Extol Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2014 to Jul 2021
- Last 24 months
- 0 permits filed
32 permits since 2000: 26 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2021 | Completed final sign-off Apr 2022 | 1918 Pierce St | replace/remoddel 3 bathrooms in-kind. no (n) wall, no (e) wall relocation. (n) lighting shall comply w/ cec 150.0(k)3a(k)5Details
replace/remoddel 3 bathrooms in-kind. no (n) wall, no (e) wall relocation. (n) lighting shall comply w/ cec 150.0(k)3a(k)5 | $30,000 |
| Apr 27, 2021 | Expired or cancelled expired Jun 2025 | 65 Graystone Tr | replace kitchen and bathroom fixture in kind no structural , no framing modificationDetails
replace kitchen and bathroom fixture in kind no structural , no framing modification | $25,000 |
| Apr 27, 2021 | Completed final sign-off Jan 2022 | 435 Union St | unit #2: replace kithen fixture in kindDetails
unit #2: replace kithen fixture in kind | $12,000 |
| Oct 15, 2020 | Completed final sign-off Nov 2021 | 1818 20th St | kitchen and bathroom remodel in kind, replace cabinet, sink and flooringDetails
kitchen and bathroom remodel in kind, replace cabinet, sink and flooring | $20,000 |
| Oct 8, 2019 | Completed final sign-off Mar 2020 | 65 Heather Av | open up approx 15% of front facade to fix dry rot.Details
open up approx 15% of front facade to fix dry rot. | $3,000 |
| Jan 2, 2019 | Completed final sign-off Jun 2019 | 1880 Jackson St | #605- int remodel. demo non struct partition walls,transom above int doors in guest rm, recessed tray ceiling in foyer, guest rm, replace vanity sink, faucet, new med cabinet. mstr bed -new closet recessed drapery pocket in ceiling. general work - recessed lght, dimmers, outlets, crown mould, paintDetails
#605- int remodel. demo non struct partition walls,transom above int doors in guest rm, recessed tray ceiling in foyer, guest rm, replace vanity sink, faucet, new med cabinet. mstr bed -new closet recessed drapery pocket in ceiling. general work - recessed lght, dimmers, outlets, crown mould, paint | $90,000 |
| May 18, 2018 | Completed final sign-off Nov 2018 | 2445 Polk St | repair & remodel existing and roof deck. no increase in size. existing roof deck built per 201011034252Details
repair & remodel existing and roof deck. no increase in size. existing roof deck built per 201011034252 | $160,000 |
| May 16, 2018 | Completed final sign-off Oct 2018 | 3430 Baker St | revision to pa# 201711133808 revised structural framing on roof, revised stair framingDetails
revision to pa# 201711133808 revised structural framing on roof, revised stair framing | |
| Mar 5, 2018 | Completed final sign-off Mar 2018 | 2501 Jones St | revision to 201001084448 to delete from previously approved scope of work. delete all work at front facade. all other work to be done.Details
revision to 201001084448 to delete from previously approved scope of work. delete all work at front facade. all other work to be done. | |
| Sep 27, 2017 | Never finaled issued Sep 2017, no final | 2445 Polk St | in-kind replacement of roofing in-kind and repair in-kind at 10 sq. ft. water damage @ (4) locationsDetails
in-kind replacement of roofing in-kind and repair in-kind at 10 sq. ft. water damage @ (4) locations | $35,000 |
| May 9, 2017 | Completed final sign-off Mar 2018 | 2503 Jones St | remove 15-18% of stucco, fix dryrot, replace stucco in kind, visible to street.Details
remove 15-18% of stucco, fix dryrot, replace stucco in kind, visible to street. | $2,000 |
| Mar 17, 2017 | Completed final sign-off Oct 2017 | 428 Collingwood St | structural for water fence tank for water harvesting system. fence to not exceed 6'-0" in height aboce (e) grade ref 201503272078Details
structural for water fence tank for water harvesting system. fence to not exceed 6'-0" in height aboce (e) grade ref 201503272078 | $1,000 |
| Mar 8, 2017 | Never finaled issued Mar 2017, no final | 2445 Polk St | voluntary foundation upgrade per plans. n/a for maher.Details
voluntary foundation upgrade per plans. n/a for maher. | $75,000 |
| Jan 26, 2017 | Completed final sign-off Apr 2017 | 1022 Oak St | replace siding in kind, fix dryrot. no work to front of houe. siding to be replaced in lightwellDetails
replace siding in kind, fix dryrot. no work to front of houe. siding to be replaced in lightwell | $5,000 |
| Jan 25, 2017 | Completed final sign-off Feb 2018 | 225 Dolores St | rear cottage- exploratory demoilition, removal of interior finishes as needed for water damage repair, no exterior work, no structural work.Details
rear cottage- exploratory demoilition, removal of interior finishes as needed for water damage repair, no exterior work, no structural work. | $4,000 |
| Sep 22, 2016 | Completed final sign-off Feb 2018 | 225 Dolores St | understory addition and renovation of residence. improvements to decks; new skylights; minor window & door alterations/replacements in kind. interior remove & replace finishes as neededDetails
understory addition and renovation of residence. improvements to decks; new skylights; minor window & door alterations/replacements in kind. interior remove & replace finishes as needed | $137,000 |
| Jan 28, 2016 | Completed final sign-off Jul 2016 | 2543 Vallejo St | replace (6) concrete squares outside garage door, not public street squares but visable from street. compliance with maher ordinance no 155-13.Details
