Falco Construction
- Based in
- El Granada
- On San Francisco permits
- Apr 2017 to Sep 2021
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2021 | Completed final sign-off Sep 2022 | 188 Minna St | kitchen remodel like for like: bathroom remodel like for like. no structural work.Details
kitchen remodel like for like: bathroom remodel like for like. no structural work. | $85,000 |
| Jun 17, 2019 | Completed final sign-off Feb 2020 | 10 Presidio Tr | replace windows in master bedroom, guest bedroom, bedroom 1 and bathroom that are currently vinyl with wood-clad. replace 3 windows at front w/double hung wood. total of 10 windows. max u-factor 0.32 or better.Details
replace windows in master bedroom, guest bedroom, bedroom 1 and bathroom that are currently vinyl with wood-clad. replace 3 windows at front w/double hung wood. total of 10 windows. max u-factor 0.32 or better. | $32,000 |
| Jun 17, 2019 | Completed final sign-off Feb 2020 | 10 Presidio Tr | on third floor, reconfigure master bedroom closet by squaring off master closet and add new door in bathroom.Details
on third floor, reconfigure master bedroom closet by squaring off master closet and add new door in bathroom. | $20,000 |
| Jun 17, 2019 | Completed final sign-off Feb 2020 | 10 Presidio Tr | remodel 1 kitchen in kind, remodel 4 bathrooms in kind, replace flooring.Details
remodel 1 kitchen in kind, remodel 4 bathrooms in kind, replace flooring. | $200,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 188 Minna St | replace bathrub with shower. replace counter tops and appliances. remove closet non bearing wall. replace finishes throughout unitDetails
replace bathrub with shower. replace counter tops and appliances. remove closet non bearing wall. replace finishes throughout unit | $60,000 |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 188 Minna St | #23f: remove drop ceiling, replace cabinetry. replace tub with shower. replace glass wall with wall.Details
#23f: remove drop ceiling, replace cabinetry. replace tub with shower. replace glass wall with wall. | $85,000 |
| Apr 13, 2017 | Completed final sign-off Apr 2018 | 255 Berry St | master bath remodel. replace remove tubDetails
master bath remodel. replace remove tub | $45,000 |