Fay Tat Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Mar 2025
- Last 24 months
- 1 permit filed
81 permits since 2000: 57 completed, 2 in progress, 15 never finaled, 7 expired or cancelled.
Of the 15 never-finaled permits, 3 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 25, 2025 | In progress issued Mar 2025 | 2786 40th Av | repair roof; no hot work; no drywall work. inside painting due to water damage, repair hard wood floor. bed room and living room.Details
repair roof; no hot work; no drywall work. inside painting due to water damage, repair hard wood floor. bed room and living room. | $15,000 |
| Jul 23, 2024 | In progress issued Jul 2024 | 1175 Capitol Av | interior remodel: remodel full baths & kitchen. 1 (n) full bath & officeDetails
interior remodel: remodel full baths & kitchen. 1 (n) full bath & office | $65,000 |
| Nov 14, 2022 | Completed final sign-off Mar 2023 | 462 Arch St | to obtain final inspection for work approved under pa 201310028309. all work is complete.Details
to obtain final inspection for work approved under pa 201310028309. all work is complete. | |
| Jun 25, 2020 | Completed final sign-off Oct 2024 | 1590 25th Av | 1/f: add 2 full bathrooms, den, office and media room.Details
1/f: add 2 full bathrooms, den, office and media room. | $50,000 |
| Sep 19, 2019 | Completed final sign-off Oct 2020 | 2829 25th St | rev to pa# 201906042397; enlarge roof deck and extend stair hallway for minimum egress distanceDetails
rev to pa# 201906042397; enlarge roof deck and extend stair hallway for minimum egress distance | $50,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 3974 Cesar Chavez St | renew for final 201507222210, 201406279913, 201403251662Details
renew for final 201507222210, 201406279913, 201403251662 | |
| Mar 27, 2018 | Completed final sign-off Mar 2019 | 320 Santa Clara Av | interior remodel of kitchen and den changing window in kind at main level at kitchen at south elevationDetails
interior remodel of kitchen and den changing window in kind at main level at kitchen at south elevation | $50,000 |
| Mar 5, 2018 | Never finaled issued Mar 2018, no final | 1352 Grant Av | residential: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (commercial pa #201801239259)Details
residential: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. (commercial pa #201801239259) | $500 |
| Jan 23, 2018 | Never finaled issued Mar 2018, no final | 1356 Grant Av | commercial: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. comply with wood frame seismic retrofit program on 1st fl. ada bathrooms. (residential pa #201803052840)Details
commercial: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. comply with wood frame seismic retrofit program on 1st fl. ada bathrooms. (residential pa #201803052840) | $80,000 |
| Jan 19, 2017 | Completed final sign-off Nov 2017 | 370 Guttenberg St | 1st floor: add two bedrooms, two baths, a home office area w/wet bar. in 2nd floor: convert (e) closet into a full bath. add a rear deck.Details
1st floor: add two bedrooms, two baths, a home office area w/wet bar. in 2nd floor: convert (e) closet into a full bath. add a rear deck. | $65,000 |
| Nov 17, 2016 | Completed final sign-off Feb 2017 | 195 Rome St | remodel (e) bathroom on uppler level, no change in walls and opening layout; high efficacy lighting or controlled by manuel-on sensor with high efficacy main light.Details
remodel (e) bathroom on uppler level, no change in walls and opening layout; high efficacy lighting or controlled by manuel-on sensor with high efficacy main light. | $7,000 |
