Fara
- Based in
- San Francisco
- On San Francisco permits
- Jul 2025 to Jul 2026
- Last 24 months
- 5 permits filed
5 permits since 2000: 2 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress filed Jul 2026, not yet issued | 543 Jersey St | excavate the existing garage & 1st floor room to lower the finished floor elevation by approximately 1 foot. excavate the existing crawl space to provide approximately 5 feet of clear headroom. excavate the rear yard to create a level open space in front of the rear of the house. install new 5' highDetails
excavate the existing garage & 1st floor room to lower the finished floor elevation by approximately 1 foot. excavate the existing crawl space to provide approximately 5 feet of clear headroom. excavate the rear yard to create a level open space in front of the rear of the house. install new 5' high | $10,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 359 Douglass St | replace existing rear yard retaining wallls at perimeter of existing deck; add new keystone walls and concrete patioDetails
replace existing rear yard retaining wallls at perimeter of existing deck; add new keystone walls and concrete patio | $10,000 |
| May 27, 2026 | In progress issued Aug 2026 | 359 Douglass St | construction of horizontal rear addition at basement and 1st fl. addition is located at the rear of the building and not visible from the public. basement: rear extension 514 sf, new bath. 1st fl rear extention 815 sf, relocate stair, new bedroom, new bath.Details
construction of horizontal rear addition at basement and 1st fl. addition is located at the rear of the building and not visible from the public. basement: rear extension 514 sf, new bath. 1st fl rear extention 815 sf, relocate stair, new bedroom, new bath. | $150,000 |
| Jul 25, 2025 | Completed final sign-off Oct 2025 | 878 47th Av | revision to permit pa#2025-0703-0200 1) relocated proposed laundry to lower floor. 2) relocated existing bedroom with living room at lower floorDetails
revision to permit pa#2025-0703-0200 1) relocated proposed laundry to lower floor. 2) relocated existing bedroom with living room at lower floor | |
| Jul 3, 2025 | Completed final sign-off Oct 2025 | 878 47th Av | no change in envelope/front or rear facade of bldg. upper lvl: remove wall btw dining & living. relocate kitchen. add a bath for master bed. altered e) kitchen w/ office rm. lower lvl: legalize conversion of garage to living space. legalize addition bath.Details
no change in envelope/front or rear facade of bldg. upper lvl: remove wall btw dining & living. relocate kitchen. add a bath for master bed. altered e) kitchen w/ office rm. lower lvl: legalize conversion of garage to living space. legalize addition bath. | $10,000 |