replace (6) concrete squares outside garage door, not public street squares but visable from street. compliance with maher ordinance no 155-13. | $400 |
| Oct 16, 2015 | Completed final sign-off Mar 2016 | 1880 Jackson St | unit #305: move 1 structural wall add new door to (e) opening and lighting and gypboard, then paint. n/a for maher.Details
unit #305: move 1 structural wall add new door to (e) opening and lighting and gypboard, then paint. n/a for maher. | $15,000 |
| Oct 8, 2015 | Completed final sign-off Jan 2016 | 246 28th Av | convert 2nd flr closet into bathroom at front. remove (e) powder room at backDetails
convert 2nd flr closet into bathroom at front. remove (e) powder room at back | $10,000 |
| Oct 6, 2015 | Completed final sign-off Jul 2016 | 2543 Vallejo St | revision of pa 2015-0505-5338 remove stucco of front and west side of bldg. fix dry rot and replace stucco in kind.Details
revision of pa 2015-0505-5338 remove stucco of front and west side of bldg. fix dry rot and replace stucco in kind. | $500 |
| Sep 18, 2015 | Completed final sign-off Jul 2016 | 562 40th Av | add shower to extg permited bath. no structural modification. work at rear. not inlaw or dwelling unit. no change of use, existing storage to remain.Details
add shower to extg permited bath. no structural modification. work at rear. not inlaw or dwelling unit. no change of use, existing storage to remain. | $3,000 |
| Aug 13, 2015 | Completed final sign-off Dec 2018 | 1333 Jones St | re-fixturing of one kitchen and two bathrooms. re-tiling of bathrooms. all non structural work. n/a ordinance #155-13Details
re-fixturing of one kitchen and two bathrooms. re-tiling of bathrooms. all non structural work. n/a ordinance #155-13 | $40,000 |
| Jul 24, 2015 | Never finaled issued Aug 2015, no final | 65 Lippard Av | relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg.Details
relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg. | $140,000 |
| Jun 22, 2015 | Never finaled issued Jun 2015, no final | 499 Douglass St | change out windows in kind. fix rot out windows back in same size/type south and west walls ground floor retail, reglaze with wood windows inkind.Details
change out windows in kind. fix rot out windows back in same size/type south and west walls ground floor retail, reglaze with wood windows inkind. | $3,000 |
| Jun 9, 2015 | Completed final sign-off May 2016 | 562 40th Av | bathroom remodel, replace in kind,new electric & new plumbing, install bathroom vent/fan, sheetrock and tile,no structural work ,same configuration.Details
bathroom remodel, replace in kind,new electric & new plumbing, install bathroom vent/fan, sheetrock and tile,no structural work ,same configuration. | $10,800 |
| May 5, 2015 | Completed final sign-off Jul 2016 | 2543 Vallejo St | remove stucco fix dry rot and replace stucco on north west side of building about 10% to 12% at front of bldg at garage. replace stucco in kind.Details
remove stucco fix dry rot and replace stucco on north west side of building about 10% to 12% at front of bldg at garage. replace stucco in kind. | $7,500 |
| Mar 27, 2015 | Completed final sign-off Oct 2017 | 428 Collingwood St | horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage levelDetails
horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage level | $190,000 |
| Feb 27, 2015 | Completed final sign-off Oct 2015 | 1870 Jackson St | unit #403: kitchen and 2 bathroom remodel with electrical and plumbing to be included. kitchen replace cabinets, new lighting and replace fixtures. bathroom new lighting and replace fixtures and tiling. no structural work.Details
unit #403: kitchen and 2 bathroom remodel with electrical and plumbing to be included. kitchen replace cabinets, new lighting and replace fixtures. bathroom new lighting and replace fixtures and tiling. no structural work. | $45,000 |
| Feb 4, 2015 | Completed final sign-off Jan 2016 | 499 Douglass St | renovation of interior only, adding plumbing and electrical to support new refrigeration and pos. updating to accessible restroom.Details
renovation of interior only, adding plumbing and electrical to support new refrigeration and pos. updating to accessible restroom. | $40,000 |
| Dec 19, 2014 | Never finaled issued Dec 2014, no final | 499 Douglass St | temporary shoring for existing walls - to put up walls to make structure safe, to the back left hand corner of 1st floor of structure, put back studs that had been cut out.Details
temporary shoring for existing walls - to put up walls to make structure safe, to the back left hand corner of 1st floor of structure, put back studs that had been cut out. | $2,000 |
| Nov 10, 2014 | Completed final sign-off Jan 2015 | 562 40th Av | add a toilet and a sink and build two wall and add a door & electric (rear bldg)Details
add a toilet and a sink and build two wall and add a door & electric (rear bldg) | $4,750 |
| Aug 18, 2014 | Completed final sign-off May 2023 | 2070 Ellis St | proposal for a rear horiz + vert addition (890 sf) to an (e) residence.1st flr: (n) foundation @ rear + structural reinforcement. 2nd flr: (n) stair case, change nursery to home office. 3rd flr: new 2 bedrooms, 1 bathroom,roof deck. 750 sf living, 140 sf roof deck.Details
proposal for a rear horiz + vert addition (890 sf) to an (e) residence.1st flr: (n) foundation @ rear + structural reinforcement. 2nd flr: (n) stair case, change nursery to home office. 3rd flr: new 2 bedrooms, 1 bathroom,roof deck. 750 sf living, 140 sf roof deck. | $175,000 |