| Oct 26, 2016 | Completed final sign-off Nov 2016 | 1515 Polk St | basement level - add one sum pump and sink and one elctrical outlet. n/a maher ord. 155-13Details
basement level - add one sum pump and sink and one elctrical outlet. n/a maher ord. 155-13 | $5,000 |
| Sep 29, 2016 | Completed final sign-off May 2018 | 45 Bernard St | to comply w/ #201603291 - rear stair repair inkindDetails
to comply w/ #201603291 - rear stair repair inkind | $15,000 |
| Aug 23, 2016 | Never finaled issued Aug 2016, no final | 640 Victoria St | remove kitchen cabinets. no alteration of wall, window & doorDetails
remove kitchen cabinets. no alteration of wall, window & door | $1,000 |
| Jul 28, 2016 | Completed final sign-off Nov 2016 | 3622 Quintara St | remodel (e) kitchen upgrade light fixtures in kitchen, dining and living roomsDetails
remodel (e) kitchen upgrade light fixtures in kitchen, dining and living rooms | $12,000 |
| Jul 6, 2016 | Completed final sign-off Dec 2016 | 324 Hanover St | construct 2 rear decks w/stairs at rear of (e) bld. add 2 bedroom, 1 family room 2 full bathrooms and laundry rm on (e) grnd flr. add 1 full bathroom & remodel (e) kitchen and bathroom on 2nd flr. replace (e) gypboard, plumb, ele on 2ndDetails
construct 2 rear decks w/stairs at rear of (e) bld. add 2 bedroom, 1 family room 2 full bathrooms and laundry rm on (e) grnd flr. add 1 full bathroom & remodel (e) kitchen and bathroom on 2nd flr. replace (e) gypboard, plumb, ele on 2nd | $110,000 |
| Mar 7, 2016 | Completed final sign-off Oct 2016 | 1863 Donner Av | revision to app#201603021025 to comply with complaint #201601861 dated 2/9/16. to add one full bathroom on 2nd flr and replace extg damaged sheet rock. plumbing and electrical on 2nd floor per plan.Details
revision to app#201603021025 to comply with complaint #201601861 dated 2/9/16. to add one full bathroom on 2nd flr and replace extg damaged sheet rock. plumbing and electrical on 2nd floor per plan. | $25,000 |
| Mar 2, 2016 | Completed final sign-off Jul 2016 | 1863 Donner Av | remodel kitchen and one bathroom on g/f.Details
remodel kitchen and one bathroom on g/f. | $20,000 |
| Feb 1, 2016 | Completed final sign-off Aug 2016 | 1863 Donner Av | to comply with n.o.v. #201572442, items #2 and #7: to add 2 bedrooms, 2 full bathrooms and laundry on extg ground floor per plan.Details
to comply with n.o.v. #201572442, items #2 and #7: to add 2 bedrooms, 2 full bathrooms and laundry on extg ground floor per plan. | $50,000 |
| Dec 31, 2015 | Completed final sign-off Jul 2017 | 465 14th Av | soft story retrofit per sfbc chapter 34b (2012 iebc appendix a-4).Details
soft story retrofit per sfbc chapter 34b (2012 iebc appendix a-4). | $30,000 |
| Aug 4, 2015 | Completed final sign-off Aug 2015 | 3324 Broderick St | administrative permit to clarify mandatory seismic work. (soft story). per chapter 34b-sfbc. method applied "2012 iebc a-4". new permit to ref work done under pa# 201402128368Details
administrative permit to clarify mandatory seismic work. (soft story). per chapter 34b-sfbc. method applied "2012 iebc a-4". new permit to ref work done under pa# 201402128368 | |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 3974 Cesar Chavez St | remodel 2/f bathroom: no walls moved, removed or added or infilled. all (e) layouts to remain unchanged.Details
remodel 2/f bathroom: no walls moved, removed or added or infilled. all (e) layouts to remain unchanged. | $12,700 |
| Apr 22, 2015 | Completed final sign-off Oct 2020 | 2829 25th St | horizontal & vertical addition to a single family building for 4 residential units including (n) bathrooms, bedrooms & kitchens for all units.Details
