| Sep 19, 2020 | Completed final sign-off Aug 2022 | 749 Toland St | bldg #418: new interior walls for an office, full height partition wall to separate the warehouse space from van loading spaces for ventilation purpose and a new loading dock on east side of building. install plumbing fixtures, hard lid, and act ceiling systems. electrical, plumbing, hvacs requiredDetails
bldg #418: new interior walls for an office, full height partition wall to separate the warehouse space from van loading spaces for ventilation purpose and a new loading dock on east side of building. install plumbing fixtures, hard lid, and act ceiling systems. electrical, plumbing, hvacs required | $679,083 |
| Sep 1, 2020 | Expired or cancelled cancelled Jan 2026 | 201 Toland St | minor modifications to existing office space and warehouse space. office include new interior partition wall and infill of existing glazing. other modifications include new vestibule to be installed on south wall at existing ramp.Details
minor modifications to existing office space and warehouse space. office include new interior partition wall and infill of existing glazing. other modifications include new vestibule to be installed on south wall at existing ramp. | $135,000 |
| Sep 1, 2020 | Completed final sign-off Aug 2021 | 749 Toland St | non-structural soft demo building components including exterior walls and interior floor slabs. demo work in preparation for tenant improvements under separate permit.Details
non-structural soft demo building components including exterior walls and interior floor slabs. demo work in preparation for tenant improvements under separate permit. | $138,500 |
| Jun 4, 2019 | Expired or cancelled cancelled Nov 2024 | 888 Tennessee St | install 140sf dock enclosure and associated dock equipment, and a 236 sf trash enclosure. west facade alterations. ref t.i. pa201904107585Details
install 140sf dock enclosure and associated dock equipment, and a 236 sf trash enclosure. west facade alterations. ref t.i. pa201904107585 | $325,450 |
| Jun 4, 2019 | Never finaled filed Jun 2019, never issued | 888 Tennessee St | provide emergency outdoor back-up gas generator and 382sf concrete pad for generator. ref t.i. pa201904107585Details
provide emergency outdoor back-up gas generator and 382sf concrete pad for generator. ref t.i. pa201904107585 | $428,777 |
| Apr 10, 2019 | Never finaled issued Jul 2019, no final | 888 Tennessee St | provide mep per plans. install new msb board with integrated automatic transfer switch. provid electrical power to new refrigeration system, mechanical equipment, plumbing equipment, and transformation room equipment. ref app#201904107585 n/a for ~encrypt&~encrypt&~encrypt&~kf21&Details
provide mep per plans. install new msb board with integrated automatic transfer switch. provid electrical power to new refrigeration system, mechanical equipment, plumbing equipment, and transformation room equipment. ref app#201904107585 n/a for ~encrypt&~encrypt&~encrypt&~kf21& | $80,000 |
| Apr 10, 2019 | Never finaled issued Jun 2019, no final | 888 Tennessee St | interior t.i. to add a warehouse cooler, warehouse freezer, and a food repackaging area inside an existing building. n/a for maherDetails
interior t.i. to add a warehouse cooler, warehouse freezer, and a food repackaging area inside an existing building. n/a for maher | $100,000 |
| Dec 20, 2018 | Expired or cancelled expired Feb 2023 | 888 Tennessee St | ground flr improvement incl reconfigure warehouse space, floor plan, racking layout to accommodate storage of drinking alcohol i.e - beer, wine, spirits. maher n/aDetails
ground flr improvement incl reconfigure warehouse space, floor plan, racking layout to accommodate storage of drinking alcohol i.e - beer, wine, spirits. maher n/a | $10,000 |