horizontal & vertical addition to a single family building for 4 residential units including (n) bathrooms, bedrooms & kitchens for all units. | $800,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2016 | 566 Congo St | comply with 201525711, no change to exterior envelope, remodel bathrooms, upgrade structural where interior walls removed, remodel kitchen, new finishes and fixtures in kitchen and 2 baths.Details
comply with 201525711, no change to exterior envelope, remodel bathrooms, upgrade structural where interior walls removed, remodel kitchen, new finishes and fixtures in kitchen and 2 baths. | $15,000 |
| Sep 8, 2014 | Completed final sign-off May 2015 | 2943 Sacramento St | renovate (e) bath room: increase (e) shower pan, (n) tile wall, (n) shower door and (n) plumbing fixturesDetails
renovate (e) bath room: increase (e) shower pan, (n) tile wall, (n) shower door and (n) plumbing fixtures | $3,000 |
| Jul 29, 2014 | Completed final sign-off Jun 2015 | 1415 Stockton St | volunteer strenghtening upgrade (e) building: install one steel frame in (e) building and shear collectors. add handdicap restroom. install shear wall. install two drill piers foundation.Details
volunteer strenghtening upgrade (e) building: install one steel frame in (e) building and shear collectors. add handdicap restroom. install shear wall. install two drill piers foundation. | $25,000 |
| Jul 24, 2014 | Completed final sign-off May 2015 | 2943 Sacramento St | kitchen remodel including: 1)change cabinet. relocate stove, dishwasher. 2)add electrical lights and outlets. 3)remove extg non bearing wall, finish extg wood floor.Details
kitchen remodel including: 1)change cabinet. relocate stove, dishwasher. 2)add electrical lights and outlets. 3)remove extg non bearing wall, finish extg wood floor. | $5,000 |
| Jun 27, 2014 | Never finaled issued Aug 2014, no final | 3974 Cesar Chavez St | remodel ground floor bathroom. new water heater and furnace. two new skylights at roof. legalized offce at ground fl.Details
remodel ground floor bathroom. new water heater and furnace. two new skylights at roof. legalized offce at ground fl. | $13,000 |
| Jun 6, 2014 | Completed final sign-off Jul 2014 | 1411 Stockton St | correct violation complaint #201468812. install grab bars at 2/f men & women shower & toilet stall. install grab bars at 3/f men & women shower & toilet stall. total 4 shower rooms & 4 toilet stalls.Details
correct violation complaint #201468812. install grab bars at 2/f men & women shower & toilet stall. install grab bars at 3/f men & women shower & toilet stall. total 4 shower rooms & 4 toilet stalls. | $3,000 |
| May 21, 2014 | Completed final sign-off May 2014 | 3324 Broderick St | replace broken garage door only. n/a maher ordinance # 155-13Details
replace broken garage door only. n/a maher ordinance # 155-13 | $800 |
| Apr 10, 2014 | Completed final sign-off Nov 2014 | 1028 Wisconsin St | to obtain final inspection for work approved under pa 201204037474; all work is completeDetails
to obtain final inspection for work approved under pa 201204037474; all work is complete | |
| Mar 25, 2014 | Never finaled issued Mar 2014, no final | 3974 Cesar Chavez St | remodel (e) kitchen at 2nd floor. painting.Details
remodel (e) kitchen at 2nd floor. painting. | $12,000 |
| Feb 12, 2014 | Completed final sign-off May 2014 | 3324 Broderick St | install 5/8" a.b. @ perimeter wall @ garage, install 1/2" plywood & 5/8" gyp bd at perimeter wall at garage, install 3 steel frames & footings, replace 2 (e) wood posts w/4"-0 pipe & footings, install 5' sliding door & 2' window @ rear wall, 5/8" gyp bd at ceiling.Details
install 5/8" a.b. @ perimeter wall @ garage, install 1/2" plywood & 5/8" gyp bd at perimeter wall at garage, install 3 steel frames & footings, replace 2 (e) wood posts w/4"-0 pipe & footings, install 5' sliding door & 2' window @ rear wall, 5/8" gyp bd at ceiling. | $25,000 |
| Jan 17, 2014 | Never finaled issued Jan 2014, no final | 4183 24th St | rear unit - remove (e) footig, replace with (n) concrete retaining wall at west side of (e) house.Details
rear unit - remove (e) footig, replace with (n) concrete retaining wall at west side of (e) house. | $6,000 |
| Dec 26, 2013 | Never finaled issued Dec 2013, no final | 4187 24th St | remodel kitchen and 1 half bath. to comply with 150(k) 8 & 10Details
remodel kitchen and 1 half bath. to comply with 150(k) 8 & 10 | $28,000 |
| Oct 2, 2013 | Expired or cancelled expired Nov 2022 | 462 Arch St | 2-story rear addition including 2 new bedrooms at ground floor & extend 2 (e) bedrooms at 2nd floor. add 1 new bathroom & storage at ground floor.Details
2-story rear addition including 2 new bedrooms at ground floor & extend 2 (e) bedrooms at 2nd floor. add 1 new bathroom & storage at ground floor. | $50,000 |
| Sep 11, 2013 | Completed final sign-off May 2014 | 147 Peralta Av | alteration upper & lower units. new bedrm, bathrm,lanundry area at existing 1st floor useable space. add new spiral stair connect to garage. remodel/relocate (e)kitchen & bathroom at 2nd floor & 3rd floor. add 2 dormers. replace (e)front windows inkind w/aluminum wood clad. replace (e)window @ rear.Details
alteration upper & lower units. new bedrm, bathrm,lanundry area at existing 1st floor useable space. add new spiral stair connect to garage. remodel/relocate (e)kitchen & bathroom at 2nd floor & 3rd floor. add 2 dormers. replace (e)front windows inkind w/aluminum wood clad. replace (e)window @ rear. | $78,000 |
| Aug 20, 2013 | Completed final sign-off May 2014 | 147 Peralta Av | foundation upgrade at extg storage (plus or minus 667 sq ft) for 8'-0' ceiling height and crawl space (plus or minus 336 sq ft) on 1st floor of duplex.Details
foundation upgrade at extg storage (plus or minus 667 sq ft) for 8'-0' ceiling height and crawl space (plus or minus 336 sq ft) on 1st floor of duplex. | $50,000 |
| Jun 20, 2013 | Completed final sign-off Oct 2013 | 1343 12th Av | remove approx. 45 ft dilapitated foundtion and replace with (n) reinforced concrete foundation at bldg rear section.Details
remove approx. 45 ft dilapitated foundtion and replace with (n) reinforced concrete foundation at bldg rear section. | $15,000 |
| May 28, 2013 | Completed final sign-off Jul 2013 | 438 34th Av | comply with nov #201398971. build new rear deck in rear yard. 12'x22'Details
comply with nov #201398971. build new rear deck in rear yard. 12'x22' | $10,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2013 | 646 Corbett Av | repair samll section of walkway floor plywood (wall on the 3rd fl). no structural repair.Details
repair samll section of walkway floor plywood (wall on the 3rd fl). no structural repair. | $1,800 |
| Oct 12, 2012 | Completed final sign-off Apr 2013 | 2409 18th Av | work in apt. #2: kitchen and bathroom remodel. lighting to comply with cec 180kDetails
work in apt. #2: kitchen and bathroom remodel. lighting to comply with cec 180k | $14,500 |
| Jul 24, 2012 | Completed final sign-off Jan 2013 | 438 34th Av | kitchen remodel for both units. lighting will comply w/title 24.Details
kitchen remodel for both units. lighting will comply w/title 24. | $25,000 |
| May 4, 2012 | Completed final sign-off Jul 2012 | 100 Carmel St | one kitchen remodel, non structural in kindDetails
one kitchen remodel, non structural in kind | $7,000 |
| Apr 27, 2012 | Completed final sign-off Jul 2012 | 15 Red Rock Wy | to comply nov#201211263 & 201211264. repair plumbing & electrical. install baseboards, new fireplace mantel & plaster wall around fireplace to make smooth. repair fireplace. install kitchen & bath counter tops only.Details
to comply nov#201211263 & 201211264. repair plumbing & electrical. install baseboards, new fireplace mantel & plaster wall around fireplace to make smooth. repair fireplace. install kitchen & bath counter tops only. | $9,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2012 | 514 Cayuga Av | remodel kitchen on 2nd floor. layout to stay the same with new appliances and cabinets. (all(n) lighting must comply with cec 150 (k) 8)Details
remodel kitchen on 2nd floor. layout to stay the same with new appliances and cabinets. (all(n) lighting must comply with cec 150 (k) 8) | $5,000 |
| Aug 18, 2011 | Completed final sign-off Sep 2011 | 747 Niagara Av | repair exterior staircase at front of property.Details
repair exterior staircase at front of property. | $2,000 |
| Mar 28, 2011 | Completed final sign-off Aug 2011 | 140 Genebern Wy | revision to pa# 2010.10.01.2119. new bedroom on ground fl, new window in fam . rm. fam rm exits out to a concrete patio on grade w/ a 40" height retaining wall above gradeDetails
revision to pa# 2010.10.01.2119. new bedroom on ground fl, new window in fam . rm. fam rm exits out to a concrete patio on grade w/ a 40" height retaining wall above grade | $1,500 |
| Nov 15, 2010 | Completed final sign-off Nov 2010 | 56 Newburg St | revision to pa# 2009-0617-0634-master bathroom got extend to 2'x7' (in garage) & an extra step from staircase landing into family roomDetails
revision to pa# 2009-0617-0634-master bathroom got extend to 2'x7' (in garage) & an extra step from staircase landing into family room | |
| Oct 1, 2010 | Completed final sign-off Aug 2011 | 140 Genebern Wy | remodel existing ground floor space to create new family room, bath rooom, sauna, laundry, & mechanical room.new concrete steps on grade to existing rear yard.Details
remodel existing ground floor space to create new family room, bath rooom, sauna, laundry, & mechanical room.new concrete steps on grade to existing rear yard. | $55,000 |
| Jul 26, 2010 | Completed final sign-off May 2011 | 2638 19th Av | add new master suite and bathroom on ground/ garage floor. relocate existin water heater and furnaceDetails
add new master suite and bathroom on ground/ garage floor. relocate existin water heater and furnace | $20,000 |
| Apr 12, 2010 | Completed final sign-off May 2010 | 20 Crestline Dr | unit# 4 at 2nd floor. update kitchn cabinet and kitchen sink. no change in equipments.Details
unit# 4 at 2nd floor. update kitchn cabinet and kitchen sink. no change in equipments. | $5,000 |
| Sep 14, 2009 | Completed final sign-off Apr 2010 | 1125 Leavenworth St | interior remodeling - ground floor: add new closet, bathroom & remodel bar sink. 2nd floor: close door at living room & relocate sink & dishwasher. add bathroom & clsoet, remodel (e) bathroom & fixture.Details
interior remodeling - ground floor: add new closet, bathroom & remodel bar sink. 2nd floor: close door at living room & relocate sink & dishwasher. add bathroom & clsoet, remodel (e) bathroom & fixture. | $60,000 |
| Sep 14, 2009 | Completed final sign-off Apr 2010 | 2 Kimball Pl | interior remodeling: remove sauna & add closet to master bedroom, remodel & remove door master bathroom.Details
interior remodeling: remove sauna & add closet to master bedroom, remodel & remove door master bathroom. | $5,000 |
| Mar 3, 2009 | Never finaled issued Mar 2009, no final | 384 Capp St | comply with nov 200991080 dated 2/6/09. remove existing wooden utility ladder friom rear exterior elevationDetails
comply with nov 200991080 dated 2/6/09. remove existing wooden utility ladder friom rear exterior elevation | $350 |
| Feb 17, 2009 | Completed final sign-off Mar 2011 | 3735 Anza St | revision to pa# 2008-0620-4964-delete proposed interior remodel work at 2nd floor unit #2 & unit #3, delete proposed interior remodel work at 3rd floor unit #6Details
revision to pa# 2008-0620-4964-delete proposed interior remodel work at 2nd floor unit #2 & unit #3, delete proposed interior remodel work at 3rd floor unit #6 | |
| Dec 19, 2008 | Never finaled issued Dec 2008, no final | 1028 Wisconsin St | renew pa# 2004/12/08/0961 to obtain final inspection.Details
renew pa# 2004/12/08/0961 to obtain final inspection. | |
| Sep 23, 2008 | Completed final sign-off Jan 2009 | 1069 York St | alteration to kitchen and half-bath on second floorDetails
alteration to kitchen and half-bath on second floor | $15,000 |
| Jun 20, 2008 | Expired or cancelled expired Jan 2017 | 3735 Anza St | interior remodel: unit#7-relocate kitchen & study rm, add 1 bathrm, master bedrm w/new bathrm, remodel (e) bathrms & bedrms, unit #4,5,6-remodel (e) bathrms & kitchen, relocate entry doors & add 1 door to living rm, unit #1,2,3-remodel (e) bathrm/kitchen, relocate entry doors, non structural partitiDetails
interior remodel: unit#7-relocate kitchen & study rm, add 1 bathrm, master bedrm w/new bathrm, remodel (e) bathrms & bedrms, unit #4,5,6-remodel (e) bathrms & kitchen, relocate entry doors & add 1 door to living rm, unit #1,2,3-remodel (e) bathrm/kitchen, relocate entry doors, non structural partiti | $100,000 |
| Jun 13, 2008 | Never finaled issued Jun 2008, no final | 195 Ney St | remodel existing kitchen. cabinets, counters, flooring replaced new lighting to be ove 50% fluorescent.Details
remodel existing kitchen. cabinets, counters, flooring replaced new lighting to be ove 50% fluorescent. | $11,000 |
| Mar 21, 2008 | Expired or cancelled expired Mar 2010 | 2530 36th Av | correction notice from bid inspector (seismic upgrade the (e) building) remove/replace sheetrock, add shear walls as shown on the drawings. increase estimate cost of job at pa# 2007-1218-0681Details
correction notice from bid inspector (seismic upgrade the (e) building) remove/replace sheetrock, add shear walls as shown on the drawings. increase estimate cost of job at pa# 2007-1218-0681 | $40,000 |
| Jul 24, 2007 | Completed final sign-off Sep 2007 | 6445 Geary Bl | replacement of 1 (n) 32" door in basement mechanical room, 20 min. fire rated.Details
replacement of 1 (n) 32" door in basement mechanical room, 20 min. fire rated. | $500 |
| Jul 20, 2007 | Never finaled issued Jul 2007, no final | 466 22nd Av | to partial comply with complant #200709651 item #8 only. replace of one new 32" door in basement for mech. roomDetails
to partial comply with complant #200709651 item #8 only. replace of one new 32" door in basement for mech. room | $500 |
| Apr 16, 2007 | Completed final sign-off Nov 2008 | 75 Lakeshore Dr | convert e storage space on ground floor into 2 bedrooms, 2 bath,1 family room, and 1 laundry roomDetails
convert e storage space on ground floor into 2 bedrooms, 2 bath,1 family room, and 1 laundry room | $30,000 |
| Mar 23, 2007 | Completed final sign-off Jul 2007 | 550 Myra Wy | remodel second flr. 1 bathroom-flourecent lighting.Details
remodel second flr. 1 bathroom-flourecent lighting. | $5,000 |
| Mar 6, 2007 | Completed final sign-off Sep 2007 | 1075 York St | no exzterior work except painting & replace windows. interior remodeling of (e) building 2nd & groundfloor. new kitchen, remodel (e) 2 baths, repair stair, replace windows at rear of building with same size. repair/replace plaster w/ (n) sheetrock paint. no structural work.Details
no exzterior work except painting & replace windows. interior remodeling of (e) building 2nd & groundfloor. new kitchen, remodel (e) 2 baths, repair stair, replace windows at rear of building with same size. repair/replace plaster w/ (n) sheetrock paint. no structural work. | $80,000 |
| May 10, 2006 | Completed final sign-off May 2006 | 1064 Washington St | replace water damage steop 10% at rear stair.Details
replace water damage steop 10% at rear stair. | $1,500 |
| Mar 6, 2006 | Completed final sign-off Aug 2006 | 395 Country Club Dr | add rooms at ground floor. computer room, office & full bath.Details
add rooms at ground floor. computer room, office & full bath. | $17,000 |
| Feb 23, 2005 | Expired or cancelled expired Sep 2007 | 501 30th St | renew permit app 200406156462Details
renew permit app 200406156462 | |
| Dec 8, 2004 | Never finaled issued Nov 2006, no final | 1028 Wisconsin St | to erect a new 3 story and penthouse, with 2 dwelling units.Details
to erect a new 3 story and penthouse, with 2 dwelling units. | $500,000 |
| Nov 19, 2004 | Completed final sign-off Dec 2005 | 1485 Dolores St | remodel 3 bathroom/remodel 1 kchnDetails
remodel 3 bathroom/remodel 1 kchn | $25,000 |
| Sep 13, 2004 | Completed final sign-off Jan 2005 | 1536 Lake St | rehab kitchen cabinetsDetails
rehab kitchen cabinets | $12,000 |
| Aug 19, 2004 | Completed final sign-off Sep 2004 | 191 Pine St | renew 200307240253 & 200304011221.Details
renew 200307240253 & 200304011221. | |
| Apr 27, 2004 | Completed final sign-off Jul 2004 | 1425 Rivera St | add 1 full bath room&relocate kitchen on exist grd fl. convert exist kitchen to bedroom use per planDetails
add 1 full bath room&relocate kitchen on exist grd fl. convert exist kitchen to bedroom use per plan | $12,000 |
| Apr 2, 2004 | Completed final sign-off Apr 2004 | 395 Head St | revise plan for pa #200311190568Details
revise plan for pa #200311190568 | |
| Nov 19, 2003 | Completed final sign-off Apr 2004 | 395 Head St | to add 1 playroom,2bedroom,1 full bath,laundry on (e) g/fDetails
to add 1 playroom,2bedroom,1 full bath,laundry on (e) g/f | $18,000 |
| Jul 24, 2003 | Expired or cancelled expired Sep 2004 | 191 Pine St | revision to orig permit 993373 appl #200304011211. relocation of makeup fan.Details
revision to orig permit 993373 appl #200304011211. relocation of makeup fan. | |
| Apr 1, 2003 | Expired or cancelled expired Sep 2004 | 191 Pine St | install kitchen equipment & type 1 grease hood, install grease exhust duct and make0up fan w/ducts.pDetails
install kitchen equipment & type 1 grease hood, install grease exhust duct and make0up fan w/ducts.p | $22,000 |
| Oct 28, 2002 | Never finaled issued Oct 2002, no final | 1447 35th Av | repair stucco at front of houseDetails
repair stucco at front of house | $1,500 |
| Mar 7, 2002 | Completed final sign-off Sep 2002 | 2631 24th Av | toadd two bed rooms. one full bath and one laundry room/storage on existing ground flr per planDetails
toadd two bed rooms. one full bath and one laundry room/storage on existing ground flr per plan | $25,000 |
| Sep 4, 2001 | Expired or cancelled expired Mar 2002 | 234 Silver Av | add 2 bedrooms/1 full bath/1 laundry room/storage on (e) g/floorDetails
add 2 bedrooms/1 full bath/1 laundry room/storage on (e) g/floor | $12,000 |